Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 502 ]
|
Proposed ICT sector and sub-sector trajectories
|
Telefon AB - LM Ericsson (Sweden)
|
Q9/5
|
2019-04-30 |
|
[ 501 ]
(Rev.1) |
Proposal for 1,5 degrees trajectory and baseline for the ICT sector from January
|
Telefon AB - LM Ericsson (Sweden)
|
Q9/5
|
2019-04-30 |
|
[ 500 ]
(Rev.1) |
Proposal for a baseline for the ICT sector (from March)
|
Telefon AB - LM Ericsson (Sweden)
|
Q9/5
|
2019-04-30 |
|
[ 499 ]
(Rev.1) |
Interim information regarding possible ICT sector and subsector trajectories (from March)
|
Telefon AB - LM Ericsson (Sweden)
|
Q9/5
|
2019-04-30 |
|
[ 498 ]
(Rev.1) |
Electro Magnetic Field from Mobile Communications Base stations - Co-ordination in Shared sites Deployment, Monitoring, Compliance and Public Awareness Mechanism.
|
India
|
Q3/5
|
2019-04-30 |
|
[ 497 ]
|
Proposal for the revision of K.34 (07/2003) "Classification of electromagnetic environmental conditions for telecommunication equipment - Basic EMC Recommendation"
|
Nokia Corporation (Finland)
|
Q4/5
|
2019-04-30 |
|
[ 496 ]
(Rev.1) |
RF exposure compliance approach based on actual max service
|
Nokia Corporation (Finland)
,
Telefon AB - LM Ericsson (Sweden)
,
Telefónica S.A. (Spain)
,
Telstra Corporation Ltd. (Australia)
,
Vodafone Group Plc. (United Kingdom)
|
Q3/5
|
2019-04-30 |
|
[ 495 ]
|
Proposed new work item on draft Supplement ITU-T K.Sup.telecom_system to ITU-T K.44 "Causes of telecommunication system overvoltage and overcurrent conditions and their expected levels"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-30 |
|
[ 494 ]
|
Proposed new work item on draft Supplement ITU-T K.Sup.Test_conditions to ITU-T K.44 "Test conditions and methods"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-30 |
|
[ 493 ]
(Rev.1-2) |
Proposed new work item on K.STR.EMF_assess - "EMF strength inside the subway train"
|
Korea (Rep. of)
|
Q3/5
|
2019-04-30 |
|
[ 492 ]
|
Proposal for updating baseline document of L.SES
|
Korea (Rep. of)
|
Q6/5
|
2019-04-30 |
|
[ 491 ]
(Rev.1) |
Proposal to conduct a survey on the Recycling of used EV Batteries
|
Korea (Rep. of)
|
Q7/5
|
2019-04-30 |
|
[ 490 ]
(Rev.1-2) |
K Suppl. 16 on "Electromagnetic field (EMF) compliance assessments for 5G wireless networks ": EMF extrapolation method for 5G NR radio station
|
Korea (Rep. of)
|
Q3/5
|
2019-04-30 |
|
[ 489 ]
|
L.SES on "Use of ICT sites to support environmental sensing": Proposal for updating clause 8 and Bibliography
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q6/5
|
2019-04-30 |
|
[ 488 ]
(Rev.1) |
L.EE_frame: proposal for the new recommendation Energy efficiency framework
|
Argentina
,
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-30 |
|
[ 487 ]
|
A.1 form for new work item proposal on methodologies for evaluating the functionality and performance of power supply unit configured for servers
|
China Unicom
|
Q6/5
|
2019-04-29 |
|
[ 486 ]
|
K.workers - "Assessment and management of compliance with RF EMF exposure limits for workers at radiocommunication sites"
|
Telstra Corporation Ltd. (Australia)
,
Vodafone Group Plc. (United Kingdom)
,
Wavecontrol
|
Q3/5
|
2019-04-29 |
|
[ 485 ]
|
Contribution on materials content in mobile phones for ITU-T L.ER Guidelines and Certification schemes for e-Waste Recyclers
|
Orange (France)
|
Q7/5
|
2019-04-29 |
|
[ 484 ]
(Rev.1) |
L.1310: Proposal of draft Revision of Recommendation L.1310
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-29 |
|
[ 483 ]
|
Orange contribution on implementation of Circular Economy related questions in network equipment acquisition process
|
Orange (France)
|
Q7/5
|
2019-04-29 |
|
[ 482 ]
|
SAR assessment of the wireless radiocommunication devices operating close to the human body. A.1 justification
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 481 ]
(Rev.1) |
Proposed new work item on ITU-T L.CE_2 "Identifying Design Guidelines for Meeting the Circular Economy Principles " A.1 justification
|
Argentina
,
Côte d'Ivoire
,
Huawei Technologies Co., Ltd. (China)
,
Kenya
,
Orange (France)
,
Spain
,
Tanzania
,
Uganda
|
Q7/5
|
2019-04-29 |
|
[ 480 ]
(Rev.1) |
Proposed new work item on ITU-T L.CE_2 "Identifying Design Guidelines for Meeting the Circular Economy Principles"
|
Argentina
,
Côte d'Ivoire
,
Huawei Technologies Co., Ltd. (China)
,
Kenya
,
Orange (France)
,
Spain
,
Tanzania
,
Uganda
|
Q7/5
|
2019-04-29 |
|
[ 479 ]
|
Case studies of RF-EMF assessments - exposure levels taken in different conditions and areas
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 478 ]
(Rev.1) |
Comparison of measurements of the exposure levels in countries with different exposure limits
|
Orange (France)
,
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 477 ]
|
SAR assessment of the wireless radiocommunication devices operating close to the human body
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 476 ]
(Rev.1) |
K.90 "Evaluation techniques and working procedures for compliance with exposure limits of network operator personnel to power-frequency electromagnetic fields": New version of the Appendix II: software EMFACDC
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 475 ]
(Rev.1) |
Revised recommendation K.116 (Electromagnetic compatibility requirements and test methods for radio telecommunication terminal equipment) for consent
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q4/5
|
2019-04-29 |
|
[ 474 ]
|
New work item proposal on general principles for the green supply chain management of ICT manufacturing industry.
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q7/5
|
2019-04-29 |
|
[ 473 ]
|
Second draft of Recommendation ITU-T L.SE_BS "Smart energy solution for telecom base stations"
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2019-04-29 |
|
[ 472 ]
(Rev.1) |
Proposal on power supply system architecture for ITU-T L. 5G_powering "Sustainable power feeding solutions for 5G network "
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2019-04-29 |
|
[ 471 ]
|
First draft of Recommendation ITU-T L.DCIM " Specifications of Data Center Infrastructure Management (DCIM) System based on Big Data and AI Technology"
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2019-04-29 |
|
[ 470 ]
|
The second draft of K.sod "Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment"
|
China Unicom
|
Q2/5
|
2019-04-28 |
|
[ 469 ]
(Rev.1) |
Clarification for internal Ethernet cable tests
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 468 ]
(Rev.1) |
Discrepancy in K.20, table 1a
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 467 ]
(Rev.1) |
Alternative for test 2.4 Ethernet mains power contact - 2 of 2
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 466 ]
(Rev.1) |
Test 2.4 Ethernet mains power contact - 1 of 2
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 465 ]
(Rev.1) |
Note 4 in table2b reflects installation practices
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 464 ]
(Rev.1) |
Transverse surge for single pair internal ports
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 463 ]
(Rev.1) |
Capacitor selection for Ethernet transverse surge
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 462 ]
|
Reply to Document SG5-C386 about the terms and definitions
|
Xiamen SET Electronics Co., Ltd (China)
|
Q2/5
|
2019-04-26 |
|
[ 461 ]
(Rev.1) |
Second draft of K.77 Characteristics of metal oxide varistors for the protection of telecommunication installations
|
Xiamen SET Electronics Co., Ltd (China)
|
Q2/5
|
2019-04-26 |
|
[ 460 ]
(Rev.1-2) |
Recommendation ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"
|
Orange (France)
,
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)
|
Q6/5
|
2019-04-26 |
|
[ 459 ]
(Rev.1) |
First draft of Passive intermodulation test methods of array antenna systems in mobile communication systems (K.pim)
|
China Mobile Communications Corporation
|
Q4/5
|
2019-04-26 |
|
[ 458 ]
(Rev.1-3) |
L.5G_powering: Huawei proposal on Sustainable power feeding solutions for 5G network
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 457 ]
(Rev.1-2) |
L.5G_powering: Proposal addition to Sustainable power feeding solutions for 5G network
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 456 ]
(Rev.1) |
L.DCIM: Data Center Infrastructure Management system evolution
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 455 ]
(Rev.1) |
The coupling network proposal of the Ethernet transverse lightning test in ITU-T K.44
|
Huawei Technologies Co., Ltd. (China)
|
Q2/5
|
2019-04-26 |
|
[ 454 ]
(Rev.1) |
L.DCIM: Data Center Infrastructure Management system cooling control
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 453 ]
|
Proposal to add a clause to demonstrate the protection measure for antenna system against lightning in different installation scenarios in ITU-T K.112.
|
Huawei Technologies Co., Ltd. (China)
|
Q1/5
|
2019-04-26 |
Resultados :902 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):