Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 309 ]
|
Draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22.0 GHz in Regions 1 and 3
|
Korea (Republic of)
|
|
2010-03-05 |
|
[ 308 ]
|
WRC Agenda item 8.1.3
|
Nigeria (Federal Republic of)
|
|
2010-03-04 |
|
[ 307 ]
|
Comments on the proposed treatment of recommendations of former Working Party 6S
|
BR Study Group Department
|
|
2010-03-03 |
|
[ 306 ]
|
Proposed draft response liaison statement to Working Party 7B - Parameters for use in conducting compatibility assessment of SRS (E-s) into HIBLEO-2 ISS in the band 22.55-23.15 GHz
|
Australia
|
|
2010-03-02 |
|
[ 305 ]
|
Emergency and disaster relief telecommunications in Haiti
|
United States of America
|
|
2010-03-01 |
|
[ 304 ]
|
ABU views on WRC-12 Agenda items 1.5 and 1.13
|
Asia-Pacific Broadcasting Union (ABU)
|
|
2010-02-26 |
|
[ 303 ]
|
ITU/IDA Workshop on the efficient use of the spectrum/orbit resource (Singapore, 16-17 June 2010)
|
Director, BR
|
|
2010-03-01 |
|
[ 302 ]
|
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2
|
WP 1B
|
|
2010-02-17 |
|
[ 301 ]
|
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C
|
WP 1A
|
|
2010-02-12 |
|
[ 300 ]
+Corr.1 |
Additional information for the preparation of the draft CPM Report to WRC-12
|
Chairman, CPM-11
|
|
2010-01-22 |
|
[ 299 ]
|
Liaison statement - Characteristics for gateway links for high altitude platform stations (HAPS) in frequency bands 5 850-7 075 MHz for use in sharing studies (WRC-12 Agenda item 1.20)
|
WP 5C
|
|
2009-12-17 |
|
[ 298 ]
|
Liaison statement - Review of certain SF-series Recommendations
|
WP 5C
|
|
2009-12-17 |
|
[ 297 ]
|
Liaison statement on WRC-12 Agenda item 7
|
SC-WP
|
|
2009-12-16 |
|
[ 296 ]
|
Reply liaison statement to ITU-R Working Party 4A - Performance requirements for unmanned aircraft systems
|
WP 5B
|
|
2009-12-14 |
|
[ 295 ]
|
Liaison statement to Working Party 1A (copy to Working Party 4A) - WRC-12 Agenda item 1.22
|
WP 6A
|
|
2009-12-08 |
|
[ 294 ]
|
Liaison statement to Working Party 4A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band
|
WP 5A
|
|
2009-12-08 |
|
[ 293 ]
|
Liaison statement - Future revision of Recommendation ITU-R SF.675-2
|
WP 5C
|
|
2009-12-08 |
|
[ 292 ]
|
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to WP 5A for information)
|
WP 5C
|
|
2009-12-08 |
|
[ 291 ]
|
Liaison statement to Working Party 4A (copy to Working Party 7B) - Considerations on protection criteria for NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
|
WP 5C
|
|
2009-12-08 |
|
[ 290 ]
|
Liaison statement to Working Party 4A - Requirements for broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3 under WRC-12 Agenda item 1.13
|
WP 6B
|
|
2009-12-08 |
|
[ 289 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5C
|
|
2009-12-04 |
|
[ 288 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 6B
|
|
2009-11-20 |
|
[ 287 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems.
|
WP 6A
|
|
2009-11-20 |
|
[ 286 ]
|
Note from the Chairman of Working Party 5D to the Chairman of Study Group 4 (copy to the Chairman of Working Party 4A and the Chairman of Study Group 5) - Comments on draft new Recommendation ITU-R S.[IMT-PFD]
|
WP 5D
|
|
2009-11-09 |
|
[ 285 ]
|
Liaison statement to Working Party 3M (copy for information to Working Party 4A) - Development of a Handbook on propagation information for the prediction of interference and coordination distance
|
WP 5D
|
|
2009-11-06 |
|
[ 284 ]
|
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19
|
WP 1B
|
|
2009-10-12 |
|
[ 283 ]
|
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C - WRC-12 Agenda item 1.22
|
WP 1A
|
|
2009-10-09 |
|
[ 282 ]
|
ABU views on WRC-12 Agenda items 1.4, 1.13, 1.19, 1.22, 1.25
|
Asia-Pacific Broadcasting Union (ABU)
|
|
2009-09-29 |
|
[ 281 ]
|
Liaison statement to Working Party 4A - Protection of HIBLEO-2 inter-satellite service (ISS) links in the band 23.15 to 23.55 GHz from unwanted emissions from space research service (SRS) Earth-to-space transmissions below 23.15 GHz
|
WP 7B
|
|
2009-09-29 |
|
[ 280 ]
|
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12
|
WP 7B
|
|
2009-09-29 |
|
[ 279 ]
|
Liaison statement to Working Party 4A (copy to Working Party 5C for information) - Request for advice on parameters needed for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
|
WP 7B
|
|
2009-09-28 |
|
[ 278 ]
+Ann.1-19 |
Report on the meeting of Working Party 4A (Geneva, 9 - 18 September 2009)
|
Chairman, WP 4A
|
|
2009-09-18 |
|
[ 277 ]
(Rev.1) |
Final List of Participants - Geneva, 9-18 September 2009
|
Director, BR
|
|
2009-09-18 |
|
[ 276 ]
|
Draft list of terminology on emergency telecommunications
|
WP 4B
|
|
2009-09-11 |
|
[ 275 ]
|
Liaison statement to Working Party 4A - Radio astronomy issues related to WRC-12 Agenda item 1.13
|
WP 7D
|
|
2009-09-11 |
|
[ 274 ]
|
Liaison statement to Working Parties 4A and 4B - Draft new Recommendation ITU-R M.[MOBDIS] and draft new Report ITU-R M.[REP-MOBDIS] - Use of mobile-satellite service (MSS) in disater reponse and relief
|
WP 4C
|
|
2009-09-09 |
|
[ 273 ]
|
Liaison statement to Working Party 4A - Information for studies related to WRC-12 Agenda item 1.25
|
WP 4C
|
|
2009-09-09 |
|
[ 272 ]
|
List of documents issued
|
BR Study Group Department
|
|
2009-09-08 |
|
[ 271 ]
|
Working document towards draft CPM text for WRC-12 Agenda item 7 - Methods to satisfy Agenda item 7 to address coordination, notification and recording of complementary ground components of integrated MSS systems ("Integrated MSS systems) operating in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz
|
United States of America
|
|
2009-09-02 |
|
[ 270 ]
|
Working document toward a preliminary draft new Recommendation - An analytical methodology to evaluate interference into NGSO-TO-NGSO ISS in the range 20-30 GHz from the emissions of SRS earth stations
|
Access Partnership Limited
|
|
2009-09-02 |
|
[ 269 ]
|
Feederlink bands for the 21.4-22 GHz BSS band in Regions 1 and 3 (WRC-12 Agenda item 1.13)
|
Telenor ASA
|
|
2009-09-02 |
|
[ 268 ]
|
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13
|
Telenor ASA
|
|
2009-09-02 |
|
[ 267 ]
|
Proposal for a draft revision of Annex 21 to Working Party 4A Chairman's Report - Working document towards draft CPM text on WRC-12 Agenda item 1.13
|
Sweden
|
|
2009-09-02 |
|
[ 266 ]
|
Evolution of Recommendation ITU-R SF.675-3 - Calculation of the maximum power density (averaged over 4 kHz) of an angle-modulated carrier
|
France
|
|
2009-09-02 |
|
[ 265 ]
|
Protection of geostationary FSS satellite receivers in the band 5 850-7 075 MHz (WRC-12 Agenda item 1.20)
|
France
|
|
2009-09-02 |
|
[ 264 ]
|
Working document - Coordination arc between geostationary-satellite orbit broadcasting-satellite service networks in the frequency band 21.4 - 22 GHz (WRC-12 Agenda item 1.13)
|
France
|
|
2009-09-02 |
|
[ 263 ]
|
Haps gateway links in the 5 850-7 075 MHz band (WRC-12 Agenda item 1.20)
|
Asia Satellite Telecommunications Co. Ltd.
|
|
2009-09-02 |
|
[ 262 ]
|
Harmonization of electronic news gathering in the satellite frequency bands (WRC-12 Agenda item 1.5)
|
Asia Satellite Telecommunications Co. Ltd.
|
|
2009-09-02 |
|
[ 261 ]
|
Draft liaison statement to Working Party 5A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band
|
SES NEW SKIES
|
|
2009-09-02 |
|
[ 260 ]
|
Spectrum use and spacecraft design complexity due to imbalance in the existing FSS spectrum allocations in ITU Region 2 and Region 3 in the 10-15 GHz band
|
SES NEW SKIES
|
|
2009-09-02 |
Resultados :609 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):