Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 180 ]
|
Reply liaison statement to ITU-D Study Group 2 (copy to ITU-R Working Parties 4B and 4C)
|
WP 5C
|
|
2011-06-23 |
|
[ 179 ]
|
Points of contact for satellite news gathering licensing
|
BR Study Group Department
|
|
2011-06-23 |
|
[ 178 ]
|
Liaison statement to ITU-R Working Parties 4B and 5C - Question 26/2 - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects
|
ITU-D SG 2
|
|
2011-06-14 |
|
[ 177 ]
|
Liaison statement (copy to WP 6B for information) - Standardized set of test conditions and measurement procedures for the subjective and objective determination of protection ratios for television in the terrestrial broadcasting and the broadcasting-satellite services
|
WP 6A
|
|
2011-06-08 |
|
[ 176 ]
|
Liaison statement to Working Party 4B - Proposal for modification of Recommendation ITU-R BO.789
|
WP 6A
|
60/6
|
2011-06-08 |
|
[ 175 ]
|
Liaison statement to Working Party 4B - Working document towards a preliminary draft new Recommendation ITU-R F.[FDIRMETH] - Methodology for the calculation of aggregate reduction in throughput and definition of fractional degradation in effective information rate for satellite links including those employing Adaptive Coding and Modulation
|
WP 4A
|
|
2011-05-26 |
|
[ 174 ]
|
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - Example of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links
|
WP 4A
|
|
2011-05-24 |
|
[ 173 ]
|
ITU-R Study Group 5 Recommendation ITU-R M.1177-4 to be brought to the attention of Study Groups 1 and 4
|
BR Study Group Department
|
|
2011-05-18 |
|
[ 172 ]
+Ann.1-11 |
Report on the thirtieth meeting of Working Party 4B (Geneva, 2-6 May 2011)
|
Chairman, WP 4B (W)
|
|
2011-05-06 |
|
[ 171 ]
|
Final List of Participants - Working Party 4B (Geneva, 2-6 May 2011)
|
Director, BR (W)
|
|
2011-05-06 |
|
[ 170 ]
|
List of documents issued
|
BR Study Group Department
|
|
2011-04-29 |
|
[ 169 ]
|
Satellite component of IMT
|
Chairman, WP 4C
|
|
2011-04-26 |
|
[ 168 ]
|
Working document towards a preliminary draft new Recommendation ITU-R M.[SATIMT_CIRCUL] - Global circulation of IMT-2000 satellite terminals
|
France
|
|
2011-04-25 |
|
[ 167 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.1850 - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-2000 (IMT-2000)
|
Korea (Republic of)
|
|
2011-04-21 |
|
[ 166 ]
|
Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): SAT-OFDM
|
Korea (Republic of)
|
|
2011-04-21 |
|
[ 165 ]
|
Liaison statement to ITU-D SG 2, ITU-T SG 13 and ITU-R WP 4B
|
WP 5D
|
|
2011-04-21 |
|
[ 164 ]
|
Liaison statement to Working Party 4B - Plan to revise Recommendation ITU-R M.1579 for Global circulation of IMT-2000 terminals
|
WP 5D
|
|
2011-04-20 |
|
[ 163 ]
|
Future work on the satellite component of IMT
|
Chairman, WP 4C
|
|
2011-04-14 |
|
[ 162 ]
|
ITU-R Study Group 6 Recommendation ITU-R BT.1833-1 to be brought to the attention of Study Group 4
|
BR Study Group Department
|
|
2011-04-14 |
|
[ 161 ]
|
Liaison statement to ITU-R Working Parties 4B and 4A
|
ITU-D SG 2
|
|
2011-03-28 |
|
[ 160 ]
|
Liaison statement to ITU-R Working Parties 5D and 4B, ITU-T Question 13
|
ITU-D SG 2
|
|
2011-03-28 |
|
[ 159 ]
|
Study Group 6 Question 128-1/6 to be brought to the attention of Study Group 4
|
BR Study Group Department
|
|
2011-03-25 |
|
[ 158 ]
|
ITU-R Study Group 6 Report ITU-R BT.2049-4 to be brought to the attention of Study Group 4
|
BR Study Group Department
|
|
2011-03-11 |
|
[ 157 ]
(Rev.1) |
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Overview and Work Plan
|
ITU-T SG 15
|
|
2011-03-08 |
|
[ 156 ]
|
Liaison statement to Working Parties 4A and 4B - Examples of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links
|
WP 5B
|
|
2010-11-26 |
|
[ 155 ]
|
Liaison statement to Working Party 4B - Proposed revisions of SNG series Recommendations
|
WP 6B
|
|
2010-11-15 |
|
[ 154 ]
|
Liaison statement to Working Party 4B - Proposed editorial revision of Recommendation ITU-R BO.1130-4 - Systems for digital satellite broadcasting to vehicular, portable and fixed receivers in the bands allocated to BSS (sound) in the frequency range 1 400-2 700 MHz
|
WP 6B
|
|
2010-11-15 |
|
[ 153 ]
|
Liaison statement to Working Party 4B - Proposed treatment of BO series of Recommendations and Reports
|
WP 6B
|
|
2010-11-15 |
|
[ 152 ]
|
Liaison statement to Working Party 4C (for information to Working Parties 4A, 4B, 5A, 5D and 6B) - Preliminary draft new Report ITU-R M.[SAT-IMT-ADVANCED], titled "Vision and requirements for the satellite radio interface(S) of IMT-Advanced"
|
WP 6A
|
|
2010-11-05 |
|
[ 151 ]
|
Possible review of Recommendation ITU-R BO.600 - Standardized set of test conditions and measurement procedures for the subjective and objective determination of protection ratios for television in the terrestrial broadcasting and the broadcasting-satellite services
|
Australia
|
|
2010-10-11 |
|
[ 150 ]
|
Note from the Chairman of Study Group 4 to the Chairmen of Study Group 5 and Working Party 5D (copy to Working Parties 4B and 4C) - Satellite component of IMT
|
SG 4
|
|
2010-09-13 |
|
[ 149 ]
|
Liaison statement to Working Party 4B - Former Working Party 6S Questions jointly attributed to Working Parties 4A and 4B and not yet incorporates into Study Group 4
|
WP 4A
|
|
2010-07-26 |
|
[ 148 ]
+Ann.1-11 |
Report on the twenty ninth meeting of Working Party 4B (Geneva, 5 - 9 July 2010)
|
Chairman, WP 4B
|
|
2010-07-08 |
|
[ 147 ]
(Rev.1) |
Final List of participants - Working Party 4B (Geneva, 5-9 July 2010)
|
Director, BR
|
|
2010-07-09 |
|
[ 146 ]
|
Liaison statement to Working Parties 4A, 4B, 6A, 6B, 6C - Activities on satellite radio interface technology of IMT-ADVANCED
|
WP 4C
|
|
2010-07-08 |
|
[ 145 ]
|
List of documents issued
|
BR Study Group Department
|
|
2010-07-02 |
|
[ 144 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of Radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
|
2010-06-29 |
|
[ 143 ]
|
Preliminary draft new Report ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems
|
Canada
,
Korea (Republic of)
|
46-3/4, 73-2/4
|
2010-06-25 |
|
[ 142 ]
|
Proposed liaison statement to Working Party 6B - Broadcasting of multimedia and data applications for mobile reception
|
France
|
|
2010-06-27 |
|
[ 141 ]
|
Comments on liaison statement from Working Party 6B on proposed revisions of SNG series Recommendations
|
Japan
|
|
2010-06-21 |
|
[ 140 ]
|
Preliminary draft new Report ITU-R S.[IPQOS-RPT] - Quality of service (QoS) architectures, mechanisms and their provisioning in IP-based satellite networks
|
Japan
|
263-1/4
|
2010-06-21 |
|
[ 139 ]
|
Draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems
|
Canada
,
Korea (Republic of)
|
73-2/4, 46-3/4
|
2010-06-21 |
|
[ 138 ]
|
Proposed modification to working document - Terminology used for networks using both satellite and terrestrial links
|
Korea (Republic of)
|
|
2010-06-21 |
|
[ 137 ]
|
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2010-06-22 |
|
[ 136 ]
|
Liaison statement - Consent of Recommendation G.9971 "Requirements of transport functions in IP home networks"
|
ITU-T SG 15
|
|
2010-06-22 |
|
[ 135 ]
|
Liaison statement to Working Party 4B on the treatment of BO Series Recommendations (copy to Working Party 4A for information) - Response to comments on the proposed treatment of Recommendation of former Working Party 6S
|
WP 6B
|
|
2010-05-20 |
|
[ 134 ]
|
Liaison statement to Working Party 4B on the PDRR ITU-R BO.789-2 (copy to Working Party 4A for information) - Proposed revisions to the working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2 - Service requirements for digital sound broadcasting to vehicular portable and fixed receivers for broadcasting-satellite service (sound) in the frequency...
|
WP 6B
|
23/6
|
2010-05-20 |
|
[ 133 ]
|
Liaison statement to Working Party 4B - Broadcasting of multimedia and data applications for mobile reception
|
WP 6B
|
|
2010-05-20 |
|
[ 132 ]
|
Liaison statement to Working Party 4B on proposed revisions of SNG Series Recommendations
|
WP 6B
|
|
2010-05-20 |
|
[ 131 ]
|
Liaison statement to Study Group 6 (copy to Working Party 4B) - Proposed definitions for "Integrated MSS system" and "Hybrid satellite/terrestrial system"
|
Chairman, CCV
|
|
2010-05-13 |
Results:205 total items. Result page:
-
1 -
2 -
3 -
4 -
5
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):