International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 465 ]  
 
Working document towards a preliminary draft new Recommendation on statistical methodologies to estimate the interference into fixed service (FS) stations operating in the 27.5-29.5 GHz frequency band from land earth stations in motion (L-ESIMS) communicating with FSS geostationary space stations     United States of America   AI1.5   2017-10-10
[ 464 ]  
 
Working document [towards a preliminary draft new Report] on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9     United States of America   AI9.1   2017-10-10
[ 463 ]  
 
Working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz     United States of America   AI1.5   2017-10-10
[ 462 ]  
 
Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz     United States of America   AI1.5   2017-10-10
[ 461 ]  
 
Input on working document - Issue F: Concerns with the lack of implementation of certain provisions of the Radio Regulations that can lead to difficulties during the process of entering an assignment into the RR Appendix 30B list     United States of America   AI7   2017-10-10
[ 460 ]  
 
Proposed revisions to the Work Plan     United States of America   AI1.6   2017-10-10
[ 459 ]  
 
Revisions to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands     United States of America   AI7   2017-10-10
[ 458 ]  
 
Preliminary draft new [Recommendation/Report] ITU-R S.[GUIDELINES_14.5-14.8 GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting- .....     United States of America     2017-10-10
[ 457 ]  
 
Working document towards a PDN Report on sharing between ESIM and stations in the mobile service (WRC-19 agenda item 1.5)     United States of America   AI1.5   2017-10-10
[ 456 ]  
 
Draft reply liaison statement to TG 5/1 questions     United States of America     2017-10-10
[ 455 ]  
 
Modification to working document towards a preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands WRC-19 agenda item 9.1, issue 9.1.9     China (People's Republic of)   AI9.1   2017-10-10
[ 454 ]  
 
Proposal for the draft CPM Report on WRC-19 agenda item 9.1, issue 9.1.9     China (People's Republic of)   AI9.1   2017-10-10
[ 453 ]  
 
Preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Issues for which consensus was readily achieved in ITU-R     China (People's Republic of)   AI7   2017-10-10
[ 452 ]  
 
Proposal for the draft CPM Report on WRC-19 agenda item 9.1, issue 9.1.3     China (People's Republic of)   AI9.1   2017-10-10
[ 451 ]  
 
Views and proposals on the studies of the agenda item 9.1 issue 9.1.2     China (People's Republic of)     2017-10-10
[ 450 ]  
 
WRC-19 agenda item 1.5 - Case study on FS and ESIM coexistence     Senegal (Republic of)   AI1.5   2017-10-09
[ 449 ]  
 
Assessment of the interference in EESS (passive) in the band 52.6-54.25 GHz produced by feeder links of GSO FSS networks that may operate in the band 51.4-52.4 GHz     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI9   2017-10-09
[ 448 ]  
 
Assessment of the interference in EESS (passive) in the band 50.2-50.4 GHz produced by feeder links of FSS NGSO constellations in adjacent band     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI9   2017-10-09
[ 447 ]  
 
Proposed liaison statement to ITU-R Task Group 5/1 and Working Parties 5A and 5C on the FSS/BSS protection criteria for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16     EMEA Satellite Operators Association (ESOA)   AI1.16, AI1.14, AI1.13   2017-10-09
[ 446 ]  
 
FSS protection criteria for sharing studies under WRC-19 agenda item 1.13     Russian Federation   AI1.13   2017-10-09
[ 445 ]  
 
Working document towards proposals to the methodology for determining whether interference to a satellite network operating in the 50/40 GHz FSS frequency bands meets the requirements of maximum permissible levels of interference     Russian Federation     2017-10-09
[ 444 ]  
 
Proposals for a draft new Resolution [AI 1.5/ESIM] (WRC-19)     Russian Federation   AI1.5   2017-10-09
[ 443 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation to WD towards PDNRep ITU-R BO.[AP30.ANNEX7]     Russian Federation   AI1.4   2017-10-09
[ 442 ]  
 
Estimation of the protection level of the earth station with antenna smaller than 60 cm provided by the presence of forbidden arc portions     Russian Federation   AI1.4   2017-10-09
[ 441 ]  
 
Proposals on WRC-19 agenda item 1.4 in relation to preliminary draft CPM text     Russian Federation   AI1.4   2017-10-09
[ 440 ]  
 
Validation of the minimum emission parameters contained within submissions of FSS satellite networks not subject to a plan     Canada , United Kingdom of Great Britain and Northern Ireland     2017-10-09
[ 439 ]  
 
Annex 37 to Working Party 4A Chairman's Report - Preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13     United Kingdom of Great Britain and Northern Ireland   AI7   2017-10-09
[ 438 ]  
 
Regulatory provisions for the modification of notices relative to non-geostationary systems operating in the FSS, MSS and BSS above 10 GHz subject to Section II of Article 9 of the Radio Regulations     United Kingdom of Great Britain and Northern Ireland   AI7   2017-10-09
[ 437 ]  
 
Proposed revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-10-09
[ 436 ]  
 
Principles and a proposed methodology for issue a of WRC-19 - Agenda item 7     United Kingdom of Great Britain and Northern Ireland   AI7   2017-10-09
[ 435 ]  
 
Proposed draft Resolution to address WRC-19 agenda item 1.5     Austria , France , Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway , Switzerland (Confederation of) , United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-10-09
[ 434 ]  
 
Draft revision to Recommendation ITU-R S.1503: Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations     United Kingdom of Great Britain and Northern Ireland     2017-10-09
[ 433 ]  
 
Fixed and broadcasting satellite service sharing criteria for WRC-19 agenda item 1.13     United Kingdom of Great Britain and Northern Ireland   AI1.13   2017-10-09
[ 432 ]  
 
Working document towards a draft new Report on small BSS antenna patterns     Bulgaria (Republic of)     2017-10-09
[ 431 ]  
 
Proposal for revision of the working document towards preliminary draft CPM text for WRC-19 agenda item 7, issue G     Bulgaria (Republic of)   AI7   2017-10-09
[ 430 ]  
 
Working document towards draft CPM text on WRC-19 agenda item 7, new issue Y     Iran (Islamic Republic of)   AI7   2017-10-09
[ 429 ]  
 
Working document towards draft CPM text on WRC-19 agenda item 7, new issue X     Iran (Islamic Republic of)   AI7   2017-10-09
[ 428 ]  
 
Preliminary draft CPM text for WRC-19 agenda item 7 - Issue E     Iran (Islamic Republic of)   AI7   2017-10-09
[ 427 ]  
 
Working document towards draft CPM text on agenda item 7, issue C3     Iran (Islamic Republic of)   AI7   2017-10-09
[ 426 ]  
 
Working document towards draft CPM text on WRC-19 agenda item 7, issue C2     Iran (Islamic Republic of)   AI7   2017-10-09
[ 425 ]  
 
Working document towards draft CPM text on WRC-19 agenda item 7, issue C1     Iran (Islamic Republic of)   AI7   2017-10-09
[ 424 ]  
 
Proposed amendments to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3     Indonesia (Republic of)   AI9.1   2017-10-09
[ 423 ]  
 
Proposed amendments to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIO] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands     Indonesia (Republic of)     2017-10-09
[ 422 ]  
 
Guidance and updates to the FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16     United Arab Emirates   AI1.16, AI1.14, AI1.13   2017-10-09
[ 421 ]  
 
Proposed new issue X under WRC-19 agenda item 7 - Difficulties for Part B examinations under & 6.21 C) of RR Appendix 30B     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)   AI7   2017-10-09
[ 420 ]  
 
Proposed modification to preliminary draft CPM text for WRC-19 agenda item 7 issue C6     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)   AI7   2017-10-09
[ 419 ]  
 
Preliminary draft revision of Recommendation ITU-R S.1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary -satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations (Draft)     Canada     2017-10-06
[ 418 ]  
 
Observations on procedural issues related to the application of a possible revision to Recommendation ITU-R S.1503-2     Canada   AI7   2017-10-06
[ 417 ]  
 
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S. [NGSO_FSS_BIU]     Canada   AI7   2017-10-06
[ 416 ]  
 
Comments and proposals relating to Issue C3 under agenda item 7     Canada   AI7   2017-10-06
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18