International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 515 ]  
 
List of documents issued (Documents 4A/364 - 4A/515)     BR Study Groups Department     2017-10-17
[ 514 ]  
 
Liaison statement to Working Party 4A - Application of coordination arc in the Ka band under WRC-19 agenda item 7 issue B     WP 4C     2017-10-17
[ 513 ]  
(Rev.1) 
Note to the Chairman of Study Group 4 (copy for information to Working Parties 4A and 4B) - Cost recovery for non-GSO satellite networks     WP 4C     2017-10-17
[ 512 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 4C     2017-10-16
[ 511 ]  
 
Reply liaison statement to Task Group 5/1 (copy to WPs 4A, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020     WP 4C     2017-10-16
[ 510 ]  
 
Liaison statement to Working Party 4A - RR Appendix 4 data elements to be provided for non-geostationary satellite systems     WP 4C   AI7   2017-10-16
[ 509 ]  
 
Note to the Director, Radiocommunication Bureau (copy for information to Working Party 4A) - Non-geostationary satellites with short duration missions operating in mobile-satellite service (MSS) allocations     WP 4C     2017-10-16
[ 508 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters     WP 4C     2017-10-16
[ 507 ]  
 
Liaison statement to Working Party 4A - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3     WP 5D     2017-10-11
[ 506 ]  
 
Liaison statement to Task Group 5/1 (copied to Working Parties 4A and 5C for information) - Total integrated gain for the active antenna system (AAS) antenna pattern     WP 5D     2017-10-11
[ 505 ]  
 
Guidelines for reporting harmful interference for cases of GSO satellite services     World Broadcasting Unions - Technical Committee     2017-10-10
[ 504 ]  
 
FSS technical parameters for sharing studies under WRC-19 agenda item 1.13 and 1.14     Inmarsat Plc.   AI1.14, AI1.13   2017-10-10
[ 503 ]  
 
Working document toward a draft new Report - Technical feasibility of NGSO-to-GSO satellite links     United States of America     2017-10-10
[ 502 ]  
 
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5     United States of America   AI1.5   2017-10-10
[ 501 ]  
 
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     United States of America   AI1.5   2017-10-10
[ 500 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz     United States of America   AI1.5   2017-10-10
[ 499 ]  
 
Proposal for CPM text on WRC-19 agenda item 1.4 - Review of Annex 7 to Appendix 30 (Rev. WRC-12)     Papua New Guinea   AI1.4   2017-10-10
[ 498 ]  
 
WRC-19 agenda item 7 issue A     Luxembourg   AI7   2017-10-10
[ 497 ]  
 
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     Luxembourg   AI.4   2017-10-10
[ 496 ]  
 
Preliminary draft new Report for WRC-19 agenda item 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR - Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions - Agenda item 1.4     Luxembourg   AI1.4   2017-10-10
[ 495 ]  
 
Alternative proposal regarding limitation A3 - Agenda item 1.4     Luxembourg   AI1.4   2017-10-10
[ 494 ]  
 
Draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8 GHZ] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting-satellite service, ...     Luxembourg     2017-10-10
[ 493 ]  
 
Sharing and compatibility between ESIM and terrestrial services     Austria , France , Germany (Federal Republic of) , Inmarsat Plc. , Luxembourg , Netherlands (Kingdom of the) , Norway     2017-10-10
[ 492 ]  
 
Proposal for amendments of CPM text - WRC-19 agenda item 1.4     Egypt (Arab Republic of) , Oman (Sultanate of) , Saudi Arabia (Kingdom of) , United Arab Emirates   AI1.4   2017-10-10
[ 491 ]  
 
Technical characteristics of GSO FSS parameters WRC-19 agenda item 1.6     SES WORLD SKIES   AI1.6   2017-10-10
[ 490 ]  
 
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6     SES WORLD SKIES   AI1.6   2017-10-10
[ 489 ]  
 
Proposal to revise Recommendation ITU-R S.1782-0, possibilities for global broadband internet access by fixed satellite systems, along with the Recommendation ITU-R S.1783-0, technical and operational features characterizing high-density applications in the fixed-satellite service     France     2017-10-10
[ 488 ]  
 
WRC-19 agenda item 7, issue A - Proposal for a milestone-based system to verify compliance of use of frequency assignments to non-Geostationary FSS systems with their associated notified characteristics     France   AI7   2017-10-10
[ 487 ]  
 
WRC-19 agenda item 9.1, issue 9.1.3 - Possible regulatory option to address the needs of new non-Geostationary systems in the 3 700-4 200 MHz and 5 925-6 425 MHz frequency bands     France   AI9.1   2017-10-10
[ 486 ]  
 
Proposed modifications to the preliminary draft new Report ITU-R S.[SPECTRUM_NEEDS] - WRC-19 agenda item 9.1 issue 9.1.9     France   AI9.1   2017-10-10
[ 485 ]  
 
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - WRC-19 agenda item 9.1 issue 9.1.9     France   AI9.1   2017-10-10
[ 484 ]  
 
Compatibility studies between a possible new allocation to the FSS in the 51.4 - 52.4 GHz band and the EESS (passive) in the 52.6 - 54.25 GHz band - WRC-19 agenda item 9.1, issue 9.1.9     France   AI9.1   2017-10-10
[ 483 ]  
 
Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.9     France   AI9.1   2017-10-10
[ 482 ]  
 
Impact of the percentage of time in propagation between a time-invariant transmitter and a receiver     France     2017-10-10
[ 481 ]  
 
Working document - Simplified regulatory regime for non-GSO satellites with short duration missions     South Africa (Republic of)     2017-10-10
[ 480 ]  
 
Proposed changes to working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue G: Updating the reference situation for networks under RR Appendices 30 and 30A when provisional recording is used     Norway   AI7   2017-10-10
[ 479 ]  
 
Studies on protection of FS links in EACO countries     Burundi (Republic of) , Kenya (Republic of) , Rwanda (Republic of) , South Sudan (Republic of) , Tanzania (United Republic of) , Uganda (Republic of)   AI1.5   2017-10-10
[ 478 ]  
 
Justification statistics of RR Appendix 30B - On WRC-19, Issue E and New Issues X and Y     Iran (Islamic Republic of)   AI7   2017-10-10
[ 477 ]  
 
Study of interference by a non-GSO system to a GSO system in Q/V frequency band     Iran (Islamic Republic of)   AI1.6   2017-10-10
[ 476 ]  
 
Implementation of IMT system in frequency band 1 452-1 492 MHz Region 1     Iran (Islamic Republic of)     2017-10-10
[ 475 ]  
 
Mobile Satellite-Service feeder link characteristics for studies regarding WRC-19 agenda item 1.16     Globalstar, Inc.   AI1.16   2017-10-10
[ 474 ]  
 
Draft reply liaison statement to Working Party 1B - Studies on managing transmissions of terminals to be limited to authorised terminals     United States of America     2017-10-10
[ 473 ]  
 
Agenda item 7, issue C - Issues for which consensus was readily achieved in ITU-R - Studies concerning the return of frequency notices under Radio Regulation (RR) no. 11.38 (C5)     United States of America   AI7   2017-10-10
[ 472 ]  
 
Updates to working document towards preliminary draft CPM for WRC-19 agenda item 9.1, issue 9.1.3 - WRC-19 agenda item 9.1, issue 9.1.3     United States of America   AI9.1   2017-10-10
[ 471 ]  
 
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6     United States of America   AI1.6   2017-10-10
[ 470 ]  
 
Proposed updates to working document towards a preliminary draft new Report on sharing between 50/40 GHz GSO networks and non-GSO systems - WRC-19 agenda item 1.6     United States of America   AI1.6   2017-10-10
[ 469 ]  
 
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING METHODOLOGY]     United States of America   AI1.6   2017-10-10
[ 468 ]  
 
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4     United States of America   AI1.4   2017-10-10
[ 467 ]  
 
Preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions     United States of America   AI1.4   2017-10-10
[ 466 ]  
 
Working document towards a preliminary draft new Recommendation/Report on statistical methodologies to estimate the interferences from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the fixed-satellite service into mobile service (MS) stations operating in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-10-10
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18