Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1838 ]
|
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission
|
Futurewei Technologies US R&D Center
,
Metanoia Technologies, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1837 ]
|
Proposed definition and text for ODUCn GMP ?CnD CRC-9 overhead in G.709
|
Microsemi Corporation
|
Q11/15
|
2016-02-02 |
|
[ 1836 ]
|
G.vlc: Proposed Dimming Control Scheme for Low-Speed VLC
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1835 ]
|
G.vlc: OOK for Indoor Low-Speed VLC
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1834 ]
|
G.vlc: On Optical Wireless Communication Channel Model
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1833 ]
|
G.vlc: OFDM with Dimming Control for High-Speed VLC
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1832 ]
|
G.vlc: OFDM for Indoor High-Speed VLC
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1831 ]
|
G.vlc: Multiple Asymmetrically Clipped Optical OFDM
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1830 ]
|
G.vlc: Feasibility of Specifying VLC as a Profile of G.hn Recommendations
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-02-02 |
|
[ 1829 ]
|
GPON Time Error Transfer performance and interface mapping
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-02-02 |
|
[ 1828 ]
|
Transport / Access Time Phase HRM
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-02-02 |
|
[ 1827 ]
|
Transmission of non-G.8275.1 PTP messages
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-02-02 |
|
[ 1826 ]
|
Extended SSM message of OTN
|
Huawei Technologies Co., Ltd.
,
China Mobile Communications Corporation
,
Orange
|
Q13/15, Q11/15
|
2016-02-02 |
|
[ 1825 ]
|
Frequency and phase/time Synchronization of partial scenario
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1824 ]
|
PRTC+ MTIE and TDEV masks
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1823 ]
|
New Simulation Results for RMS Frequency Offset for Transport of a CPRI Client over OTN
|
Huawei Technologies Co., Ltd.
|
Q13/15, Q11/15
|
2016-02-02 |
|
[ 1822 ]
|
Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN - Computational Considerations
|
Huawei Technologies Co., Ltd.
|
Q13/15, Q11/15
|
2016-02-02 |
|
[ 1821 ]
|
Consideration of CPRI clock transport over OTN
|
Huawei Technologies Co., Ltd.
|
Q13/15, Q11/15
|
2016-02-02 |
|
[ 1820 ]
|
ToD protocol
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1819 ]
|
Wander Accumulation Simulation Results for Transport of a 1 GB Ethernet Client over B100G OTN based on Multiple Replications
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1818 ]
|
10Mhz interface
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1817 ]
|
G.fast: Reduction of number VF samples reporting formats
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1816 ]
|
G.fast: Clarification on byte order in SOC and EOC messages.
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1815 ]
|
OOC-PSD mask in NG-PON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2016-02-02 |
|
[ 1814 ]
|
Proposal precautions for the use of GNSS receivers
|
Orange
|
Q13/15
|
2016-02-02 |
|
[ 1813 ]
|
Observed GPS UTC information malfunction - for information
|
Orange
|
Q13/15
|
2016-02-02 |
|
[ 1812 ]
|
G.fast: G.9701 test parameters text improvements
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1811 ]
|
Proposal for G.654.E fibre
|
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2016-02-02 |
|
[ 1810 ]
|
G.fast: Various text updates to G.9701 Amd1 Low power mode
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1809 ]
|
G.fast: Proposal to restrict upstream transmit power for 8dBm profile
|
Broadcom Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1808 ]
|
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1807 ]
|
G.vdsl: Mis-estimation of SNR during MEDLEY
|
Broadcom Corporation
,
Intel Corporation
,
Qualcomm, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1804 ]
|
G.fast: G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1803 ]
|
G.vlc: Modulations formats for G.vlc
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1802 ]
|
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1801 ]
|
G.ploam, G.fast: Clarification on Unavailable State for corrigendum
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1800 ]
|
G.ploam: Test parameter update time stamps in G.997.2 Amd1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1799 ]
|
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1798 ]
|
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1797 ]
|
G.ploam: Missing lom failure in G.997.1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1796 ]
|
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-02 |
|
[ 1795 ]
|
G.hn: On the use of G.hn over twisted pair cables
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1794 ]
|
Cascaded and nested protection
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2016-02-02 |
|
[ 1793 ]
|
Optical Media SDN Control Dependencies
|
Xtera Communications, Inc.
|
Q14/15, Q12/15
|
2016-02-02 |
|
[ 1792 ]
|
G.vector: Considerations about Multi-Vendor Vectoring standardization
|
Telecom Italia S.p.A.
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1790 ]
|
Test result for multi-domain nested protection
|
China Unicom
|
Q9/15
|
2016-02-02 |
|
[ 1789 ]
|
G.hn: Implementation on the agreements on centralized coordination of neighbouring domains
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):