Contributions
[ AI/Question: 2/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 400 ]
|
Propose to add requirement of discovery support on MPLS-TP NM Requirement
|
ZTE Corporation
|
Q14/15, Q12/15
|
2009-09-15 |
|
[ 394 ]
|
Rooted mp FDFr
|
Alcatel Shanghai Bell
,
CATR
,
MII
|
Q12/15
|
2009-09-14 |
|
[ 361 ]
|
Considerations and Proposal for Using OTN for GPON Reach Extension
|
PMC-Sierra
|
Q2/15, Q11/15
|
2009-09-08 |
|
[ 347 ]
|
Living list for G.xgpon.4
|
Sweden
|
2/15
|
2009-05-05 |
|
[ 346 ]
|
Initial draft of G.xgpon.4 OMCI for XGPON
|
Ericsson AB, Sweden
|
Q2/15
|
2009-05-05 |
|
[ 345 ]
|
Living List for XG-PON Transmission Convergence layer specification
|
Huawei, Motorola, Mitsubishi
|
Q2/15
|
2009-05-05 |
|
[ 344 ]
|
XG-PON Transmission Convergence layer specification
|
Motorola, Huawei, Mitsubishi
|
Q2/15
|
2009-05-05 |
|
[ 343 ]
|
Proposal for Living List for proposed new standard "10-Gigabit-capable Passive Optical Networks (XG-PON): Physical Media Dependent (PMD) layer Specification"
|
Alcatel-Lucent, Hitachi, ZTE
|
Q2/15
|
2009-05-05 |
|
[ 342 ]
|
Proposal to standardize "10-Gigabit-capable Passive Optical Networks (XG-PON): Physical Media Dependent (PMD) layer Specification"
|
Alcatel-Lucent, Hitachi, ZTE
|
Q2/15
|
2009-05-05 |
|
[ 341 ]
|
Living List for proposed "10Gigabit-capable Passive Optical Networks (XG-PON): General Requirements"
|
AT&T, France Telecom, NTT
|
Q2/15
|
2009-05-05 |
|
[ 340 ]
|
Proposal to standardize "10Gigabit-capable Passive Optical Networks (XG-PON): General Requirements"
|
AT&T, France Telecom, NTT
|
Q2/15
|
2009-05-05 |
|
[ 339 ]
|
G.xgpon Definitions, Abbreviations, and Acronyms
|
Ericsson AB, France Telecom, Huawei, Motorola, ZTE
|
Q2/15
|
2009-05-05 |
|
[ 336 ]
|
G.984.4 Implementer's Guide
|
Huawei Technologies Co.,Ltd.
|
Q2/15
|
2008-11-26 |
|
[ 320 ]
|
G.800 Terminology and Backward Compatibility with G.805
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 319 ]
|
G.800 Description of Media Networks
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 318 ]
|
G.800 Interconnect Entities
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 298 ]
|
Clarifications on Key Management in GPON System
|
ZTE Corporation
|
Q2/15
|
2008-11-23 |
|
[ 295 ]
(Rev.1) |
Proposal to consider node resource management in G.8080 for WSON
|
ZTE Corporation
|
Q12/15
|
2008-11-23 |
|
[ 271 ]
|
Restoration exercise
|
ZTE Corporation
|
Q14/15, Q12/15
|
2008-11-23 |
|
[ 254 ]
|
Solution of fast GPON switching in long-reach PON scenario
|
Huawei technologies
|
Q2/15
|
2008-11-21 |
|
[ 253 ]
|
Proposal to support phase synchronization in GPON system
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-21 |
|
[ 252 ]
|
Proposal to support ONT survival time attribute in G.984.4
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-21 |
|
[ 251 ]
|
Proposal on Continuous Mode of LR-PON
|
Huawei Technologies Co., Ltd. RAD Data communicati
|
Q2/15
|
2008-11-21 |
|
[ 238 ]
|
PBBN model for G.8010
|
BT plc
|
Q12/15
|
2008-11-21 |
|
[ 237 ]
|
VLAN model in G.8010
|
BT plc
|
Q12/15
|
2008-11-21 |
|
[ 236 ]
|
Modelling the Dynamic Behaviour of the Transport Network
|
BT plc
|
Q12/15
|
2008-11-21 |
|
[ 235 ]
|
Use of Configuration and the Concept of a 'Virtual Function' as the Foundation of the Dynamic Aspects of the Unified Model
|
BT plc
|
Q12/15
|
2008-11-21 |
|
[ 227 ]
|
Some Considerations and Proposals about T-MPLS and MPLS-TP Standardization
|
CATR, MII China, CMCC
|
Q12/15
|
2008-11-21 |
|
[ 225 ]
|
Proposal of control plane protocol stack in G.984.1
|
MII China
|
Q2/15
|
2008-11-21 |
|
[ 173 ]
|
On the need to distribute accurate phase/Time-of-Day over xPON networks
|
RAD Data Communications, Huawei
|
Q2/15, Q13/15
|
2008-11-21 |
|
[ 159 ]
|
Proposal of modification of Network Call Controller (NCC) in G.8080
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q12/15
|
2008-11-21 |
|
[ 158 ]
|
Proposal of modification of interlayer relationships for VCAT and control-plane protection in G.8080 and 2
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q12/15
|
2008-11-21 |
|
[ 155 ]
|
Examples of surfaces
|
BT plc
|
Q12/15
|
2008-11-21 |
|
[ 151 ]
|
Generic Associated Channel (G-ACH) as New MCC/SCC for T-MPLS in G.7712
|
Alcatel-Lucent
|
Q14/15, Q12/15
|
2008-11-21 |
|
[ 134 ]
|
Solution of fast GPON switching in long-reach PON scenario
|
Huawei technologies
|
Q2/15
|
2008-11-20 |
|
[ 133 ]
|
Proposal to support phase synchronization in GPON system
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-20 |
|
[ 132 ]
|
Proposal to support ONT survival time attribute in G.984.4
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-20 |
|
[ 131 ]
|
Proposal on Continuous Mode of LR-PON
|
Huawei Technologies Co., Ltd. RAD Data communication Ltd.
|
Q2/15
|
2008-11-20 |
|
[ 129 ]
|
Proposal for PON splitter specifications in G.671 revision
|
NTT
|
Q7/15, Q2/15
|
2008-11-20 |
|
[ 127 ]
|
Ethernet Ring Topology Proposal
|
ADTRAN
|
Q9/15, Q14/15, Q12/15
|
2008-11-20 |
|
[ 77 ]
|
Proposal for clarifying downstream priority queues
|
ADTRAN
|
Q2/15
|
2008-11-19 |
|
[ 76 ]
|
Introducing the MAC layer
|
Huawei Technologies Co., Ltd.
|
Q12/15
|
2008-11-19 |
|
[ 70 ]
|
Atomic and compound information entities
|
Huawei Technologies Co., Ltd.
|
Q12/15
|
2008-11-19 |
|
[ 68 ]
|
Specifications proposal to G.gbe
|
NEC, Fujitsu, NTT
|
Q2/15
|
2008-11-19 |
|
[ 67 ]
|
Liaison statement proposal on G.gbe
|
NEC, Fujitsu
|
Q2/15
|
2008-11-19 |
|
[ 66 ]
|
Comments on the Software image download in G.984.4 Revised 2008-Am2
|
Hitachi
|
Q2/15
|
2008-11-19 |
|
[ 47 ]
|
PON splitter values
|
Corning Incorporated
|
Q7/15, Q2/15
|
2008-11-18 |
|
[ 46 ]
|
PON splitter values - Change to wavelength range
|
Corning Incorporated
|
Q7/15, Q2/15
|
2008-11-18 |
|
[ 41 ]
|
G.8080 - SP10 - call routing
|
Nortel Networks (Canada)
|
Q12/15
|
2008-11-18 |
|
[ 40 ]
|
Proposed inclusion of a PBB model in G.8021
|
Nortel Networks (Canada)
|
Q9/15, Q12/15
|
2008-11-18 |
Results:307 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):