Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 309 ]
|
Proposals for inclusion into preliminary draft new Recommendation ITU-R BT.[ETMMPLAN] - Planning criteria for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands
|
Russian Federation
|
|
2013-10-31 |
|
[ 308 ]
|
Compatibility of mobile and broadcasting services in adjacent bands taking into account the outcome of wireless broadband equipment field test in terrestrial TV broadcasting frequency band
|
Russian Federation
|
|
2013-10-31 |
|
[ 307 ]
|
Tests of single frequency DRM radio networks in the SW range
|
Russian Federation
|
60/6
|
2013-10-31 |
|
[ 306 ]
|
Assessment of interference from mobile service networks base stations
|
Russian Federation
|
|
2013-10-31 |
|
[ 305 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy to all concerned Groups under WRC-15 agenda item 1.1 (Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, 3K, 3M, and Working Party 1A)) - Sharing parameters for WRC-15 agenda item 1.1
|
WP 5D
|
|
2013-10-29 |
|
[ 304 ]
|
Proposal of preliminary draft revision of Recommendation ITU-R BT.1306-6 - Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting
|
China (People's Republic of)
|
31/6
|
2013-10-29 |
|
[ 303 ]
|
Proposal of draft revision of Recommendation ITU-R BT.1206-1 - Spectrum limit masks for digital terrestrial television broadcasting
|
China (People's Republic of)
|
31/6
|
2013-10-29 |
|
[ 302 ]
|
Liaison statement to Working Party 6A - Updated information on SAB/SAP
|
JTG 4-5-6-7
|
|
2013-10-28 |
|
[ 301 ]
|
Proposed draft new Report on the importance of terrestrial broadcasting in providing emergency information to the public
|
Rapp. on Emergency Broadcasting
|
118-1/6
|
2013-10-28 |
|
[ 300 ]
|
Spectrum requirements for the future of broadcasting
|
RG on spectrum requirements
|
93/6, 65/6, 121/6, 105/6
|
2013-10-25 |
|
[ 299 ]
(Rev.1) |
T-DAB SFN channel reference model and FFT time window synchronization strategy, for ensuring acceptable SFN receiving performance for mobile T-DAB receivers
|
Telenor ASA
|
|
2013-10-22 |
|
[ 298 ]
|
Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 6A and 5D for information)
|
WPs 3K and 3M
|
|
2013-10-18 |
|
[ 297 ]
|
Status of texts
|
BR Study Group Department
|
|
2013-10-09 |
|
[ 296 ]
|
Liaison statement on draft revision of Recommendation ITU-R M.1076 "Wireless communication systems for persons with impaired hearing" (reply to Document 5B/110)
|
ITU-T JCA-AHF
|
|
2013-10-03 |
|
[ 295 ]
|
Liaison statement on draft revision of Recommendation ITU-R M.1076
|
ITU-T JCA-AHF
|
|
2013-10-03 |
|
[ 294 ]
|
International radio for disaster relief (IRDR)
|
High Frequency Co-ordination Conference
|
118-1/6
|
2013-10-02 |
|
[ 293 ]
|
The importance of terrestrial radio in international broadcasting
|
High Frequency Co-ordination Conference
|
118-1/6
|
2013-10-02 |
|
[ 292 ]
|
Liaison statement on ongoing collaboration regarding the importance of broadcasting for providing emergency information to the public
|
ITU-D SG 2
|
|
2013-10-02 |
|
[ 291 ]
|
Liaison statement to Working Party 4A and the Special Committee - (Copy for information to Working Parties 5A and 6A) - WRC-15 agenda item 9.1 (9.1.8)
|
WP 7B
|
|
2013-09-24 |
|
[ 290 ]
|
Recommendation ITU-R SM.1879-2 - The impact of power line high data rate telecommunication systems on radiocommunication systems below 470 MHz
|
SG 1
|
|
2013-09-19 |
|
[ 289 ]
|
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain
|
SG 1
|
|
2013-09-19 |
|
[ 288 ]
|
Possible need to revise handbooks issued by Study Group 6 in the past
|
Italy
,
Vatican City State
|
|
2013-08-08 |
|
[ 287 ]
|
Liaison statement to Working Parties 3K and 3M (copy to Working Parties 6A and 5D for information)
|
JTG 4-5-6-7
|
|
2013-08-05 |
|
[ 286 ]
|
Liaison statement to Working Party 5D (copy for information to WPs 1A and 6A) - Adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 agenda item 1.2
|
JTG 4-5-6-7
|
|
2013-08-05 |
|
[ 285 ]
|
Liaison statement to ITU-R Study Groups 4, 6 and 7 and to ITU-T Study Group 5 - The effect on Telecommunications of an extreme solar event
|
WP 3L
|
|
2013-07-25 |
|
[ 284 ]
|
Liaison statement on determination of the ITU-T G.fast PSD specification
|
ITU-T SG 15
|
|
2013-07-24 |
|
[ 283 ]
|
Liaison statement to Working Party 6A (copy to Joint Task Group 4-5-6-7 for information) - Correlation of short-term interfering signals
|
WP 3K
|
|
2013-07-01 |
|
[ 282 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable
|
WPs 3K and 3M
|
|
2013-07-01 |
|
[ 281 ]
|
Liaison statement to Working Party 6A - Maps of effective ground conductivity for use at MF
|
WP 3L
|
|
2013-07-01 |
|
[ 280 ]
|
Liaison statement to Working Parties 5A and 6A, and HFCC - Revisions to Recommendation ITU-R P.842
|
WP 3L
|
|
2013-07-01 |
|
[ 279 ]
|
Establishment of Intersector Rapporteur Groups between Working Parties of Study Group 6 and Study Group of ITU-T
|
Chairman, SG 6
|
|
2013-07-01 |
|
[ 278 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities
|
WP 1B
|
|
2013-06-21 |
|
[ 277 ]
|
Liaison statement to Working Party 6A - Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria
|
WP 1C
|
|
2013-06-20 |
|
[ 276 ]
|
Reply liaison statement to Working Party 6A - Comment on Recommendation ITU-R SM.2028
|
WP 1A
|
|
2013-06-17 |
|
[ 275 ]
|
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
|
WP 1A
|
|
2013-06-14 |
|
[ 274 ]
|
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast
|
WP 1A
|
|
2013-06-14 |
|
[ 273 ]
|
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T
|
WP 1A
|
|
2013-06-14 |
|
[ 272 ]
|
Liaison statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)
|
WP 1A
|
|
2013-06-14 |
|
[ 271 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1
|
WP 5A
|
|
2013-06-04 |
|
[ 270 ]
|
Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing
|
WP 5A
|
|
2013-06-03 |
|
[ 269 ]
|
Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems
|
WPs 5A, 5B and 5C
|
|
2013-06-03 |
|
[ 268 ]
|
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST
|
WPs 5A, 5B and 5C
|
|
2013-06-03 |
|
[ 267 ]
|
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076
|
WP 5B
|
|
2013-05-24 |
|
[ 266 ]
|
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]
|
JCA-AHF
|
|
2013-05-23 |
|
[ 265 ]
|
Liaison statement on nomination of JCA-AHF representatives
|
ITU-T JCA-AHF
|
|
2013-05-14 |
|
[ 264 ]
+Ann.1-21 |
Report of the meeting of Working Party 6A (Geneva, 16-24 April 2013)
|
Chairman, WP 6A
|
|
2013-04-24 |
|
[ 263 ]
|
Final List of Participants - Working Party 6A (Geneva, 16-24 April 2013)
|
Director, BR
|
|
2013-04-24 |
|
[ 262 ]
|
Liaison statement on the proposal for the revision of Report ITU-R BT.2249-2
|
WP 6C
|
|
2013-04-22 |
|
[ 261 ]
|
ICT sectorial consultation on the role of ICTS to promote the inclusion of persons with disabilities - Request for inputs from relevant ITU-R Study Groups
|
Note by the Secretary General
|
|
2013-04-19 |
|
[ 260 ]
|
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)
|
ITU-T FG-DR&NRR
|
|
2013-04-17 |
Results:659 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):