Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 158 ]
|
Dual-Homing Coordination for MPLS-TP
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q9/15, Q14/15, Q10/15
|
2017-06-05 |
|
[ 157 ]
|
Requirements of future 5G mobile transport network
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2017-06-05 |
|
[ 156 ]
|
Proposal to start the work for the revision of G.9973
|
Fujitsu Limited (Japan)
,
Japan Advanced Institute of Science and Technology
,
Mitsubishi Electric Corporation
|
Q18/15
|
2017-06-05 |
|
[ 155 ]
|
The Relationship between Management and SDN controller
|
China Unicom
|
Q14/15, Q12/15
|
2017-06-05 |
|
[ 154 ]
|
Proposal to start new projects to specify 5G transport over OTN
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
,
Microsemi Corporation (United States)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2017-06-05 |
|
[ 153 ]
|
Cascaded protection
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q9/15, Q11/15
|
2017-06-05 |
|
[ 152 ]
|
Consideration on partial rate granularity of FlexE aware signal on each PHY
|
Fujitsu Limited (Japan)
|
Q11/15
|
2017-06-05 |
|
[ 151 ]
|
OTN interface protection
|
China Unicom
|
Q9/15, Q11/15
|
2017-06-05 |
|
[ 150 ]
|
G.mgfast: Proposing some basic agreements
|
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-05 |
|
[ 149 ]
|
Comments on draft new Recommendation L.110 (ex L.dsa)
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q16/15
|
2017-06-05 |
|
[ 148 ]
|
Proposal for G.977.1 study points
|
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q8/15
|
2017-06-05 |
|
[ 147 ]
|
Proposed work program for G.7711
|
Fujitsu Limited (Japan)
|
Q14/15
|
2017-06-05 |
|
[ 146 ]
|
Proposed MI lists for Clause 7 in G.8152
|
Fujitsu Limited (Japan)
|
Q14/15
|
2017-06-05 |
|
[ 145 ]
|
Comments and Concern on CSF for G.8113.2 and G.8121.2
|
Fujitsu Limited (Japan)
|
Q10/15
|
2017-06-05 |
|
[ 144 ]
|
Proposed update to CSF for G.8121
|
Fujitsu Limited (Japan)
|
Q10/15
|
2017-06-05 |
|
[ 143 ]
|
Proposed initial text of MSRP to G.8121
|
Fujitsu Limited (Japan)
|
Q9/15, Q10/15
|
2017-06-05 |
|
[ 142 ]
|
Querying and notification mechanism for Ethernet Linear APS protocol status
|
NEC Corporation (Japan)
|
Q9/15, Q14/15, Q10/15
|
2017-06-05 |
|
[ 141 ]
|
Proposed test for clause 6.4 of draft revised Recommendation G.7712/Y.1703
|
Alcatel-Lucent Shanghai Bell
|
Q14/15
|
2017-06-05 |
|
[ 140 ]
|
Propose G.7712/Y.1703 to align with G.872 for Figure 6-17
|
Alcatel-Lucent Shanghai Bell
|
Q14/15
|
2017-06-05 |
|
[ 139 ]
|
Editorial Comments for G.874
|
Alcatel-Lucent Shanghai Bell
|
Q14/15
|
2017-06-05 |
|
[ 138 ]
|
Proposed additional text for G.874 clause 6.1.4.1.1 to cover OTUCn GCC0
|
Alcatel-Lucent Shanghai Bell
|
Q14/15
|
2017-06-05 |
|
[ 137 ]
|
Consideration for 1000BASE-T and 10GBASE-T Interfaces on G.8273.2
|
NEC Corporation (Japan)
|
Q13/15
|
2017-06-05 |
|
[ 136 ]
|
G.8273.3 Editorial comments
|
NEC Corporation (Japan)
|
Q13/15
|
2017-06-05 |
|
[ 135 ]
|
Consideration of synchronizationUncertain flag
|
NEC Corporation (Japan)
|
Q13/15
|
2017-06-05 |
|
[ 134 ]
|
Proposal on the revision of G.651.1 and G.Sup.40
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q5/15
|
2017-06-05 |
|
[ 133 ]
|
G.vdsl: Support of eoc datagram
|
Nokia Corporation
|
Q4/15
|
2017-06-05 |
|
[ 132 ]
|
A generic functional model for MPLS-TP Shared Ring Protection in G.8132
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q9/15
|
2017-06-05 |
|
[ 131 ]
|
Proposed text for network objectives in G.8132
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q9/15
|
2017-06-05 |
|
[ 130 ]
|
Proposal of the new Appendix IV to revised ITU-T Rec. L.109/L.60 Construction of optical/metallic hybrid cables
|
Orange (France)
,
ORANGE POLSKA S.A.
|
Q16/15
|
2017-06-05 |
|
[ 129 ]
|
Proposed revision of L.314/L.85 to include live fibre detection in PONs
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q17/15
|
2017-06-05 |
|
[ 128 ]
|
Update profile version and clarify TableA.8 for G.8275.1
|
NEC Corporation (Japan)
|
Q13/15
|
2017-06-05 |
|
[ 127 ]
|
Add the data set parameter for multicast MAC address in G.8275.1
|
NEC Corporation (Japan)
|
Q13/15
|
2017-06-05 |
|
[ 126 ]
|
Additional data set parameters for sync management in G.7711
|
NEC Corporation (Japan)
|
Q14/15, Q13/15
|
2017-06-05 |
|
[ 125 ]
|
Proposal on revision of G.650.1 for cut-off wavelength measurement
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q5/15
|
2017-06-05 |
|
[ 124 ]
|
Comments on the draft G.8132/Y.1383
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q9/15
|
2017-06-05 |
|
[ 123 ]
|
Comments on the draft G.873.3
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q9/15
|
2017-06-05 |
|
[ 122 ]
|
AT&T OpenOMCI
|
AT&T, Inc. (United States)
|
Q2/15
|
2017-06-05 |
|
[ 121 ]
|
Skeleton and the proposed text for draft L.cci
|
Waseda University
|
Q16/15
|
2017-06-05 |
|
[ 120 ]
|
Considerations about the work in support of the 5G transport
|
China Unicom
,
CAICT
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-05 |
|
[ 119 ]
|
proposals about the modification of Appendix V of G.959.1
|
China Unicom
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-05 |
|
[ 118 ]
|
proposals about a minimum capability of 100G receiver for EVM in G.698.2
|
China Unicom
,
CAICT
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-05 |
|
[ 117 ]
|
Proposed modification to the texts of draft L.110 (Currently L.dsa) in TD341(WP2/15)
|
Waseda University
|
Q16/15
|
2017-06-05 |
|
[ 116 ]
|
Proposed revision to clause 8.3.2, "For radiocommunication systems in bands above 6 GHz" in G.RoF
|
National Institute of Information and Communications Technology
|
Q2/15
|
2017-06-05 |
|
[ 115 ]
|
Discussion on types of the boxes and scope of the new Rec L.fdb
|
Ministry of Industry and Information Technology (MIIT) (China)
,
China Unicom
,
FiberHome
|
Q16/15
|
2017-06-05 |
|
[ 114 ]
|
Proposal for OD/OM related issues in G.metro
|
FiberHome Technologies Group (China)
|
Q6/15
|
2017-06-05 |
|
[ 113 ]
|
Suggestions on OTN simplification for 5G and DCI applications
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2017-06-05 |
|
[ 112 ]
|
Proposals to modify the structure of L.108/L.79
|
Ministry of Industry and Information Technology (MIIT) (China)
,
YOFC
|
Q16/15
|
2017-06-05 |
|
[ 111 ]
|
Discussions and comments for draft new Rec. L.wdc
|
Ministry of Industry and Information Technology (MIIT) (China)
,
China Unicom
,
Huawei
|
Q17/15
|
2017-06-05 |
|
[ 110 ]
|
Draft new Rec. L.fdb "Requirements for Passive Optical Nodes: Fibre Distribution Box" (initial draft)
|
Ministry of Industry and Information Technology (MIIT) (China)
,
China Unicom
,
Commscope
,
FiberHome
|
Q16/15
|
2017-06-05 |
|
[ 109 ]
|
Oscillator related Sync Alarms
No file provided
|
Rakon Limited
|
Q13/15
|
2017-06-05 |
Results:2858 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):