Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 665 ]
|
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems
|
Chairman, WP 4C
|
|
2018-02-16 |
|
[ 664 ]
|
Question ITU-R 140-1/6 (brought to the attention of SGs 4 & 5) - Global platform for the broadcasting service
|
SG 6
|
|
2018-02-16 |
|
[ 663 ]
|
Possible modifications to RR Appendix 4 corresponding to Recommendation ITU-R S.1503-3
|
Director, BR
|
|
2018-02-14 |
|
[ 662 ]
|
Examination and publication of notices concerning review of findings under Resolution 85 (WRC-03)
|
Director, BR
|
|
2018-02-14 |
|
[ 661 ]
|
Resolution 49 (Rev. WRC-15) - Administrative due diligence applicable to some satellite radiocommunication services
|
Director, BR
|
|
2018-02-14 |
|
[ 660 ]
|
Typical earth stations in the fixed satellite service information received by BR
|
Director, BR
|
|
2018-02-14 |
|
[ 659 ]
|
Protection criteria of systems in the fixed-satellite service
|
France
|
AI1.16, AI1.14, AI1.13
|
2018-02-13 |
|
[ 658 ]
|
Draft revision of preliminary draft new Recommendation ITU-R S.[50/40 GHZ FSS SHARING METHODOLOGY] - Maximum permissible levels of interference in a satellite network (GSO and non-GSO) in the fixed-satellite service caused by other co-directional FSS networks operating in the 50/40 GHz frequency bands
|
Inmarsat Plc.
|
|
2018-02-13 |
|
[ 657 ]
|
Considerations on the work of ITU-R regarding Radiocommunication Assembly Resolution 69 - Resolution RA-15 69 (development and deployment of international public telecommunications via satellite in developing countries)
|
Cameroon (Republic of)
,
Côte d'Ivoire (Republic of)
|
|
2018-02-13 |
|
[ 656 ]
|
Guidelines for reporting harmful interference for cases of GSO satellite services
|
World Broadcasting Unions - Technical Committee
|
|
2018-02-13 |
|
[ 655 ]
|
Annex 7 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments,and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
|
One Web
|
AI7
|
2018-02-13 |
|
[ 654 ]
|
Proposals on agenda item 9.1 - Issue 9.1.7
|
Germany (Federal Republic of)
|
AI9.1
|
2018-02-13 |
|
[ 653 ]
|
Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9
|
United States of America
|
AI9.1
|
2018-02-13 |
|
[ 652 ]
|
Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
|
United States of America
|
AI9.1
|
2018-02-13 |
|
[ 651 ]
|
Working document towards draft CPM text for WRC-19 agenda item 1.6 - Agenda item 1.6
|
United States of America
|
AI1.6
|
2018-02-13 |
|
[ 650 ]
|
Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz ADJACENT BAND STUDIES] - Protection of EESS (passive) and RAS systems from non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands
|
United States of America
|
AI1.6
|
2018-02-13 |
|
[ 649 ]
|
Proposed operational and regulatory considerations for use of ESIMs in the frequency bands 17.7-19.9 GHz and 27.5-29.5 GHz
|
Kenya (Republic of)
|
AI1.5
|
2018-02-13 |
|
[ 648 ]
|
Proposed changes to Annex 29 to Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5
|
Russian Federation
|
AI1.5
|
2018-02-13 |
|
[ 647 ]
|
Compatibility studies between FSS in the 51.4-52.4 GHz band (Earth-to-space) and EESS (passive) in the 52.6-53 GHz band
|
Russian Federation
|
AI9.1
|
2018-02-13 |
|
[ 646 ]
|
Proposals on WRC-19 agenda item 1.4 in relation to preliminary draft CPM text
|
Russian Federation
|
AI1.4
|
2018-02-13 |
|
[ 645 ]
|
Dependencies between the working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] and the working document towards a preliminary draft new Report ITU-R S.[MOD_NON-GSO]
|
Canada
|
AI7
|
2018-02-13 |
|
[ 644 ]
|
Protection criteria and apportionment for FSS receivers for use in sharing studies under WRC-19 agenda item 1.13
|
Canada
|
AI1.13
|
2018-02-13 |
|
[ 643 ]
|
Working document towards a draft new Recommendation - V-band GSO reference links
|
Canada
|
AI1.6
|
2018-02-13 |
|
[ 642 ]
|
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Canada
|
AI1.5
|
2018-02-13 |
|
[ 641 ]
|
Update on sharing study between EESS and non-GSO FSS in the frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz under WRC-19 agenda item 1.6
|
Canada
|
AI1.6
|
2018-02-13 |
|
[ 640 ]
|
Study of mitigation techniques between non-GSO FSS systems in the 50/40 GHz bands - Agenda item 1.6
|
Canada
|
AI1.6
|
2018-02-13 |
|
[ 639 ]
|
Study of sharing between GSO and non-GSO FSS systems in the 50/40 GHz bands - Agenda item 1.6
|
Canada
|
AI1.6
|
2018-02-13 |
|
[ 638 ]
|
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
|
Canada
|
AI7
|
2018-02-13 |
|
[ 637 ]
|
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
|
Canada
|
AI7
|
2018-02-13 |
|
[ 636 ]
|
Proposed modifications to the working document towards draft CPM text for WRC-19 agenda item 7 - Issue I
|
Canada
|
AI7
|
2018-02-13 |
|
[ 635 ]
|
Proposed modification to the working document towards draft CPM text for WRC-19 agenda item 7 - Issue H
|
Canada
|
AI7
|
2018-02-13 |
|
[ 634 ]
|
Elements for the preliminary draft CPM text for WRC-19 agenda item 1.6
|
Canada
|
AI1.6
|
2018-02-13 |
|
[ 633 ]
|
Modifications to working document towards a preliminary draft new Recommendation ITU-R [LESIM-MS] - Statistical methodologies to estimate the interference from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the fixed-satellite service into mobile service (MS) stations operating in the frequency band 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 632 ]
|
Proposed updates to working document towards a preliminary draft new Report on sharing between 50/40 GHz GSO networks and non-GSO systems - WRC-19 agenda item 1.6
|
United States of America
|
AI1.6
|
2018-02-13 |
|
[ 631 ]
|
Modifications to working document towards a preliminary draft new Report/Recommendation ITU-R [LESIM-FS] - Statistical methodologies to estimate the interference into fixed service stations operating in the 27.5-29.5 GHz frequency band from land earth stations in motion (L-ESIM) communicating with FSS geostationary space stations
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 630 ]
|
Working document towards a PDN Report on sharing between ESIM and stations in the mobile service (WRC-19 agenda item 1.5)
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 629 ]
|
Proposed updates to prelimiary draft new Recommendation ITU-R S.[50/40 GHZ FSS SHARING METHODOLGY]
|
United States of America
|
AI1.6
|
2018-02-13 |
|
[ 628 ]
|
Proposed updates preliminary draft CPM text for WRC-19 agenda item 1.6
|
United States of America
|
AI1.6
|
2018-02-13 |
|
[ 627 ]
|
Proposed revisions to the draft CPM text - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions
|
United States of America
|
AI1.4
|
2018-02-13 |
|
[ 626 ]
|
Input on preliminary draft CPM text for WRC-19 agenda item 7 - Issue K: Inclusion of additional Part B examination under § 5.2.1 of RR Appendix 30 and § 5.2.1 of RR Appendix 30A
|
United States of America
|
AI7
|
2018-02-13 |
|
[ 625 ]
|
Input on working document towards draft CPM text - Issue F: Concerns with the lack of implementation of certain provisions of the radio regulations that can lead to difficulties during the process of entering an assignment into the RR Appendix 30B list
|
United States of America
|
AI7
|
2018-02-13 |
|
[ 624 ]
|
Revisions to preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
|
United States of America
|
AI7
|
2018-02-13 |
|
[ 623 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[NGSO_BIU+MILESTONES] - Studies relating to the bringing into use of frequency assignments for all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
|
United States of America
|
AI7
|
2018-02-13 |
|
[ 622 ]
|
Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6
|
United States of America
|
AI1.6
|
2018-02-13 |
|
[ 621 ]
|
Proposed Working Party 4A response to Working Party 1B liaison statement on agenda item 9.1, issue 9.1.7 pertaining to reducing the coverage area of a satellite to inhibit the use of unauthorized satellite uplink earth terminals
|
United States of America
|
AI9.1
|
2018-02-13 |
|
[ 620 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 619 ]
|
Revisions to workig document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 618 ]
|
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 617 ]
|
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2018-02-13 |
|
[ 616 ]
|
Revisions to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
|
Luxembourg
|
AI7
|
2018-02-13 |
Results:915 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):