International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : CACE : Circulars  Recently posted -  Search Meeting Documents
   
ITU-R CACE  CIR 

ITU-R CACE

Radiocommunication Assembly and Study Group work

Results:1048 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21  - Next Next
Circulars
 
Number 
Title Source AI/Question
Date
[ 792 ]  
 
Approval of 1 revised ITU-R Recommendation     SG 3     2016-11-23
[ 791 ]  
 
Meeting of Radiocommunication Study Group 3 (Radiowave propagation), Geneva, 30 March 2017     Director, BR     2016-11-09
[ 790 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting service), Geneva, 31 March 2017     Director, BR     2016-11-08
[ 789 ]  
 
Proposed adoption of 1 draft new ITU-R Recommendation and 2 draft revised ITU-R Recommendations (PSSA) and proposed suppression of 2 ITU-R Recommendations by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence). Proposed suppression of 2 ITU-R Recommendations     SG 6     2016-11-07
[ 788 ]  
 
Proposed approval of 1 draft revised ITU-R Question     SG 6     2016-11-07
[ 787 ]  
 
Proposed adoption of 1 draft new ITU-R Recommendation and its simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 4     2016-10-11
[ 786 ]  
 
Proposed approval of 1 draft new ITU-R Recommendation and 1 draft revised ITU-R Recommendation     SG 4     2016-10-11
[ 785 ]  
 
Adoption of 11 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 3     2016-09-22
[ 784 ]  
 
Proposed approval of 1 draft revised ITU-R Recommendation     SG 3     2016-09-15
[ 783 ]  
 
Approval of 2 revised ITU-R Questions     SG 3     2016-09-15
[ 782 ]  
 
Approval of 1 new ITU-R Question     SG 1     2016-08-23
[ 781 ]  
 
Adoption of 3 new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 1     2016-08-22
[ 780 ]  
 
Proposed adoption of 11 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 3     2016-07-11
[ 779 ]  
 
Proposed adoption by correspondence of 1 draft revised ITU-R Recommendation     SG 3     2016-07-08
[ 778 ]  
 
Proposed approval of 2 draft revised ITU-R Questions     SG 3     2016-07-08
[ 777 ]  
+Corr.1 
Meeting of Radiocommunication Study Group 5 (Terrestrial services), Geneva, 21-22 November 2016     Director, BR     2016-07-05
[ 776 ]  
 
Approval of 1 new ITU-R Recommendation and 1 revised ITU-R Recommendation     SG 6     2016-07-04
[ 775 ]  
 
Proposed approval of 1 draft new ITU-R Question     SG 1     2016-06-14
[ 774 ]  
 
Proposed adoption of 3 draft new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 1     2016-06-10
[ 773 ]  
 
Meeting of Radiocommunication Study Group 4 (Satellite services), Geneva, 7 October 2016     Director, BR     2016-06-01
[ 772 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting service), Geneva, 28 October 2016     Director, BR     2016-05-25
[ 771 ]  
 
Announcement of the establishment of Task Group 5/1 on WRC-19 agenda item 1.13     Director, BR     2016-05-09
[ 770 ]  
 
Adoption of 2 new ITU-R Recommendations and 1 revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) and suppression of 1 ITU-R Recommendation     SG 6     2016-04-27
[ 769 ]  
 
Proposed approval of 1 draft new ITU-R Recommendation and 1 draft revised ITU-R Recommendation     SG 6     2016-04-25
[ 768 ]  
 
Approval of 2 revised ITU-R Questions     SG 6     2016-04-19
[ 767 ]  
 
Proposed adoption by correspondence of 1 draft new ITU R Recommendation and 1 draft revised ITU-R Recommendation     SG 6     2016-02-10
[ 766 ]  
 
Proposed adoption of 2 draft new ITU-R Recommendations and 1 draft revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence). Proposed suppression of 1 ITU-R Recommendation     SG 6     2016-02-10
[ 765 ]  
 
Proposed approval of 2 draft revised ITU-R Questions     SG 6     2016-02-10
[ 764 ]  
 
Meeting of Radiocommunication Study Group 1 (Spectrum management), Geneva, 10 June 2016     Director, BR     2016-01-26
[ 763 ]  
 
Meeting of Radiocommunication Study Group 3 (Radiowave propagation), Geneva, 30 June 2016     Director, BR     2016-01-20
[ 762 ]  
 
Meeting of Radiocommunication Study Group 5 (Terrestrial services), Geneva, 9 May 2016     Director, BR     2016-01-12
[ 761 ]  
 
Meeting of Radiocommunication Study Group 7 (Science services), Geneva, 4 April 2016     Director, BR     2015-11-30
[ 760 ]  
 
Approval of 1 new ITU-R Recommendation     SG 4     2015-11-16
[ 759 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting service), Geneva, 5 February 2016     Director, BR     2015-11-05
[ 758 ]  
 
Adoption of 2 new ITU-R Recommendations and 15 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2015-10-14
[ 757 ]  
 
Adoption of 2 new ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence), Suppression of 27 ITU-R Questions     SG 6     2015-10-14
[ 756 ]  
 
Adoption of 4 new ITU-R Questions and 6 revised ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence). Suppression of 6 ITU-R Questions     SG 5     2015-10-02
[ 755 ]  
 
Adoption of 3 new ITU-R Recommendations and 8 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU=R 1-6 (Procedure for the simultaneous adoption and approval by correspondence)     SG 5     2015-09-30
[ 754 ]  
 
Approval of 1 new ITU-R Recommendation and 1 revised ITU-R Recommendation     SG 5     2015-09-29
[ 753 ]  
 
Proposed approval of 1 draft new ITU-R Recommendation     SG 4     2015-09-10
[ 752 ]  
 
Adoption of 1 new ITU-R Recommendation, 6 revised ITU-R Recommendations and 2 new ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence)     SG 4     2015-09-09
[ 751 ]  
 
Adoption of 3 revised ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence). Suppression of 1 ITU-R Question     SG 1     2015-08-24
[ 750 ]  
 
Adoption of 1 new ITU-R Recommendation and 3 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence)     SG 1     2015-08-24
[ 749 ]  
 
Adoption of 5 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence). Suppression of 4 ITU-R Recommendations     CCV     2015-08-17
[ 748 ]  
 
Adoption of 2 new ITU-R Recommendations and 1 revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence). Suppression of 1 ITU-R Question     SG 7     2015-08-05
[ 747 ]  
 
Proposed adoption of 2 draft new ITU-R Recommendations and 15 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2015-08-03
[ 746 ]  
 
Proposed adoption of 2 draft new ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondence) and proposed approval of suppression of 27 ITU-R Questions     SG 6     2015-08-03
[ 745 ]  
 
Adoption of 22 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1.6 (Procedure for the simultaneous adoption and approval by correspondence) and suppression of 1 ITU-R Recommendation     SG 3     2015-07-29
[ 744 ]  
 
Adoption de 5 revised ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU-R 1-6 (Procedure for the simultaneous adoption and approval by correspondance). Proposed modification of categories and/or target dates of 18 ITU-R Questions. Suppression of 1 ITU-R Question     SG 3     2015-07-28
[ 743 ]  
 
Proposed adoption of 4 draft new ITU-R Questions and 6 draft revised ITU-R Questions and their simultaneous approval by correspondence in accordance with § 10.3 of Resolution ITU R 1-6 (Procedure for the simultaneous adoption and approval by correspondence). Proposed approval of suppression of 6 ITU-R Questions     SG 5     2015-07-22
Results:1048 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-10-08