Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 115 ]
|
Recommendation to be brought to the attention of Working Parties 3M and 4B
|
BR Study Group Department
|
|
2006-10-30 |
|
[ 114 ]
|
Liaison statement to relevant external organizations and ITU-T Study Groups 13 and 19 (copy to WP 4B, 8D and 8F) - On the development of a PDN Report ITU-R M.[IP CHAR] "Key technical and operational characteristics for access technologies to support IP applications over mobile systems" in response to Question ITU-R 223-1/8
|
WP 8A
|
|
2006-10-30 |
|
[ 113 ]
|
Recommendation to be brought to the attention of WP 4B
|
BR Study Group Department
|
|
2006-09-18 |
|
[ 112 ]
+Ann.1-11 |
Report on the twenty second meeting of Working Party 4B - (Geneva, 28 - 31 August, 1 September 2006)
|
Chairman, WP 4B
|
|
2006-09-04 |
|
[ 111 ]
|
Liaison statement to WP 4A and WP 4B for information - Comments related to the applicability of Recommendation ITU-R S.1432 to the frequency band 18.1-18.3 GHz
|
WP 7B
|
|
2006-09-01 |
|
[ 110 ]
|
Final List of Participants
|
N/A
|
|
2006-08-31 |
|
[ 109 ]
|
Liaison statement to Working Parties 4A and 4B - Draft revision of Recommendation ITU-R BO.1724
|
WP 6S
|
|
2006-08-30 |
|
[ 108 ]
|
List of documents issued
|
BR Study Group Department
|
|
2006-08-25 |
|
[ 107 ]
|
Cross layer protocol model for satellite networks
|
United States of America
|
263/4
|
2006-08-18 |
|
[ 106 ]
+Add.1 |
Working document towards a preliminary Draft New Recommendation - The availability of digital satellite connections - The applicability of the Availability Ratio and Outage Intensity parameters of ITU-T Recommendation G.827 to satellite links
|
United States of America
|
|
2006-08-18 |
|
[ 105 ]
|
Proposed draft new revision of Recommendation ITU-R S.1709
|
United States of America
|
269/4
|
2006-08-18 |
|
[ 104 ]
|
Proposed Draft New Recommendation ITU-R S.[WIDEBAND] - Characteristics of fixed satellite service systems using wideband spreading signals
|
Japan
|
270/4
|
2006-08-18 |
|
[ 103 ]
|
Proposed deletion of the SNG User's Guide
|
European Broadcasting Union (EBU)
|
260/4
|
2006-08-16 |
|
[ 102 ]
|
Proposed preliminary Draft Revision of Recommendation ITU-R S.1061
|
Korea (Republic of)
|
|
2006-08-17 |
|
[ 101 ]
|
Proposed Draft Revision of Recommendation ITU-R S.1062-3
|
Korea (Republic of)
|
75/4
|
2006-08-17 |
|
[ 100 ]
|
Liaison statement to WP's 6J, 4B, 6E, 7C, 7D, 8A, 8B, 8D, 8F, 9B, JTG 6-8-9 and ITU-T SG9 - System characteristics for use in sharing studies with television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the fixed service
|
WP 9D
|
|
2006-07-19 |
|
[ 99 ]
|
Liaison statement to WP 4B and WP 8D (Copy to WP 8F for information) - On the development of a PDNR ITU-R M.[IP CHAR] "Key technical and operational requirements for access technologies to support IP applications over mobile systems"
|
WP 8A
|
223-1/8
|
2006-04-21 |
|
[ 98 ]
(Rev.1) |
Liaison statement - Result of the study under Recommendation 723 (WRC-03)
|
WP 8A
|
|
2006-04-21 |
|
[ 97 ]
|
Proposed revisions to draft CPM text for WRC-07 agenda item 1.19
|
BR Secretariat
|
|
2006-04-19 |
|
[ 96 ]
|
LS to WP 4B - Characteristics of fixed-satellite service systems using wideband spreading signals
|
WP 4A
|
|
2006-04-19 |
|
[ 95 ]
+Ann.1-12 |
Chairman's report - meeting 15-21 March 2006
|
Chairman, WP 4B
|
|
2006-03-21 |
|
[ 94 ]
|
Final list of Participants - Geneva 15-21 March 2006
|
Director, BR
|
|
2006-03-20 |
|
[ 93 ]
|
Liaison statement to WPs 4B, 6E, 7C, 7D, 8A, 8D, 8F, 9B, 9D, JTG 6-8-9 and ITU-T SG 9 - Spectrum usage and operational characteristics of terrestrial electronic news gathering systems (ENG), television outside broadcast (TVOB) and electronic field production (EFP)
|
WP 6J
|
|
2006-03-16 |
|
[ 92 ]
|
List of documents issued
|
BR, Study Group Department
|
|
2006-03-14 |
|
[ 91 ]
|
Requested course of action when revising existing Recommendations, developing new Recommendations or new Reports
|
SG 4 Rapporteur on vocabulary
|
|
2006-03-09 |
|
[ 90 ]
|
Draft revision to Recommendation ITU-R S.1711
|
Korea (Republic of)
|
|
2006-03-06 |
|
[ 89 ]
|
Proposed Preliminary Draft Revision of Recommendation ITU-R S.1061 - Utilization of fade countermeasures strategies and techniques in the fixed-satellite service
|
Korea (Republic of)
|
|
2006-03-06 |
|
[ 88 ]
|
Proposed draft revision of Recommendation ITU-R S.1062-3 - Allowable error performance for a satellite hypothetical reference digital path operating below 15 GHz
|
Korea (Republic of)
|
|
2006-03-06 |
|
[ 87 ]
|
Proposed draft revision of Question ITU-R 46-2/4 - Preferred multiple-access characteristics in the fixed-satellite service
|
Korea (Republic of)
|
|
2006-03-06 |
|
[ 86 ]
|
Liaison statement to Working Party 4B - Reply on comments on the access network transport standards overview
|
ITU-T SG15
|
ITU-T 1/15
|
2006-02-27 |
|
[ 85 ]
|
Liaison statement to WPs 4B, 8F and 9B - New versions of the Access Network Transport (ANT) Standaradization Plan and Work Plan
|
ITU-T SG 15
|
|
2006-02-23 |
|
[ 84 ]
|
Liaison statement to 4A, 4B, 4-9S, 6S, 7B, 7C, 7D - NGN and satellite work; and intersector coordination group on satellite (ICG-SAT) matters
|
ITU-T Study Group 13
|
ITU-T, 10/13
|
2006-02-07 |
|
[ 83 ]
|
Liaison statement to Working Parties 6P, 4B, 6E, 8A, 8D, 8F, 9B, and JTG 6-8-9 - Agenda item 7.1 - Recommendation 723 (WRC-03)
|
WP 9D
|
|
2005-12-21 |
|
[ 82 ]
|
Liaison statement to Working Party 6P with copies to 4B, 6E, 8A, 8D, 8F, 9B and JTG 6-8-9 -
Terrestrial electronic news gathering systems and radio astronomy
|
WP 7D
|
|
2005-11-18 |
|
[ 81 ]
+Ann.1-13 |
Chairman's Report - Meeting 1-8 November 2005
|
Chairman, WP 4B
|
|
2005-11-14 |
|
[ 80 ]
|
Final List of Participants - Working Party 4B
|
Director, BR
|
|
2005-11-07 |
|
[ 79 ]
|
Report on the second meeting of CCV
|
SG 4 Rapporteur on Vocabulary
|
|
2005-11-02 |
|
[ 78 ]
|
List of documents issued
|
BR Study Group Department
|
|
2005-10-31 |
|
[ 77 ]
|
Preliminary draft revision of Recommendation ITU-R S.1001 - Use of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations
|
Convenor, CG on Rec. ITU-R S.1001
|
|
2005-10-27 |
|
[ 76 ]
|
Proposed additional text to DNR "Performance enhancements of transmission control protocol (TCP) over satellite networks"
|
Korea (Republic of)
|
|
2005-10-25 |
|
[ 75 ]
|
proposed modification of preliminary draft revision to Recommendation ITU-R S.1001 -
Use of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations
|
Japan
|
|
2005-10-25 |
|
[ 74 ]
|
Working document towards a PDNR - Characteristics of fixed satellite service systems using wideband spreading signals
|
Japan
|
270/4
|
2005-10-25 |
|
[ 73 ]
|
Revision to Recommendation ITU-R S.1432
|
Japan
|
75/4, 73/4
|
2005-10-25 |
|
[ 72 ]
|
Proposed preliminary draft revision of Recommendation ITU-R S.1062-3 - Allowable error performance for a satellite hypothetical reference digital path operating below 15 GHz
|
Korea (Republic of)
|
|
2005-10-25 |
|
[ 71 ]
(Rev.1-2) |
Liaison statement to Working Parties 4B, 6E, 7D, 8A, 8D, 8F, 9B and JTG 6-8-9 - Spectrum usage and operational characteristics of terrestrial electronic news gathering systems
|
WP 6P
|
|
2005-10-13 |
|
[ 70 ]
|
This document has been withdrawn
|
BR Study Group Department
|
|
2005-06-27 |
|
[ 69 ]
+Ann.1-14 |
Report on the meeting of Working Party 4B, 7-14 June 2005
|
Chairman, WP 4B
|
|
2005-06-20 |
|
[ 68 ]
|
Final list of Participants - Fortaleza, 7-14 June 2005
|
Director, BR
|
|
2005-06-17 |
|
[ 67 ]
|
Liaison statement from WP 4A - A study of FSS systems using wideband spreading signals with regard to Question ITU-R 270/4
|
WP 4A
|
270/4
|
2005-06-08 |
|
[ 66 ]
|
Liaison statement to Working Parties 4B and 8D - Preliminary draft revision of Recommendation ITU-R S.1001 - Use of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations
|
WP 4A
|
|
2005-06-08 |
Results:140 total items. Result page:
-
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):