Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 970 ]
|
Timing Transparency over OTN
|
Alcatel-Lucent Germany
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 969 ]
|
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 967 ]
|
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 966 ]
|
Proposed jitter tolerance specifications for G.8262
|
JDSU
|
Q13/15
|
2010-05-19 |
|
[ 965 ]
|
Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 963 ]
|
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 959 ]
|
Time and Phase Sync Interfaces (G.8271)
|
Ericsson
|
Q13/15
|
2010-05-19 |
|
[ 949 ]
|
Mapping method to support timing over OTN
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 948 ]
|
Implementation analysis of timing over OTN
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 939 ]
|
Time Synchronization Telecom Profiles
|
Ericsson
|
Q13/15
|
2010-05-19 |
|
[ 905 ]
|
Telecom Slave - State Machine Operations
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 904 ]
|
G.827x Recommendations - High-Level Objectives
|
Huawei
,
CATR
,
MII
|
Q13/15
|
2010-05-18 |
|
[ 903 ]
|
Pulse-Per-Second Interface
|
Huawei
,
CATR
,
China Mobile Communications Corporation
,
MII
|
Q13/15
|
2010-05-18 |
|
[ 902 ]
|
PTP Profile Data Set Members
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 901 ]
|
G.8264 ESMC Processing for G.8011.x Ethernet Services Types
|
Huawei
|
Q13/15, Q10/15
|
2010-05-18 |
|
[ 900 ]
|
Comments and Editorial Remarks for G.8265.1
|
Huawei
|
Q13/15, Q10/15
|
2010-05-18 |
|
[ 899 ]
|
Updated Telecom Slave Model
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 898 ]
|
Flag Fields
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 897 ]
|
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 896 ]
|
The use of SyncE and IEEE1588v2 for Time Distribution
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 895 ]
|
ESMC Transport over GPON
|
Huawei
,
BT
|
Q2/15, Q13/15
|
2010-05-18 |
|
[ 894 ]
|
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 893 ]
|
Usage of PTP domain number for the time-profile
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 876 ]
|
Issues with the Transparent Clock concept of PTPv2 in a telecom environment
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 875 ]
|
Architecture for phase and time distribution
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 873 ]
|
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics
|
France Télécomq
|
Q13/15
|
2010-05-18 |
|
[ 872 ]
|
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting
|
France Télécom
,
Tellabs
|
Q13/15
|
2010-05-18 |
|
[ 871 ]
|
G.8260: definition of floor delay, delay steps, and comments on Appendix I
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 870 ]
|
G.8260: list of requirements for PDV metrics
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 865 ]
|
G.8260: methodology to perform a PDV measurement
|
France Télécom, Ericsson
|
Q13/15
|
2010-05-18 |
|
[ 862 ]
(Rev.1) |
The removal of Floor Delay steps in Network PDV metrics
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 861 ]
|
Development of a Wander requirement for 1588v2 Boundary Clocks
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 847 ]
|
Noise transfer on the same SyncE copper port
|
Cisco
|
Q13/15
|
2010-05-17 |
|
[ 844 ]
|
G.8262 V.2 minor comments
|
Deutsche Telekom
|
Q13/15
|
2010-05-17 |
|
[ 842 ]
|
Time and Phase Sync noise budget in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 841 ]
|
Details on Time Sync Methods in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 840 ]
|
Time and Phase Sync Requirements Updates in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 839 ]
|
G.8261.1 scope proposal
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 838 ]
|
Discussion on CPRI over OTN Sync Requirements
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 811 ]
|
Distributed Boundary and Transparent Clocks
|
ADTRAN
,
Calix
,
Symmetricom
|
Q4/15, Q2/15, Q13/15
|
2010-05-16 |
|
[ 809 ]
|
Support of SSM for Synchronous Ethernet in OMCI
|
ADTRAN
|
Q2/15, Q13/15
|
2010-05-16 |
|
[ 804 ]
|
SyncE Jitter tolerance values
|
Deutsche Telekom
|
Q13/15
|
2010-05-14 |
|
[ 803 ]
|
Examples of using cluster selection & metrics [G.8260, G.8261.1, G.8263]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 802 ]
|
Liaison to IEEE 802.1 about TC & 802.1Q violation [G.8275.1]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 801 ]
|
Possible 'basestation' masks [G.8261.1]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 800 ]
|
Comparison of MTIE in time and frequency domain [G.8260, G.8261.1, G.8263]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 799 ]
|
Interpolation of pre-processed metrics [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 798 ]
|
Definition of clusterTDEV [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 797 ]
|
Change definition of cluster selection [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
|
[ 796 ]
|
Definition of cluster selection (augmented) [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2010-05-14 |
Results:487 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):