International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum Engineering Techniques

Results:287 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 37 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-R Working Parties 1C, 4A, 4B, and 7D) - Protection of EESS (passive) remote sensors against interference caused by radiation from electrical or electronic equipment     WP 7C     2020-10-05
[ 36 ]  
 
Liaison statement to CISPR and CISPR/H (copy to ITU-R Study Groups 1 and Working Parties 1A and 6A) - Additional information about the impact of WPT-EV on LF and MF broadcasting     SG 1 RG on Liaison with CISPR     2020-10-01
[ 35 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan     ITU-T SG15     2020-09-22
[ 34 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2020-09-22
[ 33 ]  
 
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range     WP 7D     2020-09-21
[ 32 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth     WP 3L     2020-08-27
[ 31 ]  
 
Liaison statement to ITU-T Study Group 15 and ITU-R Working Party 1A (copy for information to Working Party 5D) - Utility communication systems     WP 5A     2020-08-07
[ 30 ]  
 
Liaison statement to Working Parties 1A and 4C and CISPR - Interference to maritime systems from light emitting diode (LED) lighting located onboard the same vessel     WP 5B     2020-08-07
[ 29 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz     WP 5C     2020-08-06
[ 28 ]  
 
Reply liaison statement to Working Party 1A - Development of a Recommendation on principles and approaches of limiting unwanted emissions for improving HF electromagnetic environment     WP 5C     2020-08-06
[ 27 ]  
 
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz     WP 5A     2020-08-06
[ 26 ]  
 
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Party 1A for information) - Working document towards a preliminary draft revision of Report ITU-R M.2417-0     WP 5A     2020-08-06
[ 25 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 24 ]  
 
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 - SG2RGQ/200)     ITU-T SG5     2020-07-13
[ 23 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other subordinate groups     Director, BR     2020-06-25
[ 22 ]  
 
Proposal for the revision of relevant existing questions dealing with electromagnetic compatibility and unintentional electromagnetic emissions     Italy     2020-06-19
[ 21 ]  
 
Editorial amendments of Report ITU-R SM.2451-0 - Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services     Italy     2020-06-19
[ 20 ]  
 
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan     ITU-T SG9     2020-05-27
[ 19 ]  
 
Preliminary position on WRC-23 agenda     World Meteorological Organization     2020-05-13
[ 18 ]  
 
Proposed revisions to working document towards a preliminary draft revision of Report ITU-R SM.2392-0     United States of America   Q210/1   2020-05-12
[ 17 ]  
 
Proposed revisions to Report ITU-R SM.2451-0 - Assessment of impact of wireless power transmission for electric vehicle charging on radiocommunication services     United States of America   Q210/1   2020-05-12
[ 16 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R [WPT-EMISSIONS] - Limits and measures to mitigate the impact of wireless power transmission systems on radiocommunications services operating below [30 MHz]     United States of America   Q210/1   2020-05-12
[ 15 ]  
 
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency beam     United States of America   Q210/1   2020-05-12
[ 14 ]  
 
Proposed revisions to working document towards a preliminary draft new Recommendation ITU-R SM.[WPT.BEAM.FRQ]     United States of America   Q210/1   2020-05-12
[ 13 ]  
 
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC     International Special Committee on Radio Interference     2020-05-07
[ 12 ]  
 
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors     European Broadcasting Union     2020-04-16
[ 11 ]  
 
Liaison statement to ITU-R - Request for support from ITU-R concerning publication CISPR 28     International Special Committee on Radio Interference     2020-03-17
[ 10 ]  
 
Reply liaison statement to Working Party 1C (copy to Working Party 1A) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas     WP 5D     2020-03-06
[ 9 ]  
 
Reply liaison statement to ITU-R on Wireless Power Transfer (WPT)     International Special Committee on Radio Interference   Q210/1   2020-03-02
[ 8 ]  
 
Response to liaison statement from the ITU-R on interference from LED lighting to maritime VHF communications     International Special Committee on Radio Interference     2020-03-03
[ 7 ]  
 
Proposed organization of the work of the Study Group 1     Chairman, SG 1     2020-02-26
[ 6 ]  
 
Summary of the main results of RA-19 and CPM23-1 related to Study Group 1     Chairman, SG 1     2020-02-26
[ 5 ]  
 
Information from the Radiocommunication Assembly 2019 on the potential impact of unintentional electromagnetic energy generated by electrical or electronic apparatus     Director, BR     2020-02-25
[ 4 ]  
 
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2020-02-19
[ 3 ]  
 
Liaison on the new version of the Access Network Transport (ANT) standards overview and work plan     ITU-T SG15     2020-02-19
[ 2 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R Working Parties 1A, 1C, 4A, 5A, 5C, 5D and 6A on strategies and policies concerning human exposure to EMF     ITU-D SG2     2019-11-29
[ 1 ]  
 
Documents to be carried over from the 2015-2019 study period     WP 1A     2019-10-31
Results:287 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-31