Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 116 ]
|
Proposed revision of the work plan for ITU-R Reports of wireless power transmission via Radio Frequency Beam
|
Japan
|
Q210/1
|
2016-11-15 |
|
[ 115 ]
|
Proposal of a new Report ITU-R SM.[WPT.SPEC.MNGM] "Methodology for spectrum management of wireless power transmission"
|
Japan
|
Q210/1
|
2016-11-15 |
|
[ 114 ]
|
Studies on the impact of wireless power transmission for electric vehicles on broadcasting service
|
Japan
|
Q210/1, AI9.1
|
2016-11-15 |
|
[ 113 ]
|
Summary of studies on the impact of WPT for electric vehicle applications to radio communication services in Japan
|
Japan
|
Q210/1
|
2016-11-15 |
|
[ 112 ]
(Rev.1) |
Progress Report on "Visible light communication"
|
Netherlands (Kingdom of the)
|
|
2016-11-14 |
|
[ 111 ]
|
Liaison statement to Working Party 1A (copied for information to Working Party 6A and ICAO) - Proposed revision of Recommendation ITU-R SM.1009-1
|
WP 5B
|
|
2016-11-14 |
|
[ 110 ]
|
Proposed modifications to Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems
|
European Communications Office
|
|
2016-11-11 |
|
[ 109 ]
|
Reply liaison statement to Working Party 5C - Copied to Working Party 1A and Working Party 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ]
|
WP 5B
|
|
2016-11-11 |
|
[ 108 ]
|
Some comments on the limits for WPT
|
Germany (Federal Republic of)
|
Q210/1, AI9.1
|
2016-11-09 |
|
[ 107 ]
|
Proposed modifications to Report ITU-R SM.2392-0: Inclusion of emerging WPT Technologies for Global or Regional Operation Beam-type Wireless Power Transmission (WPT) systems
|
United States of America
|
|
2016-11-07 |
|
[ 106 ]
|
Proposed modifications to Report ITU-R SM.2303-1: Wireless power transmission using technologies other than radio frequency beam
|
United States of America
|
|
2016-11-07 |
|
[ 105 ]
|
Proposed modifications to draft new Recommendation ITU-R SM.[WPT] - Frequency ranges for global or regional operation and human hazards of Non-Beam Wireless Power Transmission (WPT) systems
|
United States of America
|
|
2016-11-07 |
|
[ 104 ]
|
Proposed contribution to a working document towards a preliminary draft new Report ITU-R SM.[WPT Beam Impacts} - Impact study and human hazard issues for wireless power transmission
|
United States of America
|
|
2016-11-07 |
|
[ 103 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[GENERAL PRINCIPLES AND METHODS FOR SHARING BETWEEN RADIOCOMMUNICATION SERVICES]
|
United States of America
|
|
2016-11-07 |
|
[ 102 ]
|
Views on the proposed revision of Recommendation ITU-R SM.1009-1
|
United States of America
|
|
2016-11-07 |
|
[ 101 ]
|
Proposed frequency bands for wireless power transmission systems
|
Robert Bosch GmbH
|
Q210/1
|
2016-11-07 |
|
[ 100 ]
|
Opinion on revision of Recommendation ITU-R SM.1448
|
Netherlands (Kingdom of the)
|
|
2016-11-07 |
|
[ 99 ]
|
Liaison statement WPT activities
|
European Telecommunications Standards Institute
|
|
2016-11-02 |
|
[ 98 ]
|
Liaison statement to Working Party 1A - Revision of Recommendation ITU-R SM.851 - Sharing between the broadcasting service and the fixed and/or mobile services in the VHF and UHF bands
|
WP 6A
|
|
2016-11-04 |
|
[ 97 ]
|
Liaison statement to Working Party 1A (copy for information to Working Party 5B) - Proposed revision of Recommendation ITU-R SM.1009-1
|
WP 6A
|
|
2016-11-04 |
|
[ 96 ]
|
This document has been withdrawn
|
WP 6A
|
|
2016-11-04 |
|
[ 95 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
|
WP 4A
|
|
2016-11-02 |
|
[ 94 ]
|
Reply liaison statement to Working Party 5B regarding technical characteristics for WRC-19 agenda item 1.9.2 (copy to Working Party 1A for information)
|
WP 7D
|
AI1.9.2
|
2016-11-01 |
|
[ 93 ]
|
Liaison statement to Working Party 1A - Technical and operational characteristics of radio astronomy systems in the spectrum band 275-450 GHz
|
WP 7D
|
|
2016-11-01 |
|
[ 92 ]
|
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 7D
|
Q210/1
|
2016-11-01 |
|
[ 91 ]
|
Reply liaison statement to Working Party 1A on WRC-19 agenda item 1.15 (copy to Working Parties 5A and 5D)
|
WP 7C
|
AI1.15
|
2016-11-01 |
|
[ 90 ]
|
Reply liaison statement to Working Party 1A - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 7A
|
|
2016-10-28 |
|
[ 89 ]
|
Revision of Recommendation ITU-R SM.1448 based on Recommendation ITU-R P.620
|
ATDI
|
|
2016-10-24 |
|
[ 88 ]
|
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
|
ITU-D SG 2
|
|
2016-10-24 |
|
[ 87 ]
|
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Study Group 1 Working Party 1A on collaboration
|
ITU-D SG 2
|
|
2016-10-24 |
|
[ 86 ]
|
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT)
|
WP 6A
|
Q210/1
|
2016-10-21 |
|
[ 85 ]
|
Liaison statement on leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
|
ITU-T SG 5
|
|
2016-10-19 |
|
[ 84 ]
|
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
|
ITU-T SG 5
|
|
2016-10-18 |
|
[ 83 ]
|
New version of the Home Network Transport (HNT) Standards Overview and Work Plan
|
ITU-T SG 15
|
|
2016-10-06 |
|
[ 82 ]
|
New version of the Access Network Transport (ANT) Standards Overview and Work Plan
|
ITU-T SG 15
|
|
2016-10-06 |
|
[ 81 ]
|
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans
|
ITU-T SG 15
|
|
2016-10-06 |
|
[ 80 ]
|
Answer to liaison statement to External Organizations on Report ITU-R SM.[SMART_GRID] on the Smart Grid project
|
Telefon AB - LM Ericsson
,
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
Ligado NETWORKS LLC
,
NEC Corporation
,
Nokia Solutions and Networks Oy
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Telecom Italia S.p.A.
|
|
2016-09-27 |
|
[ 79 ]
|
Liaison statement on recent work by JCA-IoT and SC&C
|
ITU-T JCA-IoT & SC&C
|
|
2016-09-26 |
|
[ 78 ]
|
Reply liaison statement to Working Party 1A on WPT activities
|
International Electrotechnical Commission
|
|
2016-09-23 |
|
[ 77 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-19
|
Chairman, CPM-19
|
|
2016-09-19 |
|
[ 76 ]
|
Liaison statement to ITU-R Working Party 1A (copy to Working Party 1B and RG-WPT) - Information on current status of study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group
|
Asia-Pacific Telecommunity
|
|
2016-09-16 |
|
[ 75 ]
|
Liaison statement - Leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
|
ITU-T SG9
|
|
2016-09-09 |
|
[ 74 ]
|
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15
|
WPs 3K and 3M
|
AI1.15
|
2016-07-06 |
|
[ 73 ]
|
Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
|
ITU-T SG 15
|
|
2016-07-06 |
|
[ 72 ]
(Rev.1) |
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz
|
WPs 3K and 3M
|
|
2016-07-04 |
|
[ 71 ]
|
Liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 7C and 7D) - Initial considerations on candidate frequency bands for use by systems in the land mobile and fixed services in the range 275-450 GHz
|
WP 3M
|
AI_1.15, 257/5, 256/5, 228/3
|
2016-07-04 |
|
[ 70 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A,
4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
|
WP 3J
|
|
2016-07-01 |
|
[ 69 ]
|
Reply liaison statement to Working Party 1A (copied to Working Parties 1C, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of other emissions to radiocommunication services
|
WP 3L
|
|
2016-07-01 |
|
[ 68 ]
|
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information)
|
WP 5D
|
|
2016-06-28 |
|
[ 67 ]
|
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7
|
WP 5D
|
AI1.7
|
2016-06-24 |
Resultados :466 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):