International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz (excluding IMT); wireless access in the fixed service; amateur and amateur-satellite service

Results:795 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 445 ]  
 
Report on disaster relief     PPDR Liaison Rapport     2010-04-27
[ 444 ]  
 
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-12 Agenda item 1.13     WP 4A     2010-04-14
[ 443 ]  
 
Follow-up study after the work of Joint Task Group 5-6 is over     Chairmen, SGs 5 and 6     2010-04-12
[ 442 ]  
 
Comments on version 10 of BWA Chapter of Land mobile Handbook     Alliance for Telecommunications Industry Solutions     2010-04-08
[ 441 ]  
 
Liaison statement to Working Parties 4A, 5A and 7C - Information for studies related to WRC-12 Agenda item 1.25     WP 4C     2010-03-23
[ 440 ]  
 
Liaison statement to Working Party 6A (copied to Working Parties 5A, 5B and 5C for information) - Sharing and compatibility studies related to IMT systems in the mobile service     WP 5D     2010-03-22
[ 439 ]  
 
Liaison statement to ITU-R Working Parties 1A and 5A (copied for information to ITU-T Study Group 5) - Isolation between co-located antennas of systems in the land mobile service including IMT     WP 5D     2010-03-22
[ 438 ]  
 
Liaison statement to WP 5A (copy to WP 5B) - Draft revision of Report ITU-R M.1051-1 - Public mobile telephone service with aircraft     WP 5D     2010-03-22
[ 437 ]  
 
Liaison statement to ITU-T SG 12 and ITU-R WP 5A on the revised draft new ITU-T Rec. H.codec.qoe "A framework for adaptive end-to-end QoS control based on variable bit-rate codecs in wireless networks"     ITU-T SG 16     2010-03-19
[ 436 ]  
 
Information on terminal parameters for the update of Report ITU-R M.2116     ETSI     2010-03-10
[ 435 ]  
 
Liaison statement (copied to WP 5A for information) - Techniques to improve the compatibility or sharing between IMT systems and FSS networks in the 3.4-3.6 GHz band     WP 5D     2010-03-10
[ 434 ]  
 
ITU-T G.9960 collaboration to address power line communication signal power     ITU-T SG 15     2010-03-05
[ 433 ]  
 
Liaison statement on draft Recommendation ITU-T Y.2281 (Y.NGN-vehicle) "Framework of networked vehicle using NGN"     ITU-T Q.12/13 Rapporteur Group     2010-03-03
[ 432 ]  
 
Results of the 17th RAG meeting     Chairman, SG 5     2010-03-03
[ 431 ]  
 
Liaison statement to involve the ITU-R Sector in the JCA-NID to address coordination of NID/USN/RFID standardization     TSAG Chairman     2010-03-01
[ 430 ]  
 
ABU views on WRC-12 Agenda items 1.5 and 1.13     Asia-Pacific Broadcasting Union (ABU)     2010-02-26
[ 429 ]  
 
Liaison statement to the relevant Working Parties of Study Groups 4, 5, 6 and 7 (copy to ITU-T Study Group 15 for information) - Further work on power line telecommunications     WP 1A   221-1/1   2010-03-01
[ 428 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 5A for information) - Preliminary draft revision of Recommendation ITU-R F.1191 - Bandwidths and unwanted emissions of digital fixed service systems     WP 1A     2010-02-18
[ 427 ]  
 
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2     WP 1B     2010-02-17
[ 426 ]  
 
Liaison statement to Working Parties 5A and 5D - Antenna-to-Antenna interference of two systems in the land mobile service     WP 1A     2010-02-12
[ 425 ]  
 
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C     WP 1A     2010-02-12
[ 424 ]  
 
Comments on preliminary draft revision of Report ITU-R M.2116     Alliance for Telecom. Ind. Solutions     2010-02-01
[ 423 ]  
 
Liaison statement on draft ITU-T Recommendation G.9971 (Ghntreq) "Requirements of transport functions in IP home network"     ITU-T SG 15     2010-01-26
[ 422 ]  
+Corr.1 
Additional information for the preparation of the draft CPM Report to WRC-12     Chairman, CPM-11     2010-01-22
[ 421 ]  
 
Imput on Land Mobile Handbook (LMH) BWA Edition     WiMAX Forum     2009-11-16
[ 420 ]  
 
Revision of Report ITU-R M.2116     WiMAX Forum     2009-11-16
[ 419 ]  
 
Input on working document towards preliminary draft new Report ITU-R S.[BWA-FSS]     WiMAX Forum     2009-11-16
[ 418 ]  
 
Liaison statement - Preliminary draft revision of Recommendation ITU-R F.1191 - Bandwidths and unwanted emissions of digital fixed service systems     WP 5C     2009-12-17
[ 417 ]  
 
Liaison statement - Interference modelling between HAPS gateway links and intelligent transportation systems and fixed wireless access systems in the 5 850-7 075 MHz band (WRC-12 Agenda item 1.20)     WP 5C     2009-12-17
[ 416 ]  
 
Liaison statement to Working Party 5A - Common activities of both WPs on developing preliminary draft new Report ITU-R F.[CROSS-BORDER]     WP 5C     2009-12-17
[ 415 ]  
 
Liaison statement to Working Parties 5A and 5C - Compatibility studies between radiolocation and mobile and fixed services in the band 30-300 MHz (WRC-12 Agenda item 1.14)     WP 5B     2009-12-11
[ 414 ]  
 
Liaison statement to Working Party 1A (copy to Working Parties 5A, 5B, 5C and 7D for information) - Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     WP 6A     2009-12-08
[ 413 ]  
 
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to WP 5A for information)     WP 5C     2009-12-08
[ 412 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 5C     2009-12-04
[ 411 ]  
+Ann.1-22 
Report on the fourth meeting of Working Party 5A (Geneva, 23 November to 2 December 2009)     Chairman, WP 5A     2009-12-02
[ 410 ]  
 
Final List of Participants - Working Party 5A (Geneva, 23 November-2 December 2009)     Director, BR     2009-12-02
[ 409 ]  
 
Reply to LS: Liaison statement on the development of a draft new Recommendation on performance and availability requirements and objectives for wireless access systems     ITU-T SG 12     2009-11-23
[ 408 ]  
 
Liaison statement to ITU-R Working Party 5A on studies related to WRC-12 Agenda item 1.23     WP 5B     2009-11-30
[ 407 ]  
 
Liaison statement to Working Party 5A (copy to Working Party 5C for information) - Protection criteria and system parameters for land mobile systems operating between 3 and 50 MHz     WP 5B     2009-11-30
[ 406 ]  
 
Liaison statement to Working Party 5A on studies related to WRC-12 Agenda item 1.23     WP 5C     2009-11-27
[ 405 ]  
 
Report on relevant activities in certain countries in Region 1     Region 1 Liaison Rapporteur     2009-11-23
[ 404 ]  
(Rev.1) 
List of documents issued     BR Study Group Department     2009-11-20
[ 403 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 6B     2009-11-20
[ 402 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems.     WP 6A     2009-11-20
[ 401 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 5A and 5C) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications     WP 6A     2009-11-20
[ 400 ]  
 
Report on relevant activities in certain countries in Region 2     Region 2 Liaison Rapporteur     2009-11-18
[ 399 ]  
 
Update on the correspondence activities since the 3rd meeting of Working Party 5A     Editor Vol.5 LMH     2009-11-18
[ 398 ]  
 
Issues drawing attention of the Working Parties in relation to the result of WTPF-09     Chairman, SG 5     2009-11-18
[ 397 ]  
 
Results from the third meeting of Study Group 5 (29 May 2009) of interest to Working Party 5A     Chairman, WP 5A     2009-11-18
[ 396 ]  
+Add.1 
Response liaison on the invitation for contributions in the development of an ITU-R Report on cognitive radio systems in the mobile service     Director, BR     2009-11-16
Results:795 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17