Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2009-09-28 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2009-09-28) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2009-09-28 al 2009-10-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Resultados :399 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 447 ]  
 
Proposed texts for clause 11.2.1 of G.8031     Mitsubishi Electric Corporation   Q9/15   2009-09-16
[ 446 ]  
 
Document withdrawn     N/A (no se aplica)     2009-09-16
[ 445 ]  
 
Management of high capacity connections in the OTN     Huawei Technologies   Q12/15   2009-09-16
[ 444 ]  
 
Document withdrawn     N/A (no se aplica)   Q14/15   2009-09-16
[ 443 ]  
 
Text proposal to align clause 9/G.872 with draft revised G.709     Huawei Technologies   Q12/15   2009-09-16
[ 442 ]  
 
Document withdrawn     N/A (no se aplica)     2009-09-16
[ 441 ]  
 
GPON over OTN mapping     Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra   Q2/15, Q11/15   2009-09-16
[ 440 ]  
 
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access     Huawei Technologies   Q9/15   2009-09-16
[ 439 ]  
 
Text proposal for clause 8/G.798.1     Huawei Technologies   Q9/15   2009-09-16
[ 438 ]  
 
Proposal to specify OCh/OTUkV_A with OTUk_CP     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 437 ]  
 
Multi-vendor demarcation in the OTN     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 436 ]  
 
LO and HO ODU view points and NNIs     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 435 ]  
 
Document withdrawn  
See C533
 
N/A (no se aplica)     2009-09-16
[ 434 ]  
 
First models of OTN equipment proposal     Huawei Technologies   Q9/15   2009-09-16
[ 433 ]  
 
Multi-lane STM-256     AT&T   Q11/15   2009-09-16
[ 432 ]  
 
Optical Monitoring     AT&T   Q7/15, Q6/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 430 ]  
 
G.709 OTN domains     AT&T   Q11/15   2009-09-16
[ 429 ]  
 
G.8032 (Comments on Draft)     Nortel Networks (Canada)   Q9/15   2009-09-16
[ 428 ]  
 
Additional requirements for G.7718     Alcatel-Lucent , NTT   Q14/15   2009-09-16
[ 427 ]  
 
G.8032 (Access Protection)     Nortel Networks (Canada)   Q9/15   2009-09-16
[ 426 ]  
 
Eye Mask for 10G G.695     Nortel Networks (Canada)   Q6/15   2009-09-16
[ 425 ]  
 
Support for the approval of G.9960 and consent of G.hn Recommendations     Portugal Telecom   Q4/15   2009-09-15
[ 424 ]  
 
Proposal of fibre macrobending identification method     SoftBank Telecom   Q5/15   2009-09-15
[ 423 ]  
 
Considerations of Y.1731 Performance Monitoring     NEC Corporation   Q10/15   2009-09-15
[ 422 ]  
 
Configuration principle of interconnected rings in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 421 ]  
 
Considerations of guard timer in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 420 ]  
 
Considerations of FS state in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 419 ]  
 
Considerations of initial state in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 418 ]  
 
Proposed text for equal priority requests in G.8031     NEC Corporation   Q9/15   2009-09-15
[ 417 ]  
 
Proposed modification for loss measurement process in G.8021     NEC Corporation   Q9/15   2009-09-15
[ 416 ]  
 
Draft new Recommendation L.limt "Low impact mini-trench installation technique"     Sirti SpA   Q16/15   2009-09-15
[ 415 ]  
 
Considerations about physical layer configurations for WSON     Ericsson   Q6/15   2009-09-15
[ 414 ]  
 
Proposal of architecture of G.omci     NTT   Q2/15   2009-09-15
[ 413 ]  
 
Proposal of home network remote management requirements on G.hntreq     NTT   Q1/15   2009-09-15
[ 412 ]  
(Rev.1) 
Latency Measurements in the Optical Transport Network Using G.709 Overhead     Verizon , AT&T , BT , Nokia Siemens Networks   Q9/15, Q11/15   2009-09-15
[ 411 ]  
 
Sublayers and WSON in G.872     Ciena Corp   Q12/15   2009-09-15
[ 410 ]  
 
An updated Topology model for WSON     Ciena Corp   Q12/15   2009-09-15
[ 409 ]  
 
Some thoughts on Transport Entities     Ciena Corp   Q12/15   2009-09-15
[ 408 ]  
 
Characteristic Information, Sublayers and Media     Ciena Corp   Q12/15   2009-09-15
[ 407 ]  
 
Mapping of 100GBASE-R into OPU4     Alcatel-Lucent   Q11/15   2009-09-15
[ 406 ]  
 
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4     Alcatel-Lucent   Q9/15, Q11/15   2009-09-15
[ 405 ]  
 
Adaptation of STM-256 over multichannel parallel interfaces     Alcatel-Lucent , Cisco , Finisar , Juniper   Q9/15, Q11/15   2009-09-15
[ 404 ]  
 
Propose to add Link discover Process based on OAM in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 403 ]  
 
Propose to add requirement of MAC topology management     ZTE Corporation   Q14/15   2009-09-15
[ 402 ]  
 
Propose to add MAC Link discover support in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 400 ]  
 
Propose to add requirement of discovery support on MPLS-TP NM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 399 ]  
 
CSF Indication for Y.1731 (Ethernet OAM)     Alcatel-Lucent   Q9/15, Q10/15   2009-09-15
[ 398 ]  
 
Correct power budget modelling of indoor access installations     Draka Communications   Q5/15, Q16/15   2009-09-15
Resultados :399 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-11-19