Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 195 ]
|
Selecting Measurement Points in Base Stations Evaluations
|
ANATEL, Brazil
|
Q3/5
|
2010-11-12 |
|
[ 194 ]
|
Additional information for phase 2 of L.1000
|
CIP, United States
|
Q21/5
|
2010-11-12 |
|
[ 193 ]
|
Proposal on future of draft Recommendation ITU-T K.deg
|
CIP, United States
|
Q16/5
|
2010-11-12 |
|
[ 192 ]
|
Document withdrawn
|
N/A (no se aplica)
|
|
2010-11-12 |
|
[ 191 ]
|
Document withdrawn
|
N/A (no se aplica)
|
|
2010-11-12 |
|
[ 190 ]
|
Contribution to L.methodology: Evaluation of the environmental impacts of ICT in countries
|
Nokia Siemens Networks
|
Q18/5
|
2010-11-12 |
|
[ 189 ]
|
Action items consideration to develop guidance for the assessment of GHG emission in the ICT sector
|
Korea (Republic of)
|
Q18/5
|
2010-11-12 |
|
[ 188 ]
|
Observed characteristics of GHG inventories of ICT organizations
|
Korea (Republic of)
|
Q18/5
|
2010-11-12 |
|
[ 187 ]
|
Clarification between L.methodology_ICT_projects and UNFCCC CDM methodologies
|
Korea (Republic of)
|
Q18/5
|
2010-11-12 |
|
[ 186 ]
|
Modification of Working document toward draft new Recommendation K.guide
|
Korea (Republic of)
|
Q3/5
|
2010-11-12 |
|
[ 185 ]
|
Proposal for update of the draft ITU-T Recommendation of L.methodology_ICT in organizations, "Methodology for environmental impact assessment of ICT in organizations"
|
Korea (Republic of)
,
Alcatel Lucent
|
Q18/5
|
2010-11-12 |
|
[ 184 ]
|
Suggestion of heterogeneous induction source consideration by experimental example
|
Korea (Republic of)
|
Q9/5
|
2010-11-12 |
|
[ 183 ]
|
Comparing the IEC MOV requirements with those from ITU-T K.77
|
Korea (Republic of)
|
Q11/5
|
2010-11-12 |
|
[ 182 ]
|
Proposal for K.guide: EMF levels by various transmitters
|
Korea (Republic of)
|
Q3/5
|
2010-11-12 |
|
[ 181 ]
|
Proposal for K.guide and K.61: Reduction of measurement time
|
Korea (Republic of)
|
Q3/5
|
2010-11-12 |
|
[ 180 ]
|
Proposal for K.guide: Requirements for the measurement equipment
|
Korea (Republic of)
|
Q3/5
|
2010-11-12 |
|
[ 179 ]
|
Proposal for K.guide: EMF levels around CDMA base stations
|
Korea (Republic of)
|
Q3/5
|
2010-11-12 |
|
[ 178 ]
|
Draft Recommendation ITU-T L.methodology_ICT goods, networks and services : Text for paragraph 7.2.2.3 and 7.2.2.4
|
Alcatel Lucent
|
Q18/5
|
2010-11-11 |
|
[ 177 ]
|
Proposed new study Question: Rural communications [Setting up a low cost sustainable telecommunication infrastructure in rural areas of developing nations]
|
Vihaan Networks Ltd.
|
QALL/5
|
2010-11-11 |
|
[ 176 ]
|
Proposal of interface specifications for Recommendation L.spec HVDC
|
Japan
|
Q19/5
|
2010-11-11 |
|
[ 175 ]
|
Proposal of Safety Standard Harmonization on DC Fuse issue and Connector
|
Japan
|
Q19/5
|
2010-11-11 |
|
[ 174 ]
|
Proposal on the detailed discussion about system boundary and life cycle phases of ICT goods
|
Japan
|
Q18/5
|
2010-11-11 |
|
[ 173 ]
|
Proposal of the case study on evaluated environmental impact of home office space in the United States of America
|
Japan
|
Q18/5
|
2010-11-11 |
|
[ 172 ]
(Rev.1) |
Draft text of ITU-T Recommendation K.leakage "Test method and requirements against information leak through unintentional EM emission", for consent
|
NTT
,
NICT
|
Q15/5
|
2010-11-11 |
|
[ 171 ]
|
Appendix IV for L.adapterPhase2 draft
|
China
|
Q21/5
|
2010-11-11 |
|
[ 170 ]
|
EMC and Safety study and proposal for L.adapterPhase2 draft
|
China
|
Q21/5
|
2010-11-11 |
|
[ 169 ]
|
Proposal on output power range classification for L.adapterPhase2 draft
|
China
|
Q21/5
|
2010-11-11 |
|
[ 168 ]
|
Proposal to establish a new work item on Universal Li-ion battery solution for mobile phone and other ICT device
|
China
|
Q21/5
|
2010-11-11 |
|
[ 167 ]
|
Proposed structure for recommendation L.metrics (energy efficiency metrics for telecommunication equipment)
|
China
|
Q17/5
|
2010-11-11 |
|
[ 166 ]
|
Propose a new Recommendation on telecommunication terminal equipment EMC
|
China
|
Q16/5
|
2010-11-11 |
|
[ 165 ]
|
Mutual-disturbance Test Requirements for Performance Degradation Evaluation of Converged Terminal Devices
|
China
|
Q16/5
|
2010-11-11 |
|
[ 164 ]
|
Proposal for update of Clause 8.2.5 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
|
ETRI
|
Q18/5
|
2010-11-11 |
|
[ 163 ]
|
Discussion and proposal for Clause 9, "ICT project validating," of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
|
ETRI
|
Q18/5
|
2010-11-11 |
|
[ 162 ]
|
Proposal for update of Clause 8 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
|
ETRI
|
Q18/5
|
2010-11-11 |
|
[ 161 ]
|
Draft skeleton of new Recommendation L.DC
|
Telecom Italia
,
Huawei
|
Q17/5
|
2010-11-11 |
|
[ 160 ]
|
First Draft of new Recommendation L. metrics
|
Telecom Italia
,
Huawei
|
Q17/5
|
2010-11-11 |
|
[ 159 ]
|
Effect of RBWs on measured electromagnetic fields from mobile phone base station
|
NICT
|
Q3/5
|
2010-11-09 |
|
[ 158 ]
|
Method for evaluating electromagnetic field in general public environment with wide frequency radio spectrum
|
NTT DoCoMo, Inc.
|
Q3/5
|
2010-11-09 |
|
[ 157 ]
|
System boundaries for ICT Goods (7.2.2.2)
|
Huawei Technologies
|
Q18/5
|
2010-11-09 |
|
[ 156 ]
|
Updated version of the software EMF-estimator (v 1.4.0)
|
Telekomunikacja Polska
|
Q3/5
|
2010-11-08 |
|
[ 155 ]
|
Re-allocation of deliverables currently under Q17/5
|
Alcatel-Lucent
|
Q20/5, Q18/5, Q17/5
|
2010-11-04 |
|
[ 154 ]
|
Measurement and analysis of electromagnetic disturbance from in-house BPL
|
China Telecom Corp.
|
Q8/5
|
2010-11-04 |
|
[ 153 ]
|
Environment and climate change
|
Ministry PTT Dem. Rep. Congo
|
Q17/5
|
2010-11-04 |
|
[ 152 ]
|
Preliminary Draft New Recommendation K.monitor
|
Telekomunikacja Polska, Poland
|
Q3/5
|
2010-10-26 |
|
[ 151 ]
|
Document withdrawn
Pls see TD 517 (GEN/5)
|
N/A (no se aplica)
|
|
2010-10-25 |
|
[ 150 ]
|
Document withdrawn
Pls see TD 518 (GEN/5)
|
N/A (no se aplica)
|
|
2010-10-25 |
|
[ 149 ]
|
New chapter for draft new Recommendation ITU-T K.appl
|
Tyco Electronics
,
EPCOS AG
|
Q13/5
|
2010-09-23 |
|
[ 148 ]
|
Proposal for a new Work Item Methodology to evaluate the GHG Impact of ICT in Cities
|
UK
|
Q18/5
|
2010-09-14 |
|
[ 147 ]
|
A discussion of external coaxial cable port shield leakage
|
Tyco Electronics
|
Q4/5
|
2010-07-22 |
|
[ 146 ]
|
Proposal for the Polymeric PTC section of K.appl
|
Tyco Electronics
|
Q13/5
|
2010-07-02 |
Resultados :520 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):