International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP3K : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP3K  C 

ITU-R WP3K

Point-to-Area Propagation

Results:338 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 88 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3L, 3M, 5A, and 5B) - WRC-23 agenda item 1.4     WP 6A   AI1.4   2021-04-07
[ 87 ]  
 
Activity Report of Correspondence Group 3K-3M-9 - Air-to-Ground Propagation     CG 3K-3M-9     2021-03-30
[ 86 ]  
 
Correspondence Group 3K-3M-12 Activity Report     Rapporteur, CG 3K-3M-12     2021-03-29
[ 85 ]  
 
Report on activities of the Correspondence Group - Building Entry Loss     Chairman, CG 3J-3K-3M-8     2021-03-29
[ 84 ]  
 
Reply liaison statement from Working Party 5D to Task Group 6/1 (copy to ITU-R Working Parties 3K, 3M, 5A, 5B, 5C, 6A, 7D) - Preparations of WRC-23 agenda item 1.5 Information on spectrum use and spectrum needs of existing services including IMT within the frequency band 470-960 MHz in Region 1     WP 5D   AI1.5   2021-03-16
[ 83 ]  
 
Reply liaison statement from Working Party 5D to Task Group 6/1 (copy to Working Parties 3K, 3M, 5A, 5B, 5C, 6A, 7D) - Preparations for WRC-23 agenda item 1.5 - Information for sharing and compatibility studies     WP 5D   AI1.5   2021-03-16
[ 82 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2021-03-15
[ 81 ]  
 
Proposed draft reply liaison statement to Working Party 1A regarding working document towards a preliminary draft revision of Report ITU-R SM.2352-0 (copied to working Parties 3K and 3M for information)     Chairman, WP 3J   Q237/1   2021-02-15
[ 80 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M - Working document towards a preliminary draft revision of Report ITU-R SM.2352-0     WP 1A   Q237/1   2020-12-14
[ 79 ]  
 
Liaison statement to Working Parties 3J, 3K, and 3M - Use of the 252-296 GHz frequency band by the land-mobile service applications     WP 5A   Q256/5   2020-12-01
[ 78 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 3K, 3M, 4A, 5A, 7C, and 7D for information) - WRC-23 agenda item 1.10     WP5C   AI1.10   2020-11-27
[ 77 ]  
 
Reply liaison statement to Working Party 3M (copy to Working Parties 3K, 4A, 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.10 - Possible new allocations to the aeronautical mobile service for the use of non-safety applications     WP 5B   AI1.10   2020-11-23
[ 76 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5D, 6A, and 7D for information) - WRC-23 agenda item 9.1, topic a)     WP 5C   AI9.1A)   2021-01-26
[ 75 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M and 5A for information) - Mitigation techniques and specific conditions to be applied to the fixed service applications in the frequency bands 296-306 GHz, 313-318 GHz and 333-356 GHz, to ensure the protection of Earth exploration-satellite service (passive) applications in accordance with RR No. 5.564A     WP 5C     2020-11-20
[ 74 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M and 5C for information) - Assessment of mitigation techniques and specific conditions to be applied to the land-mobile service applications in the frequency bands 296-306 GHz, 313-318 GHz and 333-356 GHz, to ensure the protection of Earth exploration-satellite service (passive) applications...     WP 5A     2020-11-20
[ 73 ]  
 
Reply liaisons statement to Working Parties 3K and 3M (copy for information to Working Parties 5A, 5B, 5C, 5D, 6A and 7D) - Issues related to propagation for sharing studies in Task Group 6/1     TG 6/1   AI1.5   2020-10-26
[ 72 ]  
 
Liaison statement from Task Group 6/1 to contributing Working Parties 5A, 5B, 5C, 5D, 6A and 7D (copy to Working Parties 3K and 3M for information) - Preparations for WRC-23 agenda item 1.5 - Information for sharing and compatibility studies     TG 6/1   AI1.5   2020-10-26
[ 71 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M - WRC-23 agenda item 1.4     WP 5D   AI1.4   2020-10-27
[ 70 ]  
 
Reply liaison statement to ITU-R Working Parties 3K and 3M (copy to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C, and 7D for information) - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-10-21
[ 69 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3L, 3M, 5A, and 5B) - WRC-23 agenda item 1.4     WP 6A   AI1.4   2020-10-19
[ 68 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 5A, 5B, 5C, 5D and 7D) - WRC-23 agenda item 9.1, topic a)     WP 6A   AI9.1A)   2021-01-26
[ 67 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 3K, 3L, 3M, 5A and 5B) - WRC-23 agenda item 1.12     WP 6A   AI1.12   2020-10-16
[ 66 ]  
(Rev.1) 
Reply liaison statement to Working Parties 3K and 3M (copy to Working Party 5D for information) - Preliminary draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]     WP 7B     2020-10-08
[ 65 ]  
 
Liaison statement to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7D - Work to be conducted by Working Party 7C under WRC-23 agenda item 9.1, topic a)     WP 7C   AI9.1A)   2021-01-26
[ 64 ]  
(Rev.1) 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B 4C 6A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2     WP 7C   AI1.2   2020-10-05
[ 63 ]  
+Ann.1-20 
Report on the meeting of Working Party 3K (e-Meeting, 10-20 August 2020)     Chairman, WP 3K     2020-08-20
[ 62 ]  
 
Final list of participants - Working Party 3K (E-meeting, 10-20 August 2020)     Director, BR     2020-08-20
[ 61 ]  
 
List of Documents issued (Documents 3K/1 - 3K/61)     BR, Study Groups Department     2020-08-10
[ 60 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2     WP 5C   AI1.2   2020-08-07
[ 59 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz     WP 5C     2020-08-06
[ 58 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5C, 7C and 7D - WRC-23 agenda item 1.10 - New allocations to the aeronautical mobile service for the use of non-safety applications     WP 5B   AI1.10   2020-08-06
[ 57 ]  
 
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - "Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz"     WP 5A     2020-08-06
[ 56 ]  
 
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Party 1A for information) - Working document towards a preliminary draft revision of Report ITU-R M.2417-0     WP 5A     2020-08-06
[ 55 ]  
 
Liaison statement to ITU-R working parties 3K and 3M - WRC-23 agenda item 1.3     WG 5A   AI1.3   2020-08-05
[ 54 ]  
 
Python implementation of an ITU-R propagation framework     European Space Agency , Austria , Belgium , Czech Technical University in Prague, Faculty of Electrical Engineering     2020-08-03
[ 53 ]  
 
Preliminary draft new Recommendation ITU-R P.[DIGPROD] - Acquisition, presentation, analysis and use of digital products in studies of radiowave propagation     CG 3M-4     2020-08-04
[ 52 ]  
 
Decorrelation distance     Broadcast Networks Europe     2020-08-03
[ 51 ]  
 
Proposed Working Party 3K and Working Party 3M actions for Task Group 6/1 on WRC-23 agenda item 1.5     European Broadcasting Union   AI1.5   2020-08-03
[ 50 ]  
 
Liaison statement proposal to ITU-R Working Party 5D regarding the Earth-to-space clutter loss model in Recommendation ITU-R P.2108     China (People's Republic of)     2020-08-03
[ 49 ]  
 
[Draft] support document for proposed draft revision of Recommendation ITU-R P.1409-1 (Annex 13 to Working Party 3M Chairman's Report) - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 1 GHz     Japan     2020-08-03
[ 48 ]  
 
[Draft] reply liaison statement to Working Party 5D - Information for studies on WRC-23 agenda item 1.4     Japan   AI1.4   2020-08-03
[ 47 ]  
 
Proposed revisions to Recommendation ITU-R P.1812-5 - Treatment of clutter and extension to around 6 GHz     United Kingdom of Great Britain and Northern Ireland     2020-07-31
[ 46 ]  
 
Contribution to Recommendation ITU-R P.1238 - Multi-band measurements in various indoor environment     United Kingdom of Great Britain and Northern Ireland     2020-07-31
[ 45 ]  
 
Proposed Editorial amendments to Recommendation ITU-R P.528-4 - A propagation prediction method for aeronautical mobile and radionavigation services using the VHF, UHF and SHF bands     United States of America     2020-07-29
[ 44 ]  
(Rev.1) 
Contribution document - Clutter loss measurements at 26 GHz     United Kingdom of Great Britain and Northern Ireland     2020-08-01
[ 43 ]  
 
Proposed revision to Report ITU-R P.2345-1 - Propagation model for Recommendation ITU-R P.528-3     United States of America     2020-07-29
[ 42 ]  
 
Indoor measurement data, frequencies below 1 GHz     ORANGE POLSKA S.A.     2020-07-31
[ 41 ]  
 
Comparison of measurements with prediction using Recommendation ITU-R P.1546 and Recommendation ITU-R P.1812     ORANGE POLSKA S.A.     2020-07-31
[ 40 ]  
 
On Recommendation ITU-R P.1238 - Path loss measurements and modelling analysis from indoor factory industrial environments at 3.5 GHz and 28 GHz     Nokia Corporation     2020-08-01
[ 39 ]  
 
Draft revision to Recommendation ITU-R P.1238-10     United States of America     2020-07-29
Results:338 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-22