International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2010-05-31 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2010-05-31) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:352 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 799 ]  
 
Interpolation of pre-processed metrics [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 798 ]  
 
Definition of clusterTDEV [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 797 ]  
 
Change definition of cluster selection [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 796 ]  
 
Definition of cluster selection (augmented) [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 795 ]  
 
Key performance indicators for cluster usage (e.g. FWPR) [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 794 ]  
 
G.827x High Level Requirements     IDT   Q13/15   2010-05-14
[ 793 ]  
 
Unicast Master Table     IDT   Q13/15   2010-05-14
[ 792 ]  
 
G.8265.1 editorial comments     IDT   Q13/15   2010-05-14
[ 791 ]  
 
G.8265.1 clause 6.2.1     IDT   Q13/15   2010-05-14
[ 790 ]  
 
Concern with bandwidth degrade notification for Y.1731     Canada   Q9/15, Q10/15   2010-05-14
[ 789 ]  
 
Concern with G.ptneq & E-OTN     Canada   Q9/15, Q12/15   2010-05-14
[ 788 ]  
 
Concern with ETREE proposal for G.ptneq & E-OTN     Canada   Q9/15, Q10/15   2010-05-14
[ 787 ]  
 
Document withdrawn (see TD 317/WP3)     N/A     2010-05-14
[ 786 ]  
 
Ethernet Proactive Frame Delay Measurement     Alcatel-Lucent Italy   Q9/15, Q14/15, Q10/15   2010-05-14
[ 785 ]  
 
Proposed ITU-T Rec. on remote management of CPE     Alcatel-Lucent , BT , Cable & Wireless Communications , France Telecom Orange , Nokia Siemens Networks , Swisscom , Technicolor , Telecom Italia   Q4/15, Q2/15, Q1/15   2010-05-14
[ 784 ]  
 
Request for revising ITU-T Rec. G.9960 Unified high-speed wire-line based home networking transceivers - Foundation     Federal Republic of Germany   Q4/15   2010-05-12
[ 783 ]  
 
Support for the approval of G.9961, G.9960 Corrigendum 1, and G.9972 Recommendations     Federal Republic of Germany   Q4/15   2010-05-12
[ 782 ]  
 
Proposed New Recommendation on remote management of CPE over broadband networks - CPE WAN Management Protocol (CWMP)     Alcatel-Lucent Bell NV   Q4/15, Q2/15, Q1/15   2010-05-12
[ 781 ]  
 
Proposed text for the revision of ITU-T Recommendation G.7712     Alcatel-Lucent   Q14/15   2010-05-11
[ 780 ]  
 
Test plan for PDV generation of a single equipment involved in IEEE1588-2008 transport     France Télécom , Cisco   Q13/15   2010-05-10
[ 779 ]  
 
Proposed Primary Reference Time Clock Performance for G.8271     Symmetricom, LSI   Q13/15   2010-05-10
[ 778 ]  
 
Proposed jitter specifications for O.174     JDSU   Q15/15   2010-05-11
[ 777 ]  
 
G.873.2 text proposal for Sections 7.1 and following     Alcatel Lucent Germany   Q9/15   2010-05-11
[ 776 ]  
 
G.873.2 text for wrapping versus steering comparison     Alcatel Lucent Germany   Q9/15   2010-05-10
[ 775 ]  
 
Support for the mixed unicast/multicast mode of operation in G.8265.1     Symmetricom   Q13/15   2010-05-10
[ 774 ]  
 
PDV histogram plot for G.8260 Appendix I     Symmetricom   Q13/15   2010-05-10
[ 773 ]  
 
Measurement configuration for PDV measurements     Symmetricom   Q13/15   2010-05-10
[ 772 ]  
 
Relationship of PDV metrics to PTP slave performance     Symmetricom   Q13/15   2010-05-10
[ 771 ]  
 
xTDEV/MAFE Definitions and Usage for G.8260 Appendix     Symmetricom , Nokia-Siemens   Q13/15   2010-05-10
[ 770 ]  
 
Definition of Time Error and PDV for packet timing signals     Symmetricom   Q13/15   2010-05-10
[ 769 ]  
 
Definition of Packet Delay Variation (PDV) for timing applications     Symmetricom   Q13/15   2010-05-10
[ 768 ]  
 
Definition of "Packet Based Method" in G.8260     Symmetricom   Q13/15   2010-05-10
[ 767 ]  
 
The need for multiple protocol instances in PTP slaves     Symmetricom   Q13/15   2010-05-10
[ 766 ]  
 
Comments by John Eidson on the PTP Telecom Profile for Frequency Distribution     Symmetricom   Q13/15   2010-05-10
[ 765 ]  
 
Editorial changes to clause 6 of G.8265.1     Symmetricom   Q13/15   2010-05-10
[ 764 ]  
 
Removal of definitions in G.8265, G.8265.1 and G.8263     Symmetricom   Q13/15   2010-05-10
[ 763 ]  
 
Definition of the concept of "floor" as applied to packet transit delay studies     Symmetricom   Q13/15   2010-05-10
[ 762 ]  
 
Q11 Living List SP1 Clarification     Alcatel-Lucent   Q11/15   2010-04-29
[ 761 ]  
 
OTUk-AIS used for OTN alarm suppression     Ericsson   Q9/15, Q12/15, Q11/15   2010-04-29
[ 760 ]  
 
STM-n/OC-n Clear Channel Protection     Ericsson   Q9/15   2010-04-29
[ 759 ]  
 
Measurement Configuration for Time Error Measurements     Symmetricom , LSI   Q13/15   2010-04-28
[ 758 ]  
 
Definition of a Primary Reference Time Clock in G.8260     Symmetricom , LSI   Q13/15   2010-04-28
[ 757 ]  
 
Hierarchal PBB / PBB-TE for E-OTN     Ciena Corporation   Q9/15   2010-04-28
[ 756 ]  
 
E-OTN T-Tag Concerns     Ciena Corporation   Q9/15   2010-04-28
[ 755 ]  
 
E-OTN Requirements Outline     Ciena Corporation   Q9/15   2010-04-28
[ 754 ]  
 
Transitional Links and Resource allocation     Ciena Corporation   Q12/15   2010-04-28
[ 753 ]  
 
Need For An E-OTN Requirements Document     Ciena Corporation   Q9/15   2010-04-28
[ 752 ]  
 
G.7713 - Correction to Signalling Sequence     Ciena Corporation   Q14/15   2010-04-28
[ 751 ]  
 
Proposed modification of the GMP description text and the GbE into ODU0 mapping description text for inclusion in G.709v3 Amendment 1     PMC-Sierra   Q11/15   2010-04-28
[ 750 ]  
 
Considerations for carrying SyncE over Gigabit/s Ethernet over ODU0     PMC-Sierra   Q9/15, Q13/15, Q11/15   2010-04-28
Results:352 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-11-19