Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2090 ]
|
G.hn: Clarification on FACK
|
Marvell Semiconductor Inc.
|
Q4B/15
|
2012-08-25 |
|
[ 2089 ]
|
G.hn: Proposal for Extended ACK implementation
|
Marvell Semiconductor Inc.
|
Q4B/15
|
2012-08-25 |
|
[ 2088 ]
|
G.fast: Proposed Definitions for G.fast PMD
|
Ikanos Communications
|
Q4A/15
|
2012-08-25 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
|
[ 2086 ]
|
Proposed clarification for the CSF start time in G.7041
|
PMC-Sierra, Inc.
|
Q11/15
|
2012-08-25 |
|
[ 2085 ]
|
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces
|
PMC-Sierra, Inc.
|
Q11/15
|
2012-08-25 |
|
[ 2084 ]
|
Testing Packet Clocks (re. G.8263) - Part 2
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2083 ]
|
Normal operation of telecom-grade network elements for supporting packet-based timing
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2082 ]
|
Packet Timing Monitor - Definition
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2081 ]
|
Annex for G.8273 discussing performance parameters for PTP clocks
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2080 ]
|
Organization of T-BC performance requirements
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2079 ]
|
Time Error of PTP master ports
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2078 ]
|
Time error accumulation in chains of phase/time clocks
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2077 ]
|
Estimating constant time error and related measurement methods for phase/time clocks
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2076 ]
|
Requirements for fibres used in next generation submarine systems and new recommended text for G.654
|
OFS Fitel, LLC
|
Q5/15
|
2012-08-24 |
|
[ 2075 ]
|
G.8260: Definition of Partial On-path Support
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2074 ]
|
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2073 ]
|
G.8272: Phase/Time Holdover Capability for a PRTC
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2072 ]
|
Update to G.8021 for retrieval of on-demand intermediate measurements
|
Alcatel-Lucent Italia S.p.A.
,
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2071 ]
|
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL: Proposal
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2070 ]
|
G.smp Objectives
|
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2069 ]
|
G.8272: Performance conditions for the PRTC
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2068 ]
|
G.8265.1: Value of the PTP "Renewal Invited" flag
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2067 ]
|
G.8265.1: Value of the PTP clockAccuracy Field
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2066 ]
|
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2065 ]
|
Proposed Input for G.smp Summary Clause re Capacity Efficiency
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2064 ]
(Rev.1) |
G.vdsl: Proposed Accuracy Target for LATN and SATN
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2063 ]
(Rev.1) |
G.8263: PDV Noise Tolerance Testing for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2062 ]
|
Mapping of 16G Fibre-Channel into OTN
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2012-08-24 |
|
[ 2061 ]
(Rev.1-2) |
Proposed Input for G.smp Summary Clause re Mesh Topology Definition
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2060 ]
|
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2059 ]
(Rev.1) |
G.ploam: Parameters for Data Gathering Messaging
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2057 ]
|
G.vdsl: Proposed text for Data Gathering Messaging
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 2056 ]
|
Generic considerations for protection resource assignments in G.smp
|
Alcatel-Lucent USA Inc.
,
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2055 ]
|
Distributed G.8031 proposal
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2054 ]
|
Requirements of Control Plane/Management Plane to support SMP
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2053 ]
(Rev.1) |
Development of a new PTP Profile for Time/Phase Distribution
|
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
|
Q13/15
|
2012-08-24 |
|
[ 2052 ]
|
Protection Interworking editorial comments
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2051 ]
|
Bi-directional SMP Operation and Signalling Flow Sequence
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2050 ]
(Rev.1) |
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame
|
ERDF
|
Q4C/15
|
2012-08-24 |
|
[ 2049 ]
|
Comments and clarifications on G.smp
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2048 ]
|
G.odusmp Support of Both ODUj and ODUk Restoration
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2047 ]
|
Use of CL-SNCG/S to simplify G.873.2 configurations
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2046 ]
|
Not used
Withdrawn by submitter
|
N/A (no se aplica)
|
Q9/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2044 ]
|
G.odusmp with TCM APS
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2043 ]
|
Alternative to legacy interfaces for connecting PRTC to T-GM
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2042 ]
|
G.8272: PRTC Support of SyncE and ESMC
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2041 ]
|
G.smp multiple failure protection pre-emption
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
Resultados :452 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):