International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7B  C 

ITU-R WP7B

Space Radiocommunication Applications

Results:416 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 16 ]  
 
Proposed liaison statement requesting technical characteristics for studies to be conducted agenda item 1.3     United States of America     2016-03-28
[ 15 ]  
 
Draft liaison statement to Working Parties 4C, 5A, 3M regarding WRC-19 agenda item 1.2 (copy to Working Party 3M for information)     United States of America     2016-03-28
[ 14 ]  
 
Working document toward a preliminary draft new Report performing sharing studies to consider in-band power limits for Earth stations operating in the frequency ranges 401-403 MHz and 399.9-400.05 MHz for the MSS, EESS, and MetSat services     United States of America     2016-03-28
[ 13 ]  
 
Proposal for a potential revision of Recommendation ITU-R P.528 & Report ITU-R P.2345 by Working Party 3K & 3M     France     2016-03-28
[ 12 ]  
 
Proposed liaison statement relative to the technical characteristics of mobile, fixed, maritime mobile, broadcasting and mobile satellite services for studies to be conducted under agenda item 1.3     France     2016-03-28
[ 11 ]  
 
Agenda item 1.3 (WRC-19)     France     2016-03-28
[ 10 ]  
 
Proposed liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13     United Kingdom of Great Britain and Northern Ireland     2016-03-24
[ 9 ]  
 
Review of ITU-R Recommendation dealing with EESS/MetSat interference and sharing criteria     European Organisation for the Exploitation of Meteorological Satellites     2016-03-23
[ 8 ]  
 
Proposed modification of the preliminary draft [NEW REPORT OR RECOMMENDATION] ITU-R SA.[DRS_ARCH_FREQ]     Russian Federation     2016-03-22
[ 7 ]  
(Rev.1) 
Studies on WRC-19 agenda item 1.7     Netherlands (Kingdom of the)     2016-03-22
[ 6 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 5 ]  
 
Organization of Working Party 7B and terms of reference of its Working Groups     Chairman, WP 7B     2016-02-04
[ 4 ]  
 
Working document on the work plan and milestones for agenda item 1.7     Chairman, WP 7B     2016-02-04
[ 3 ]  
 
Working document on the work plan and milestones for agenda item 1.3     Chairman, WP 7B     2016-02-04
[ 2 ]  
 
Working document on the work plan and milestones for agenda item 1.2     Chairman, WP 7B     2016-02-04
[ 1 ]  
 
Documents to be carried over from the 2012-2015 study period     WP 7B     2015-12-08
Results:416 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-11