Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2365 ]
|
Discussion on G.poc upstream transmission
|
Futurewei Technologies US R&D Center
|
Q4A/15, Q2/15, Q1/15
|
2012-08-28 |
|
[ 2364 ]
|
Comments on draft revised Recommendation G.872
|
Deutsche Telekom AG
|
Q12/15
|
2012-08-28 |
|
[ 2363 ]
|
2.5G upstream GPON discussion
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2012-08-28 |
|
[ 2362 ]
|
Scope of G.8275.1
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2361 ]
|
Review of G.8272 latest draft
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2360 ]
|
G.8272: New Appendix describing possible PRTC locations
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2359 ]
|
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2358 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2357 ]
|
Development of a new Appendix of G.8261.1 on PDV generation testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2356 ]
|
G.fast: Dynamic BW allocation
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2355 ]
|
G.fast: Low Complexity FFT/IFFT Scheme
|
Telefon AB - LM Ericsson
|
Q4A/15
|
2012-08-28 |
|
[ 2354 ]
|
G.fast: New cable model for wiring type B05a, CAD55
|
Telefon AB - LM Ericsson
|
Q4A/15
|
2012-08-28 |
|
[ 2353 ]
|
G.fast: Are you willing to give up 6dB of performance gain???
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2352 ]
|
G.fast: Updated measurements and modelling of CAD55 cable
|
Telefon AB - LM Ericsson
|
Q4A/15
|
2012-08-28 |
|
[ 2351 ]
|
Scope of Q2, as applies to access vs. OTN
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2350 ]
|
G.fast: On the adaptation of the G.998.4 DTU format to G.fast
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2349 ]
(Rev.1) |
Modulation format for 100G in G.698.2
|
Deutsche Telekom AG
|
Q6/15
|
2012-08-28 |
|
[ 2348 ]
|
G.fast: Principle Operations Of Layered Modulation
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2347 ]
|
G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC"
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2346 ]
|
VDSL: Amendment of Receiver Initiated SRA following an SOS procedure
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2345 ]
|
G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE"
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2344 ]
|
Consequence of floor delay changes under tight PLL bandwidth
|
RAD Data Communications, Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2343 ]
|
The TVL of Signaling message
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2342 ]
|
Proposal to finalize a Recommendation specifying APS based MPLS-TP linear protection for PTN applications
|
Italy
|
Q9/15, Q14/15, Q10/15
|
2012-08-28 |
|
[ 2341 ]
|
The effect of MAC control pause operation for PTP synchronization
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2340 ]
|
Test error of PRTC
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2339 ]
|
PHY and intra-node noise error
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2338 ]
|
Analysis about SyncE rearrangement for different message delays of G.781
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2337 ]
|
Considerations about APS protocol phases in G.smp
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2336 ]
|
Considerations for Ethernet SD detection using CCM counting
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2335 ]
|
Comments to G.8121 Amd1
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2334 ]
(Rev.1) |
Proposal for inclusion of PtP WDM use cases in G.ngpon2.1
|
ADVA Optical Networking
,
Ericsson, Inc.
,
France Télécom Orange
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2333 ]
(Rev.1) |
Frequency slot assignment of multicarrier OCh
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2332 ]
(Rev.1) |
Requirements on OTN interfaces beyond 100 Gbit/s
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2331 ]
(Rev.1) |
Proposal for future OTN interfaces
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2330 ]
|
G.FAST: On TDD frame size
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2329 ]
|
G.FAST: On LDPC versus RS+TC
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2328 ]
|
G.FAST: On selection of RTX scheme
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2327 ]
|
A proposal to modification of G.709 to add OTU0 frame
|
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2326 ]
|
G.FAST: On dynamic asymmetry ratio
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2325 ]
|
G.FAST: On managing FTTdp functional elements that may have intermitted powering
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2324 ]
|
Proposal of progressing multipoint Ethernet connection protection (MECP) as a formal work item
|
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
|
Q9/15
|
2012-08-28 |
|
[ 2323 ]
|
Ultra-dense WDM metro system
|
Nokia Siemens Networks GmbH & Co. KG
|
Q6/15
|
2012-08-28 |
|
[ 2322 ]
(Rev.1) |
Terminology for Sub-Lambda Photonically Switched Network (SLPSN)
|
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Q3/15, Q12/15
|
2012-08-28 |
|
[ 2321 ]
+Add.1 |
Latest draft of G.8131.1 and some considerations
|
Telecom Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2320 ]
|
Not used
Withdrawn: Reposted as TD762/WP3
|
N/A
|
|
2012-08-28 |
|
[ 2319 ]
|
Technical analysis of PSC protocol for MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2012-08-28 |
|
[ 2318 ]
|
G.fast: Mandatory support of 4096 sub-carriers
|
A1 Telekom Austria AG
,
France Télécom Orange
,
Telecom Italia S.p.A.
,
TeliaSonera AB
|
Q4A/15
|
2012-08-28 |
|
[ 2317 ]
|
Extended RAM Option for Retransmission in VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2316 ]
(Rev.1) |
G.FAST: FTTdp Power Budget
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
Results:452 total items. Result page:
-
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):