Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 444 ]
|
Liaison statement to Working Party 1B (copy to Working Parties 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 5D
|
|
2014-02-25 |
|
[ 443 ]
|
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5A, 5B and 5C) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T)
|
WP 5D
|
|
2014-02-25 |
|
[ 442 ]
|
Liaison statement to Working Party 5A - WRC-15 agenda item 9.1, issue 9.1.7 - Resolution 647 (Rev. WRC-12) - Spectrum management guidelines for emergency and disaster relief radiocommunication
|
WP 1B
|
|
2014-02-06 |
|
[ 441 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station
|
WP 1B
|
|
2014-01-30 |
|
[ 440 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5D, 7B, 7C, 7D and CCV - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 1B
|
|
2014-01-30 |
|
[ 439 ]
(Rev.1) |
Liaison statement on ITU-T standardization efforts related to ISO TC22-TC204 JWG2 for VSG to [ISO TC22-TC204 JWG2 for VSG]
|
ITU-T SG 16
|
|
2014-01-28 |
|
[ 438 ]
|
Wireless billboard channels (WBC) - An example of wireless control channels
|
Director, BR
|
|
2014-01-24 |
|
[ 437 ]
|
Implementation examples of a CPC piggybacked on a broadcast digital platform
|
Director, BR
|
|
2014-01-24 |
|
[ 436 ]
|
Recommendation ITU-R SA.1626-1 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile service in the band 14.8-15.35 GHz
|
SG 7
|
|
2014-01-21 |
|
[ 435 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems
|
ITU-T SG 5
|
|
2014-01-21 |
|
[ 434 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
|
ITU-T SG 9
|
|
2014-01-07 |
|
[ 433 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems
|
ITU-T SG 9
|
|
2014-01-06 |
|
[ 432 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2013-12-20 |
|
[ 431 ]
|
Liaison statement to Working Party 7B - WRC-15 agenda item 9.1 (issue 9.1.8)
|
SC-WP
|
|
2013-12-20 |
|
[ 430 ]
|
Liaison statement to ITU-R Working Parties 1B and 6A (copy to ITU-R Working party 5A) - Definition and translation of the term "white space" and related terms
|
CCV
|
|
2013-12-19 |
|
[ 429 ]
|
Reply liaison statement to ITU-R Working Party 5A on PDR Recommendation ITU-R M.2003 and Report ITU-R M.2227 for Multi Gigabit Wireless systems (MGWS) in 60 GHz range
|
European Telecommunications Standards Institute
|
|
2013-11-13 |
|
[ 428 ]
|
Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D for information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ)
|
WP 5B
|
|
2013-12-05 |
|
[ 427 ]
|
Liaison statement to Working Parties 5A and 5B - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
|
WP 5C
|
|
2013-12-04 |
|
[ 426 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1
|
WP 5C
|
|
2013-12-04 |
|
[ 425 ]
|
Liaison statement to Study Group 6 (copy to Working Parties 4A, 4B, 4C, 5A, 5C, 5D and 6A) - Development of Question ITU-R 136-2/6 on Worldwide broadcasting roaming
|
WP 5B
|
136-2/6
|
2013-12-03 |
|
[ 424 ]
|
Liaison statement to Working Party 5A (copy for information to Working Party 5D) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5C
|
|
2013-12-03 |
|
[ 423 ]
|
Liaison statement to Working Parties 5A, 5D and ITU-T JCA-AHF - Working document towards a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
|
WP 5C
|
|
2013-12-03 |
|
[ 422 ]
|
Liaison statement to Working Party 1B (copied for information to Working Parties 5A & 5C, International Civil Aviation Organization, International Maritime Organization and World Meteorological Organization) - Development of a draft new Report ITU-R SM.[WHITE-SPACE] spectrum management principles and spectrum engineering techniques for the use of "White spaces" by radio systems...
|
WP 5B
|
|
2013-12-03 |
|
[ 421 ]
+Ann.1-21 |
Report on the twelfth meeting of Working Party 5A (Geneva, 18-28 November 2013)
|
Chairman, WP 5A
|
|
2013-11-28 |
|
[ 420 ]
|
Final List of Participants - Working Party 5A (Geneva, 18-28 November 2013)
|
Director, BR
|
|
2013-11-28 |
|
[ 419 ]
|
Report on relevant activities in certain countries in Region 2
|
Liaison Rapporteur
|
|
2013-11-28 |
|
[ 418 ]
|
WRC-15 agenda item 1.4
|
WP 5C
|
|
2013-11-27 |
|
[ 417 ]
|
Liaison statement to the International Special Committee on Radio Interference (copy to WPs 5A and 5C) - Protection of radiocommunication services in the frequency band 8.3-9 kHz
|
WP 5B
|
|
2013-11-26 |
|
[ 416 ]
|
Liaison statement to Working Party 5A - WRC-15 agenda item 1.17
|
WP 5B
|
|
2013-11-22 |
|
[ 415 ]
|
Liaison statement to Working Party 1A & ITU-T Study Group 15 (and for information to ITU-R Working Parties 5A, 5B & 5C) - Considerations on wired telecommunication systems being developed under G.Fast
|
WP 6A
|
|
2013-11-21 |
|
[ 414 ]
|
Liaison statement to Working Party 1A and ITU-T Study Groups 9 and 5 (and for information to ITU-R Working Parties 5A, 5B, 5C & 5D) - Coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU T J.195.1 (J.HINOC-REQ)
|
WP 6A
|
|
2013-11-21 |
|
[ 413 ]
|
Liaison statement to Working Party 5A (copy to Working Party 6A) - Electronic news gathering
|
Chairman, WP 5C
|
|
2013-11-20 |
|
[ 412 ]
|
Report on relevant activities in certain countries in Region 3
|
Liaison Rapporteur
|
|
2013-11-18 |
|
[ 411 ]
|
Report on relevant activities in certain countries in Region 1
|
Liaison Rapporteur
|
|
2013-11-18 |
|
[ 410 ]
(Rev.1) |
List of documents issued (Documents 5A/306 - 5A/410)
|
BR Study Groups Department
|
|
2013-11-15 |
|
[ 409 ]
|
Report on relevant activities in ITU-T SG 16 Focus Group of Audio Visual Accessibility (FG AVA) and Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
|
Liaison Rapporteur
|
|
2013-11-14 |
|
[ 408 ]
|
Report on disaster relief
|
Disaster Relief Liaison Rapporteur
|
|
2013-11-13 |
|
[ 407 ]
|
Suggestions for changes to the preliminary draft new Report ITU-R M.[LMS.CRS2] - [Cognitive radio systems [(CRS) applications] in the land mobile service]
|
Director, BR
|
241-2/5
|
2013-11-12 |
|
[ 406 ]
|
Comments regarding the working document towards a preliminary draft new Report ITU-R [LMS.CRS2] - [Coginitive radio systems [(CRS) applications] in the land mobile service]
|
Director, BR
|
|
2013-11-12 |
|
[ 405 ]
|
Proposed modifications to working document towards a preliminary draft new Recommendation ITU-R M.[V2X]
|
Korea (Republic of)
|
|
2013-11-11 |
|
[ 404 ]
|
Working document towards the preliminary draft CPM text for WRC-15 agenda item 1.3: PPDR
|
Israel (State of)
|
|
2013-11-10 |
|
[ 403 ]
|
Proposal for further updating of working document towards a preliminary draft new Report ITU-R M.[B-PPDR] "Broadband public protection and disaster relief communications"
|
Motorola Solutions Inc.
|
|
2013-11-11 |
|
[ 402 ]
|
Proposal for further work on PPDR reports in Working Party 5A
|
Motorola Solutions Inc.
|
|
2013-11-11 |
|
[ 401 ]
|
Proposal of some elements for the development of CPM text for WRC-15 agenda item 1.3
|
Motorola Solutions Inc.
|
|
2013-11-11 |
|
[ 400 ]
|
Revision of working document towards a preliminary draft new Report ITU-R M.[5 MHz COMPAT] - Elements of a compatibility study with aeronautical mobile (R) service in the 5 450-5 480 kHz frequency band
|
International Amateur Radio Union
|
|
2013-11-11 |
|
[ 399 ]
|
Proposal on working document towards preliminary draft new Report ITU-R M.[N+B-PPDR]
|
Germany (Federal Republic of)
|
|
2013-11-11 |
|
[ 398 ]
|
A proposed draft reply liaison statement to JTG 4-5-6-7 (copy to Working Party 5B for information) - Mitigation techniques for radio local area networks
|
Intel Corporation
|
|
2013-11-11 |
|
[ 397 ]
|
Text proposal for Sections 7, 8 and 9 of the preliminary draft new Report ITU-R M.[LMS.CRS2]
|
Nokia Solutions and Networks Oy
|
|
2013-11-11 |
|
[ 396 ]
|
Proposed modifications to the working document towards a preliminary draft revision of Recommendation ITU-R F.1336-3
|
Telefon AB - LM Ericsson
|
|
2013-11-11 |
|
[ 395 ]
|
Proposed modifications to the working document towards a preliminary draft new Report ITU-R [LMS.CRS2]
|
Orange
,
Telecom Italia S.p.A.
|
|
2013-11-11 |
Results:744 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):