Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
1.7
1.9.2
140/6
210/1
210-3/1
226/5
AI1.1
AI1.10
AI1.13
AI1.14
AI1.16
AI1.3
AI1.5
AI1.6
AI1.7
AI1.8
AI1.9
AI1.9.1
AI1.9.2
AI1.9.4
AI2.2
AI9.1
AI9.1.2
AI9.1.4
AI9.4
Q210/1
Q210-3/1
Q226/5
Q235/5
Q259
Q259/5
Q32/6
Borrar filtro
Fecha
[ 431 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS
WP 4B
2018-02-23
[ 430 ]
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS
WP 4A
2018-02-20
[ 429 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems
WP 4C
2018-02-20
[ 428 ]
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
WP 4C
2018-02-19
[ 427 ]
Liaison statement to Working Party 5B - In band and adjacent band coexistence and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz
WP 5D
2018-02-13
[ 426 ]
Liaison statement to Working Party 5B - Work progress on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz
WP 5D
2018-02-13
[ 425 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
WP 1A
2017-12-12
[ 424 ]
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
WP 1A
2017-12-12
[ 423 ]
Liaison statement to Working Parties 1C, 3L and 5B (copy to Working Parties 5A and 5C) - HF radio noise measurements at sea
WP 1A
2017-12-12
[ 422 ]
Liaison statement to ICAO (copy for information to Working Parties 1C and 5B) - Development in CISPR/F subcommittee concerning interference from LED Lighting
WP 1A
2017-12-12
[ 421 ]
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans
WP 1A
2017-12-12
[ 420 ]
Liaison statement on revision of Recommendation ITU-T E.217
ITU-T SG2
2017-12-11
[ 419 ]
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
ITU-T SG 5
2017-11-23
[ 418 ]
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies
WP 5A
AI1.1
2017-11-22
[ 417 ]
Liaison statement to Working Parties 7C and 7D (copied to Working Party 5B for information) - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services
WP 5A
2017-11-22
[ 416 ]
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14
WP 5C
AI1.14
2017-11-22
[ 415 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
WP 5C
2017-11-22
[ 414 ]
Reply liaison statement to Working Party 7C (copied to Working Parties 5B and 5C for information) - Technical and operational characteristics for the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)
WP 5A
AI2.2
2017-11-21
[ 413 ]
Reply liaison statement to Working Party 7C (copies to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)
WP 5C
AI2.2
2017-11-21
[ 412 ]
Reply liaison statement to Working Party 1A (copied to Working Parties 5B, 5C and 5D for information) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services
WP 5A
2017-11-17
[ 411 ]
+Ann.1-34
Report on the meeting of Working Party 5B (Geneva, 6-17 November 2017)
Chairman, WP 5B
2017-11-17
[ 410 ]
Final list of participants - Working Party 5B (Geneva, 6-17 November 2017)
Director, BR
2017-11-17
[ 409 ]
Liaison statement to Working Party 5B on the protection of fixed service systems under WRC-19 agenda item 1.9.2
WP 5C
AI1.9.2
2017-11-15
[ 408 ]
Reply liaison statement to Working Party 5B - Studies for the implementation of Resolution 155 (WRC-15)
WP 5A
2017-11-13
[ 407 ]
Liaison statement to Working Party 5B (copied to Working Party 5C for information) - Interference criteria of conventional and trunked land mobile systems to be used in sharing studies for WRC-19 agenda item 1.9.2
WP 5A
AI1.9
2017-11-13
[ 406 ]
List of documents issued (Documents 5B/305 - 5B/406)
BR Study Groups Department
2017-11-02
[ 405 ]
Liaison statement to Working Parties 5A and 5B - Progress of sharing studies between a 45 MHz spaceborne radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)
WP 7C
2017-11-01
[ 404 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
WP 4A
2017-11-01
[ 403 ]
Reply liaison statement to Task Group 5/1 (copy to Working Parties 4C, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020
WP 4A
2017-11-01
[ 402 ]
Liaison statement to Working Party 5B - Draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8 GHz]
WP 4A
2017-11-01
[ 401 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems»
WP 7A
2017-11-01
[ 400 ]
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7D for information) - Studies on "Wireless Power Transmission (WPT)"
WP 7A
Q210/1
2017-11-01
[ 399 ]
Liaison statement to Working Parties 5A, 5B and 5C (Copy to Working Party 5D) regarding WRC-19 agenda item 1.3
WP 7B
AI1.3
2017-11-01
[ 398 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
WP 7B
AI1.7
2017-11-01
[ 397 ]
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
WP 7B
2017-11-03
[ 396 ]
Reply liaison statement to Working Party 5B - Potential In-band Interference from Foreign Object Debris (FOD) Detection Systems in the Radiolocation Service into EESS (active) systems in the 94.0-94.1 GHz frequency band
WP 7C
2017-11-01
[ 395 ]
Liaison note to ITU-R Working Party 5B on autonomous maritime radio devices
International Association of Marine Aids to Navigation and Lighthouse Authorities
2017-10-30
[ 394 ]
Working document towards draft CPM text on WRC-19 agenda item 1.8
Canada
AI1.8
2017-10-30
[ 393 ]
Working document towards a preliminary draft new Report ITU-R M.[SUBORBITAL VEHICLES] - Radiocommunications for suborbital vehicles
United Kingdom of Great Britain and Northern Ireland
2017-10-30
[ 392 ]
Working document towards draft CPM Text on WRC-19 agenda item 1.8
Globalstar, Inc.
AI1.8
2017-10-30
[ 391 ]
Proposed upgrade of preliminary draft revision of Recommendation ITU-R M.1849-1 -Technical and operational aspects of ground-based meteorological radars
Japan
2017-10-30
[ 390 ]
Proposed modification to working document toward a preliminary draft CPM text for WRC-19 agenda item 1.9.2
Japan
AI1.9.2
2017-10-30
[ 389 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[FOD 92-100 GHZ] - Technical and operational characteristics of the foreign object debris
detection system operating in the frequency band 92-100 GHz
Japan
2017-10-30
[ 388 ]
Proposed modification to working document towards a preliminary draft new [RECOMMENDATION] [REPORT] ITU-R M.[UAS CNPC_CHAR] - Characteristics of Unmanned Aircraft System Control and Non-Payload Earth Stations for use with Space Stations operating in the Fixed Satellite Service
Japan
2017-10-30
[ 387 ]
Proposed updates to working document towards a preliminary draft new Report ITU-R M.[SUB-ORBITAL VEHICLES] - Radiocommunications for suborbital vehicles
China (People's Republic of)
Q259/5 , AI9.1.4
2017-10-30
[ 386 ]
Working document towards draft CPM text on WRC-19 agenda item 1.9.1
China (People's Republic of)
AI1.9.1
2017-10-30
[ 385 ]
Working document towards draft CPM text on WRC-19 agenda item 1.8
China (People's Republic of)
AI1.8
2017-10-30
[ 384 ]
Working document towards a preliminary draft revision of Recommendation ITU-R M.585-7 - Assignment and use of identities in the maritime mobile service
China (People's Republic of)
AI1.9.1
2017-10-30
[ 383 ]
Prediction and field test of NAVDAT ranges
China (People's Republic of)
2017-10-30
[ 382 ]
Consideration on the revision of Recommendation ITU-R M.2092
China (People's Republic of)
2017-10-30
Resultados :731 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):