Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 98 ]
|
Proposed Input about Network Slicing to draft G.7702
|
ZTE Corporation (China)
|
Q12/15
|
2017-06-05 |
|
[ 97 ]
|
Proposal for a new G.984.5 Amd to study integrated WDM1r method and other coexistence items
|
China Telecommunications Corporation
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2017-06-05 |
|
[ 96 ]
|
Proposed functional model for interconnected rings in the draft G.8132/Y.1383
|
Ministry of Science, ICT and Future Planning (MSIP)
|
Q9/15
|
2017-06-05 |
|
[ 95 ]
|
G.8275.2 BMCA Cycling avoidance method
|
Cisco Systems, Inc. (United States)
|
Q13/15
|
2017-06-04 |
|
[ 94 ]
+Corr.1 |
Proposal of methods and parameters of oscillator monitoring (G.Suppl. Sync OAM)
|
Microsemi Corporation (United States)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q13/15
|
2017-06-04 |
|
[ 93 ]
|
Classification of synchronization network operation for failure cases (G.Suppl.Sync OAM)
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q13/15
|
2017-06-04 |
|
[ 92 ]
|
Proposal of description of PTP path monitoring in G.Suppl.Sync OAM
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q13/15
|
2017-06-04 |
|
[ 91 ]
|
G.8275.2 & G.8271.2 - Phase delivery over PTP unaware network
|
ADVA Optical Networking (United Kingdom)
|
Q13/15
|
2017-06-04 |
|
[ 90 ]
|
Clarification on WD06-06 of the Q6 Sunnyvale Interim meeting Jan. 16-19, 2017
|
Coriant GmbH & Co. KG (Germany)
,
Deutsche Telekom AG (Germany)
,
Keysight Technologies Deutschland GmbH
,
Nokia
|
Q6/15
|
2017-06-04 |
|
[ 89 ]
|
Twisted pair distribution cable measurements up to 110 MHz
|
Proximus PLC
|
Q4/15
|
2017-06-04 |
|
[ 88 ]
|
G.8275.2 Deployment in Full PTP aware network
|
Cisco Systems, Inc. (United States)
|
Q13/15
|
2017-06-04 |
|
[ 87 ]
|
Asymmetric latency measurement
|
IP Light
|
Q13/15, Q11/15
|
2017-06-04 |
|
[ 86 ]
|
ODUk new delay measurement method
|
IP Light
|
Q13/15, Q11/15
|
2017-06-04 |
|
[ 85 ]
|
G.811.1 ePRC Test Results
|
ADVA Optical Networking (United Kingdom)
|
Q13/15
|
2017-06-04 |
|
[ 84 ]
|
Draft new Recommendation: Generic architecture of home networks for energy management
|
Fujitsu Limited (Japan)
,
Japan Advanced Institute of Science and Technology
,
Kanazawa Institute of Technology
,
Mitsubishi Electric Corporation
,
Oki Electric Industry Company Ltd. (OKI)
,
Panasonic Corporation
|
Q15/15
|
2017-06-04 |
|
[ 83 ]
|
OSC requirement proposal
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 82 ]
|
Text proposal for ETY and FlexE layer atomic functions
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15, Q10/15
|
2017-06-03 |
|
[ 81 ]
|
OTN network slicing considerations
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 80 ]
(Rev.1) |
Application specific FlexO-LR port on router or other packet switch
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 79 ]
|
Considerations on timing transparency in application specific transport networks
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 78 ]
|
Hybrid tributary slot granularity in application specific OTN solutions
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 77 ]
|
MFI interface considerations
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 76 ]
(Rev.1) |
Proposed text for 200G and 400G FlexO-SR in G.709.1
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 75 ]
|
Restructuring G.709.1 clauses
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 74 ]
|
Proposed text for new Annex I and J of G.709
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 73 ]
|
OTUCn-M functional model and replacement signals
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 72 ]
|
G.7044 revision comments
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 71 ]
|
Proposed update of Appendix I/G.781
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15, Q11/15
|
2017-06-03 |
|
[ 70 ]
|
Support of OTSiA OH in existing OTN networks
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 69 ]
|
Optical layer independent OTU adaptation functions in G.798
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2017-06-03 |
|
[ 68 ]
|
OCh and OTSiA OH associated with FlexO-LR
|
Huawei Technologies Co., Ltd. (China)
|
Q6/15, Q14/15, Q11/15
|
2017-06-03 |
|
[ 67 ]
|
Consideration on FEC scheme for 200G/400G FlexO-LR
|
Inphi Corporation
|
Q11/15
|
2017-06-03 |
|
[ 66 ]
|
n×25G FlexO-FR frame format, overhead and multiplexing structure
|
FiberHome Technologies Group (China)
|
Q11/15
|
2017-06-02 |
|
[ 65 ]
(Rev.1) |
n×25G FlexO bit rate, FEC and client mapping options for next generation Mobile Fronthaul Transport
|
FiberHome Technologies Group (China)
|
Q11/15
|
2017-06-02 |
|
[ 64 ]
|
Lite and Flexible OTN for next generation (5G) Mobile Fronthaul Transport
|
China Telecommunications Corporation
,
FiberHome Technologies Group (China)
|
Q11/15
|
2017-06-02 |
|
[ 63 ]
|
FOICk.n framer module interfaces (MFI) in G.Sup58 Ed.2 revision
|
FiberHome Technologies Group (China)
|
Q11/15
|
2017-06-02 |
|
[ 62 ]
|
Updating G.808.2 to better distinguish between circuit and packet applications
|
Coriant GmbH & Co. KG (Germany)
|
Q9/15
|
2017-06-02 |
|
[ 61 ]
|
RE CT and ONU association detection in G.9807.2
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2017-06-02 |
|
[ 60 ]
|
G.sup.HSP requirement discussion
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2017-06-02 |
|
[ 59 ]
|
G.RoF physical layer and system requirements
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2017-06-02 |
|
[ 58 ]
|
Link aggregation bonded ONU management in G.988
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2017-06-02 |
|
[ 57 ]
|
Suggested location of information related to LDV for attenuation
|
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2017-06-02 |
|
[ 56 ]
|
Explicit and Simple Formulae for Constellation Impairment Parameters that Minimize the EVM
|
Tektronix, Inc.
|
Q6/15
|
2017-06-02 |
|
[ 55 ]
|
G.8273.2: Noise transfer: allowance for noise generation
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-02 |
|
[ 54 ]
|
Document withdrawn
|
N/A
|
|
2017-06-02 |
|
[ 53 ]
|
Discovery option - LLDP/MAC
|
Ciena Canada
|
Q14/15
|
2017-06-02 |
|
[ 52 ]
|
Recommendation Relationships
|
Ciena Canada
|
Q14/15, Q12/15
|
2017-06-02 |
|
[ 51 ]
(Rev.1) |
G.7702 - Controller interactions
|
Ciena Canada
|
Q14/15, Q12/15
|
2017-06-02 |
|
[ 50 ]
|
G.7702 - Management
|
Ciena Canada
|
Q14/15, Q12/15
|
2017-06-02 |
|
[ 49 ]
|
G.7702 - resource views and forwarding configuration
|
Ciena Canada
|
Q14/15, Q12/15
|
2017-06-02 |
Results:398 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):