International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-7C  C 

ITU-R WP-7C

Remote Sensing Systems

Results:531 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 81 ]  
 
Review of typical technical and operational characteristics of Earth exploration satellite service (passive) systems contained in the preliminary draft revision of Recommendation ITU-R RS.1861     United States of America     2020-09-18
[ 80 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Party 3M, 4B, 4C, 5A, 5B, 5C, and 7B) - WRC-23 agenda item 1.16     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.16   2020-09-18
[ 79 ]  
 
Revisions to working document towards a preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors [IN THE 18.6-18.8 GHZ] [CAUSED BY SURFACE WATER REFLECTIONS]     European Space Agency     2020-09-18
[ 78 ]  
(Rev.1) 
Working document towards a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS] - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range     Switzerland (Confederation of) , France     2020-09-18
[ 77 ]  
 
Elements related to WRC-23 agenda item 1.14     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.14   2020-09-18
[ 76 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-23     Chairman, CPM-23     2020-09-18
[ 75 ]  
 
Working document towards a preliminary draft new Report ITU-R RS.[GLOBAL_SURVEY_SMAP_RFI] - Global survey of radio frequency interference observed by the SMAP radar in the 1 215-1 300 MHz band and the SMAP radiometer in the 1 400-1 427 MHz band     United States of America     2020-09-14
[ 74 ]  
 
Working document towards a preliminary draft revised Report ITU-R RS.2455-1     United States of America   AI1.12   2020-09-14
[ 73 ]  
 
Draft reply liaison statement to Working Party 1A - Interference from broadcasting satellite receiving equipment into EESS (passive) remote sensors     United States of America     2020-09-14
[ 72 ]  
 
Working document towards a preliminary draft new Report ITU-R RS.[GLOBAL_SURVEY_AQ_RFI] - Global survey of radio frequency interference observed by the Aquarius scatterometer in the 1 215-1 300 MHz band and the Aquarius radiometer in the 1 400-1 427 MHz band     United States of America     2020-09-14
[ 71 ]  
 
Proposed liaison statement to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5C, 6A and 7D - Work to be conducted by Working Party 7C under agenda item 9.1, topic a)     United States of America   AI9.1A)   2020-09-14
[ 70 ]  
 
Working document towards preliminary draft new Report ITU-R RS.[SW_INTERF_CRITERIA] - Interference criteria of receive only space weather sensors     United States of America     2020-09-14
[ 69 ]  
 
Preliminary draft revised Report ITU-R RS.2456 - Space weather sensor systems using radio spectrum     United States of America   AI9.1   2020-09-14
[ 68 ]  
 
Working document towards a preliminary draft new Report ITU-R RS.[SPEC_REQTS_RX_SPACE_WEATHER] - Spectrum requirements and applicable radio service designations for receive only space weather sensors that provide data critical for predictions and warnings     United States of America     2020-09-14
[ 67 ]  
 
Proposed work plan for WRC-23 agenda item 9.1, topic a)     United States of America   AI9.1A)   2020-09-14
[ 66 ]  
 
Revision to preliminary draft new Report ITU-R RS.[EESS_SAR-RNSS]     United States of America     2020-09-14
[ 65 ]  
 
Elements related to WRC-23 agenda item 1.14 - Studies related to possible EESS (passive) allocations in the frequency range 231.5-252 GHz     United States of America   AI1.14   2020-09-14
[ 64 ]  
 
Preliminary draft revision of Report ITU-R RS.2068-1 - Current and future use of the band 13.25 GHz by spaceborne active sensors     United States of America     2020-09-14
[ 63 ]  
 
Proposal of draft reply liaison statement to Working Party 5D regarding agenda item 1.4     Brazil (Federative Republic of)   AI1.4   2020-09-14
[ 62 ]  
 
Proposed liaison statement to Working Party 5D on the studies related to RR No. 21.5 regarding AAS     France     2020-09-11
[ 61 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18     WP 4C   AI1.18   2020-09-07
[ 60 ]  
 
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.17     WP 4A   AI1.17   2020-09-07
[ 59 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.16     WP 4A   AI1.16   2020-09-07
[ 58 ]  
 
Consideration on possible elements for a draft new Question ITU-R XX/1 - Protection of EESS (passive) remote sensors against interference caused by radiation from broadcasting-satellite receiving equipment     Japan     2020-09-07
[ 57 ]  
 
Information on outline and basic concept of sharing and compatibility studies between FOD and Active/Passive Sensors conducted in Japan     Japan     2020-09-07
[ 56 ]  
 
Proposed liaison statement to Working Party 4A regarding WRC-23 agenda item 9.1, topic d) - Request for clarification on the relevant non-GSO FSS technical characteristics concerning the protection of EESS (passive) in the frequency band 36-37 GHZ     Japan   AI9.1D)   2020-09-07
[ 55 ]  
 
Proposals to Working Party 7C participating WRC-23 action items     Russian Federation     2020-09-03
[ 54 ]  
 
Interaction between Working Party 7C and Working Party 4A on the issue of study on compatibility between EESS (passive) systems operating in the 10.6-10.7 GHz and FSS systems operating in the frequency band 10.7-10.95 GHz     Russian Federation     2020-09-03
[ 53 ]  
 
Initial reply liaison statement to Working Party 5D (copied for information to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda items 1.1 and 1.2     WPs 3K and 3M   AI1.2, AI1.1   2020-08-28
[ 52 ]  
 
Initial reply liaison statement to Working Party 7B (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.13     WP 3M   AI1.13   2020-08-28
[ 51 ]  
 
Reply liaison to Working Party 7C - Earth surface bistatic scattering coefficient prediction     WP 3J     2020-08-26
[ 50 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.10     WPs 3K and 3M   AI1.10   2020-08-25
[ 49 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 5A, 5C and 7D for information) - Updates to working documents towards a preliminary draft new Reports ITU-R M.[FOD 92-100 GHz] and ITU-R M.[FOD-EESS-SHARE]     WP 5B     2020-08-25
[ 48 ]  
 
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4     WPs 3J, 3K and 3M   AI1.4   2020-08-27
[ 47 ]  
 
Reply liaison statement to Working Party 7C (copied for information to Working Parties 3J, 3M, 4A, 4C, 5A, 5B) - WRC-23 agenda item 1.14 - System technical and operational characteristic in the frequency band 231.5-252 GHz     WP 5C   AI1.14   2020-08-07
[ 46 ]  
 
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4     WP 5C   AI1.4   2020-08-07
[ 45 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2     WP 5C   AI1.2   2020-09-08
[ 44 ]  
 
Reply liaison statement to Working Party 7C (copied for information to Working Parties 4A, 4C, 5B and 5C) - Technical and operational characteristics in the frequency band 231.5-252 GHz     WP 5A   AI1.14   2020-08-07
[ 43 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz     WP 5C     2020-08-06
[ 42 ]  
 
Liaison statement to Working Parties 7C (copied to Working Parties 5C and 6A for information) - Preparations for studies under WRC-23 agenda item 1.12     WP 5A   AI1.12   2020-08-06
[ 41 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy for information to Working Party 5C) - Working document towards a preliminary draft new Report ITU-R M.[100-GHZ.RSTT.EESS.COEXIST]     WP 5A     2020-08-06
[ 40 ]  
 
Reply liaison statement to Working Party 4C (copied for information to Working Parties 4A, 4B, 5A, 5B, 5D, 7B, 7C and 3M) - WRC-23 agenda item 1.18     WP 5C   AI1.18   2020-08-06
[ 39 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3M, 5A, 7C and 7D for information) - WRC-23 agenda item 1.13     WP 5C   AI1.13   2020-08-06
[ 38 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 7B and 7C) - WRC-23 agenda item 1.17     WP 5C   AI1.17   2020-08-06
[ 37 ]  
 
Reply liaison statement to Working Party 7C (copied for information to Working Parties 5A and 6A) - WRC-23 agenda item 1.12     WP 5C   AI1.12   2020-08-06
[ 36 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.16     WP 5B   AI1.16   2020-08-06
[ 35 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5C, 7C and 7D - WRC-23 agenda item 1.10 - New allocations to the aeronautical mobile service for the use of non-safety applications     WP 5B   AI1.10   2020-08-06
[ 34 ]  
 
Liaison reply to Working Party 4A (copy to Working Parties 4C, 7B and 7C) - Re: Intention to develop a Small Satellite Handbook     WP 5A     2020-08-06
[ 33 ]  
 
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz     WP 5A     2020-08-06
[ 32 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 3M, 5B, 5C, 7C and 7D for information) - Preparations for studies under WRC-23 agenda item 1.13     WP 5A   AI1.13   2020-08-05
Results:531 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-29