International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport, access and home

Study Period 2022

Results:1240 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 998 ]  
 
Detailed ME proposal for G.FIN.NM     China Unicom , Huawei Technologies Co., Ltd. (China)   Q3/15   2024-06-17
[ 997 ]  
 
B1T path layer frame format     ADTRAN Holdings Inc. (United States) , China Information Communication Technologies Group   Q11/15   2024-06-17
[ 996 ]  
 
The initial thoughts on the protocol of G.WMCI.     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q3/15   2024-06-17
[ 995 ]  
 
B1T OTN layering     China Information Communication Technologies Group , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) (China)   Q11/15   2024-06-17
[ 994 ]  
 
Proposal to add new contents for the draft L.pcc     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q7/15   2024-06-17
[ 993 ]  
 
Proposals to update G.661 about the ROPA     China Unicom , ZTE Corporation (China)   Q6/15   2024-06-17
[ 992 ]  
(Rev.1) 
Considerations on port state decision based on enhanced accuracy TLV     China Information Communication Technologies Group   Q13/15   2024-06-17
[ 991 ]  
 
Further considerations about the transceiver for the 4.8T and 6T bands     China Information Communication Technologies Group , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q6/15   2024-06-17
[ 990 ]  
(Rev.1) 
Text proposal on use cases and high-level design requirements for G.Suppl-FTS     China Information Communication Technologies Group   Q13/15   2024-06-17
[ 989 ]  
 
Proposal of revision of G Suppl. 55     National Institute of Information and Communications Technology (NICT) (Japan)   Q2/15   2024-06-17
[ 988 ]  
 
Text proposal for OTN interfaces in G.781     China Information Communication Technologies Group   Q13/15   2024-06-17
[ 987 ]  
 
Considerations about the system architectures of G.dfos     Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q6/15   2024-06-17
[ 986 ]  
 
Considerations for out-of-band and in-band sensing wavelength options for new draft ITU-T Rec. G.dfos     Ministry of Communications (India) , Sterlite Technologies Limited (India)   Q6/15   2024-06-17
[ 985 ]  
 
Baseline draft on new Recommendation L.nis "Technical and functional requirements for network infrastructures sharing"     Ministry of Communications (India)   Q7/15   2024-06-17
[ 984 ]  
 
Modulation formats and transceiver configurations for vHSP     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q2/15   2024-06-17
[ 983 ]  
 
Text proposal for WP1 TP on Broadband access & in-premises network     Nokia Corporation (Finland)   Q4/15   2024-06-17
[ 982 ]  
 
Considerations on B1T OTN     China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q11/15   2024-06-17
[ 981 ]  
(Rev.1) 
G.supPONsecurity: Text Proposal for Duplicate-ONU-SN issue     Nokia Corporation (Finland)   Q2/15   2024-06-17
[ 980 ]  
 
M+1 fgOTN protection application in power grid communication network     Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China   Q11/15   2024-06-17
[ 979 ]  
 
Mapping of multiple E1 signals into fgOPUflex(1) proposal     Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China   Q11/15   2024-06-17
[ 978 ]  
 
G.709 AM3 corrigendum     Huawei Technologies Co., Ltd. (China)   Q11/15   2024-06-17
[ 977 ]  
 
Considerations on the B1T frame structure     Huawei Technologies Co., Ltd. (China)   Q11/15   2024-06-17
[ 976 ]  
 
Analysis and considerations of B1T LO and HO ODU path     China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China)   Q11/15   2024-06-17
[ 975 ]  
(Rev.1) 
Update and revise electrical characteristics for optical electrical hybrid cable     China Information Communication Technologies Group   Q5/15   2024-06-17
[ 974 ]  
 
Port recognition for ODN visualization     ZTE Corporation (China)   Q2/15   2024-06-17
[ 973 ]  
(Rev.1) 
G.sup.VHSP: some proposals for the coherent PON     China Information Communication Technologies Group   Q2/15   2024-06-17
[ 972 ]  
(Rev.1) 
G.sup.VHSP: several technical variants for IMDD TDM PON     China Information Communication Technologies Group   Q2/15   2024-06-17
[ 971 ]  
 
Proposed revisions for Recommendation G.652     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q6/15, Q5/15, Q2/15   2024-06-17
[ 970 ]  
 
Considerations for Wavelength Band Expansion in 800G DWDM Systems     KDDI Corporation (Japan) , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q6/15   2024-06-17
[ 969 ]  
 
Additional details about WTR for G.8275.1 and G.8275.2     Ciena Canada   Q13/15   2024-06-16
[ 968 ]  
 
Clarification on T-GM behavior in Acquiring state     Ciena Canada   Q13/15   2024-06-16
[ 967 ]  
 
Field trial results about C6T+L6T 800G DWDM applications     China Information Communication Technologies Group , China Telecommunications Corporation   Q6/15   2024-06-15
[ 966 ]  
 
Security Threats Proposal for FTTR-4B     Huawei Technologies Co., Ltd. (China)   Q3/15   2024-06-15
[ 965 ]  
(Rev.1) 
G.988: Traffic descriptor update for 50G-PON     Futurewei Technologies Inc. (United States) , Huawei Technologies Co., Ltd. (China)   Q2/15   2024-06-15
[ 964 ]  
(Rev.1) 
Proposal update to clause 8.4.9 of ITU-T G.Sup72     China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China , ZTE Corporation (China)   Q14/15, Q12/15   2024-06-14
[ 963 ]  
(Rev.1) 
Proposal update to G.7711 clauses 2, 5, 6, A.1, I, I.13 and bibliography for v5.0     China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China   Q14/15, Q12/15   2024-06-14
[ 962 ]  
(Rev.1) 
Proposal update to G.7711 Appendix XVII "Controller Lifecycle and Security" for v5.0     China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China   Q14/15, Q12/15   2024-06-14
[ 961 ]  
(Rev.1) 
Proposal update to G.7711 Annex R "Temporal Expression" for v5.0     China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China   Q14/15, Q12/15   2024-06-14
[ 960 ]  
(Rev.1) 
Proposal update to G.7711 Annex O "Compute" for v5.0     China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China   Q14/15, Q12/15   2024-06-14
[ 959 ]  
(Rev.1) 
Proposal update to G.7711 Annex I "OAM" for v5.0     China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China   Q14/15, Q12/15   2024-06-14
[ 958 ]  
 
Proposal update to G.7711 Annex H "Control model" for v5.0     China Information Communication Technologies Group , China Telecommunications Corporation , State Grid Corporation of China   Q14/15, Q12/15   2024-06-14
[ 957 ]  
(Rev.1) 
Clarifications to proposed Self-Tuning Mechanism for revised G.698.4     Lumentum (United States) , NEC Corporation (Japan)   Q6/15   2024-06-14
[ 956 ]  
 
G.hn: G9961 updates for the hierarchical bidirectional transmission     Maxlinear Inc (United States)   Q3/15   2024-06-14
[ 955 ]  
 
G.hn: G9960 pending updates for the hierarchical bidirectional transmission     Maxlinear Inc (United States)   Q3/15   2024-06-14
[ 954 ]  
 
Initial draft of Technical Paper section describing Q2/15 work     Futurewei Technologies Inc. (United States)   Q4/15, Q3/15, Q2/15, Q1/15   2024-06-14
[ 953 ]  
 
Proposal for way forward on G.9804.4 (50G TWDM-PON)     Futurewei Technologies Inc. (United States)   Q2/15   2024-06-14
[ 952 ]  
(Rev.1) 
Text proposal for draft revised Recommendation G.698.4     China Unicom , Telefon AB - LM Ericsson (Sweden)   Q6/15   2024-06-14
[ 951 ]  
 
Crosstalk calculation with the self-tuning method proposed in WD06-26 (Berlin, 16-18 April 2024)     China Unicom , Telefon AB - LM Ericsson (Sweden)   Q6/15   2024-06-14
[ 950 ]  
(Rev.1) 
Considerations on 50G-PON dual-rate receiving ability     China Telecommunications Corporation   Q2/15   2024-06-14
[ 949 ]  
 
Proposed text refresh of 50G upstream parameters in G.9805     China Telecommunications Corporation   Q2/15   2024-06-14
Results:1240 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-07-05