Contributions ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 565 ]
|
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5
|
Australia
|
AI1.5
|
2018-02-12 |
|
[ 564 ]
|
WRC-19 agenda item 9.1, issue 9.1.9 - Compatibility of fixed-satellite service with IMT-2020 applications of the mobile service in 51.4-52.4 GHz
|
Australia
|
AI9.1
|
2018-02-12 |
|
[ 563 ]
|
Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI9.1
|
2018-02-09 |
|
[ 562 ]
|
Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz ADJACENT BAND STUDIES]
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.6
|
2018-02-09 |
|
[ 561 ]
|
Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI9.1
|
2018-02-09 |
|
[ 560 ]
|
Input on preliminary draft CPM text for WRC-19 agenda item 7 - Issue K
|
Papua New Guinea
|
AI7
|
2018-02-12 |
|
[ 559 ]
|
Liaison statement - New ITU-T Study Group 13 terms and definitions
|
ITU-R CCV, ITU-T SCV
|
|
2018-02-09 |
|
[ 558 ]
|
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 7 - Issue J
|
Korea (Republic of)
|
AI7
|
2018-02-08 |
|
[ 557 ]
|
Proposed modifications to working document toward draft CPM text for WRC-19 agenda item 1.5
|
Korea (Republic of)
|
AI1.5
|
2018-02-08 |
|
[ 556 ]
|
Proposed updates to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS]
|
Korea (Republic of)
|
AI1.5
|
2018-02-08 |
|
[ 555 ]
|
Update on the sharing study with MS stations and aeronautical ESIM
|
Korea (Republic of)
|
AI1.5
|
2018-02-08 |
|
[ 554 ]
|
Modifications to the draft CPM text of agenda item 7, Issue B
|
Spain
,
HISPASAT, S.A.
|
AI7
|
2018-02-07 |
|
[ 553 ]
|
Maritime-ESIM coexistence with FS stations
|
Germany (Federal Republic of)
|
|
2018-02-06 |
|
[ 552 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-02-06 |
|
[ 551 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-02-06 |
|
[ 550 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
|
Japan
|
AI9.1
|
2018-02-06 |
|
[ 549 ]
|
Proposed modifcations to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
|
Japan
|
AI9.1
|
2018-02-06 |
|
[ 548 ]
|
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit
|
Japan
|
AI7
|
2018-02-06 |
|
[ 547 ]
|
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
|
Japan
|
AI7
|
2018-02-06 |
|
[ 546 ]
|
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
|
Japan
|
AI7
|
2018-02-06 |
|
[ 545 ]
|
Proposed updates to the working document towards draft CPM text for agenda item 9.1, issue 9.1.2
|
France
|
AI9.1
|
2018-02-05 |
|
[ 544 ]
|
Draft Note to Director, Radiocommunication Bureau - Cost recovery for non-Geostationary satellite systems
|
United States of America
|
|
2018-01-26 |
|
[ 543 ]
|
Draft Note to the BR Director - Cost recovery for non-GSO satellite networks
|
Luxembourg
|
|
2018-01-15 |
|
[ 542 ]
|
Cost recovery for non-GSO satellite systems
|
Director, BR
|
|
2018-01-08 |
|
[ 541 ]
|
Liaison statement to Working Parties 1C, 4A and 7C - Standards for broadcasting-satellite receiving equipment
|
WP 1A
|
|
2017-12-12 |
|
[ 540 ]
|
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
|
WP 1A
|
|
2017-12-12 |
|
[ 539 ]
|
Liaison statement to CISPR and ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 4A, 4B and 7C) - Interference from broadcasting-satellite receiving equipment
|
WP 1A
|
|
2017-12-12 |
|
[ 538 ]
|
Liaison statement to Working Party 4A (copy to Working Party 1C for information) - WRC-19 agenda item 9.1, issue 9.1.7
|
WP 1B
|
AI9.1
|
2017-12-08 |
|
[ 537 ]
|
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
|
ITU-T SG 5
|
|
2017-11-23 |
|
[ 536 ]
|
Liaison statement to Working Party 4A - Updated receiver characteristics of systems in the land mobile service for use in sharing and compatibility studies for WRC-19 agenda item 1.5
|
WP 5A
|
AI1.5
|
2017-11-22 |
|
[ 535 ]
|
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14
|
WP 5C
|
AI1.14
|
2017-11-22 |
|
[ 534 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
|
WP 5C
|
|
2017-11-22 |
|
[ 533 ]
|
Liaison statement to Working Party 4A - Sharing and compatibility studies regarding WRC-19 agenda item 1.16
|
WP 5A
|
AI1.16
|
2017-11-21 |
|
[ 532 ]
|
Reply liaison statement to Working Party 4A (copied to Working Parties 4C and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions
|
WP 5A
|
|
2017-11-21 |
|
[ 531 ]
|
Reply liaison statement to Working Party 4A - Use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5 29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service
|
WP 5C
|
AI1.5
|
2017-11-21 |
|
[ 530 ]
|
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
|
WP 5B
|
AI1.10
|
2017-11-20 |
|
[ 529 ]
|
Liaison statement to Working Parties 4A, 5A, 5C and 7C - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz
|
WP 5B
|
|
2017-11-20 |
|
[ 528 ]
|
Liaison statement to Working Parties 4A, 4C and 7B - Draft documents including draft CPM text related to WRC-19 agenda item 9.1 issue 9.1.4 - ITU-R Resolution 763 (WRC-15)
|
WP 5B
|
AI9.1
|
2017-11-20 |
|
[ 527 ]
|
Reply liaison statement to Working Party 4A - Potential issues with the antenna parameters in Recommendation ITU-R RS.1861 in relation to studies under WRC-19 agenda item 9.1.9
|
WP 7C
|
AI 9.1.9
|
2017-11-02 |
|
[ 526 ]
|
Reply to the BR Director with copy to Working Parties 4A, 4B and 4C - Cost recovery for non-GSO satellite networks
|
WPs 7B and 7C
|
|
2017-11-01 |
|
[ 525 ]
|
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems»
|
WP 7A
|
|
2017-11-01 |
|
[ 524 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
|
WP 7B
|
AI1.7
|
2017-11-01 |
|
[ 523 ]
|
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
|
WP 7B
|
|
2017-11-03 |
|
[ 522 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 5D) - WRC-19 agenda items 1.6 and 9.1 (issue 9.1.9)
|
WP 7C
|
AI9.1, AI1.6
|
2017-10-31 |
|
[ 521 ]
|
Liaison statement to Working Parties 1A, 4A, 5A, 5C and Task Group 5/1 - Apportionment of EESS (passive) protection criteria in Recommendation ITU-R RS.2017
|
WP 7C
|
|
2017-10-31 |
|
[ 520 ]
|
Reply liaison statement to Working Party 4A: WRC-19 agenda item 1.6
|
WP 7D
|
AI1.6
|
2017-10-30 |
|
[ 519 ]
+Ann.1-53 |
Report on the meeting of Working Party 4A (Geneva, 17-27 October 2017)
|
Chairman, WP 4A
|
|
2017-10-27 |
|
[ 518 ]
|
Final list of participants - Working Party 4A (Geneva, 17-27 October 2017)
|
Director, BR
|
|
2017-10-27 |
|
[ 517 ]
|
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
|
WP 6A
|
AI1.7
|
2017-10-24 |
|
[ 516 ]
|
Liaison statement to Working Parties 4A and 4C - Performance objectives for satellite connections using adaptive coding and modulation
|
WP 4B
|
|
2017-10-18 |
Results:915 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Next
![Next](/res/templates/dms/images/next.gif)
|
Multiple Document Download: Formats and Languages to be included (when available):