Delayed Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 957 ]
|
DTMF test for G.160
|
LM Ericsson
|
Q6/15
|
2003-10-12 |
|
[ 956 ]
|
Differences between Annex A and proposed new Annex B in ITU-T Recommendation G.769/Y.1242
|
MOC Israel
|
Q5/15
|
2003-10-12 |
|
[ 955 ]
|
Proposed Multiplexing Scheme for a new Annex, G.769/Y.1242
|
MOC Israel
|
Q5/15
|
2003-10-12 |
|
[ 954 ]
|
Performance of Proposed Multiplexing Scheme for Rec. G.769/Y.1242
|
MOC Israel
|
Q5/15
|
2003-10-12 |
|
[ 953 ]
|
Enhancement of APS channel definition in 15.8.2.4/G.709
|
Alcatel SEL
|
Q11/15
|
2003-10-12 |
|
[ 952 ]
|
OTN Linear Protection - ODU SNC/I versus OTU Trail Protection
|
Alcatel
|
Q14/15, Q12/15, Q9/15
|
2003-10-12 |
|
[ 951 ]
|
Structuring Ethernet Private Line specifications
|
Alcatel SEL
|
Q12/15, Q11/15
|
2003-10-12 |
|
[ 950 ]
|
Text proposal for sections 6.6 (topology) and 7 (management) in G.ethna
|
Alcatel SEL
|
Q12/15
|
2003-10-12 |
|
[ 949 ]
|
Proposal of the link resource management model under the authority of the Management Plane
|
NTT
|
Q14/15
|
2003-10-12 |
|
[ 948 ]
|
Proposal to correct the receiver reflectance requirement for 40G VSR interfaces
|
Lucent Technologies Germany
|
Q16/15
|
2003-10-12 |
|
[ 947 ]
|
G.695 Black link parameter values
|
Lucent Technologies Germany
|
Q16/15
|
2003-10-12 |
|
[ 946 ]
|
Correspondence discussion on Extinction ratio for 40GBit/s 80km NRZ interfaces
|
Lucent Technologies Germany
|
Q16/15
|
2003-10-12 |
|
[ 945 ]
|
A Reed Solomon (2720,2550) Code Proposed for Inclusion in G.975.x
|
Lucent Technologies Germany
|
Q18/15
|
2003-10-12 |
|
[ 944 ]
|
Restructuring of G.eota
|
Deutsche Telekom
|
Q11/15
|
2003-10-12 |
|
[ 943 ]
|
Scalability issues of network for Ethernet end-to-end services
|
Deutsche Telekom
|
Q12/15
|
2003-10-12 |
|
[ 942 ]
|
Relation between Ethernet and services different network architectures
|
Deutsche Telekom
|
Q12/15
|
2003-10-12 |
|
[ 941 ]
|
10 Gbit/s NNI for G.etnni
|
Deutsche Telekom
|
Q11/15
|
2003-10-12 |
|
[ 940 ]
|
Maximum length of MAC frames defined in G.etnni and G.euni
|
Deutsche Telekom
|
Q11/15
|
2003-10-12 |
|
[ 939 ]
|
Ethernet UNIs in G.ethsrv
|
Deutsche Telekom
|
Q11/15
|
2003-10-12 |
|
[ 938 ]
|
Ethernet Traffic Conditioning function
|
Alcatel
|
Q12/15
|
2003-10-12 |
|
[ 937 ]
|
EVPLan Architecture
|
Alcatel
|
Q11/15, Q12/15
|
2003-10-12 |
|
[ 936 ]
|
Architectural aspects for Pause Frames
|
Alcatel
|
Q12/15
|
2003-10-12 |
|
[ 935 ]
|
LCAS Drafting Issue 14: Text proposal for hold-off and wait-to-restore timers
|
Lucent Technologies Germany
|
Q11/15, Q9/15
|
2003-10-12 |
|
[ 934 ]
|
LCAS Drafting: Current version of G.806 Body Text
|
Lucent Technologies Germany
|
Q9/15
|
2003-10-11 |
|
[ 933 ]
|
Draft revised Recommendation G.783 (for consent)
|
Editor Rec. G.783
|
Q9/15
|
2003-10-11 |
|
[ 932 ]
|
G.vdsl: Advantages of Dual Linecode for VDSL
|
Infineon Technologies
|
Q4/15
|
2003-10-11 |
|
[ 931 ]
|
A proposed improved FEC for new G.975.X
|
GiGA Aps
,
Siemens AG
|
Q11/15, Q18/15
|
2003-10-11 |
|
[ 930 ]
|
Draft new Recommendation G.7010 (ex-G.euni) (for consent)
|
Editor Rec. G.7010
|
Q11/15
|
2003-10-11 |
|
[ 929 ]
|
Draft revised Recommendation G.707/Y.1322 (for consent)
|
Rapporteur Q.11/15
|
Q11/15
|
2003-10-11 |
|
[ 928 ]
|
OLR in Annex C of G.992.3 & G.992.5
|
ST Microelectronics
|
Q4/15
|
2003-10-11 |
|
[ 927 ]
|
Downstream power cutback in G.992.1 Annex I
|
ST Microelectronics
|
Q4/15
|
2003-10-11 |
|
[ 926 ]
(Rev.1) |
G.992.3/5 Annex C Status
|
ST Microelectronics
|
Q4/15
|
2003-10-11 |
|
[ 925 ]
|
Proposed modification to G.7042 needed from an equipment perspective
|
ITEK
|
Q11/15, Q9/15
|
2003-10-11 |
|
[ 924 ]
|
G.ploam: Power Reduction Parameters for L2 power management state
|
Alcatel Bell
|
Q4/15
|
2003-10-12 |
|
[ 923 ]
|
SELT: Functional Reference Model for G.selt
|
Alcatel Bell
|
Q4/15
|
2003-10-11 |
|
[ 922 ]
|
ADSL: G.992.5: Proposal to align the numbering scheme of G.992.5 with G.992.3 for proposed new annexes
|
Alcatel Bell
|
Q4/15
|
2003-10-11 |
|
[ 921 ]
|
SELT: Derivation of Formula for Computation of Calibrated S11
|
Alcatel Bell
|
Q4/15
|
2003-10-11 |
|
[ 920 ]
|
G.gen: ADSL: G.hs: G.ploam: MAXPSD parameters for G.994.1 downstream tonesets
|
Alcatel Bell
|
Q4/15
|
2003-10-11 |
|
[ 919 ]
|
G.992.3 Annex for an ADSL system with extended upstream bandwidth, operating in the frequency band above POTS
|
Alcatel Bell
|
Q4/15
|
2003-10-11 |
|
[ 918 ]
|
ADSL: G.Ploam: Extension of the valid range of L0-TIME and L2-TIME of L2 Power Management State
|
Alcatel Bell
|
Q4/15
|
2003-10-12 |
|
[ 917 ]
|
Proposal for draft new Recommendation G.fso for optical interfaces Free Space Optics line system for access applications
|
Ministry of Com. India
|
Q16/15
|
2003-10-11 |
|
[ 916 ]
|
Text contribution for section 10.2 & 10.3 in draft new recommendation G.Supdsn
|
Ministry of Com. India
|
Q16/15
|
2003-10-11 |
|
[ 915 ]
|
Proposed application codes for CWDM Linear-chain & Ring configurations and specifications for CDWM OADM in draft Recommendation G.695 for CWDM applications
|
Ministry oc Com. India
|
Q16/15
|
2003-10-11 |
|
[ 914 ]
|
Comments on G.ethsrv
|
Lucent Technologies Nederland
|
Q12/15
|
2003-10-11 |
|
[ 913 ]
|
Server/ETH adaptation in G.ethna
|
Lucent Technologies Nederland
|
Q12/15
|
2003-10-11 |
|
[ 912 ]
|
ETH_CI definition in G.ethna
|
Lucent Technologies Nederland
|
Q12/15
|
2003-10-11 |
|
[ 911 ]
|
Draft revised Recommendation G.7042 version 2 (for consent)
|
Acting Editor Rec. G.7042
|
Q11/15
|
2003-10-10 |
|
[ 910 ]
|
Proposed solution to the ambiguities detected in G.7042
|
Alcatel
|
Q11/15
|
2003-10-10 |
|
[ 909 ]
|
Detected Ambiguities in G.7042
|
Lucent Technologies Germany
|
Q11/15
|
2003-10-10 |
|
[ 908 ]
|
Draft revised Recommendation G.7041/Y.1303 (GFP) Version 2 (for consent)
|
Editor Rec. G.7041/Y.1303
|
Q11/15
|
2003-10-10 |
Results:982 total items. Result page:
-
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):