International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 70 ]  
 
Different kinds of environmental impacts assessments in the field of ICT, proposal to focus on some of them     France Telecom Orange   Q18/5   2009-10-02
[ 69 ]  
 
Brazil Experience With EMF Measurements, Monitoring and Enforcement     ANATEL, Brazil   Q3/5   2009-10-01
[ 68 ]  
 
Proposal of averaging time reduction for evaluation of human exposure     Republic of Korea   Q3/5   2009-10-01
[ 67 ]  
 
Reference for optical cable usage with metallic parts related to K.25     Republic of Korea   Q5/5   2009-10-01
[ 66 ]  
 
Introduction of "Integrated I/O connection interface for mobile device" standard     Republic of Korea   Q21/5   2009-10-01
[ 65 ]  
 
Proposal for a work item on a method for providing recycling information about the rare metals in ICT products     Republic of Korea   Q21/5   2009-10-01
[ 64 ]  
 
Proposal for development of establishment guidance for green data centers     Republic of Korea   Q19/5   2009-10-01
[ 63 ]  
 
Development of a GHG accounting methodology for ICT projects     Republic of Korea   Q18/5   2009-10-01
[ 62 ]  
 
Development of an ICT environmental labelling standard     Republic of Korea   Q18/5   2009-10-01
[ 61 ]  
 
Development of an ICT-product carbon footprinting methodology     Republic of Korea   Q18/5   2009-10-01
[ 60 ]  
 
The result of ITU Virtual International Symposium on ICTs and Climate Change     Republic of Korea   Q17/5   2009-10-01
[ 59 ]  
 
Proposal for a work item on ICT GHG Inventory System     Republic of Korea   Q18/5   2009-10-01
[ 58 ]  
 
Importance of impact assessment of ICT technologies influencing other sectors     ETRI   Q18/5   2009-10-01
[ 57 ]  
 
Collaboration with ISO TC207 for ICT&CC standardization     ETRI   Q17/5   2009-10-01
[ 56 ]  
 
Collaboration with ISO/IEC JTC 1 for ICT&CC standardization     ETRI   Q17/5   2009-10-01
[ 55 ]  
 
Collaboration with ISO/IEC JTC 1 Study Group on Energy Efficiency of Data Centers     ETRI   Q19/5   2009-10-01
[ 54 ]  
 
Proposal for standardization of Utility Computing services as an energy efficient ICT infrastructure service mechanism     ETRI   Q17/5   2009-10-01
[ 53 ]  
 
A work item proposal for eco-management guidance of ICT equipment for customers     ETRI   Q18/5   2009-10-01
[ 52 ]  
 
Proposal of evaluation method for reduction of environmental loads by improved work efficiency     Japan   Q18/5   2009-10-01
[ 51 ]  
 
Proposed Draft Recommendation of L.methodology     Japan   Q18/5   2009-10-01
[ 50 ]  
 
Proposed Scope and Study Items for Draft Recommendation of L.methodology     Japan   Q18/5   2009-10-01
[ 49 ]  
 
Proposed Definitions of Terminologies related to ICT and climate change     Japan   Q14/5   2009-10-01
[ 48 ]  
 
Proposal on drafting the key technical points of L.adapter     China   Q21/5   2009-10-01
[ 47 ]  
 
Deficiencies in GDT specifications that hinder coordination design     IEEE   Q4/5, Q13/5   2009-10-01
[ 46 ]  
 
Modelling GDT sparkover     IEEE   Q4/5, Q13/5   2009-10-01
[ 45 ]  
 
EMF exposure assessment - special cases     Telekomunikacja Polska, Poland   Q2/5   2009-10-01
[ 44 ]  
 
Co-location, unbundling and interoperability in telecommunication networks     ARPTC   Q1/5   2009-10-01
[ 43 ]  
 
North American wiring simulators     IEEE   Q4/5, Q13/5   2009-09-25
[ 42 ]  
 
Time variation of electromagnetic field strength radiated from IMT-2000 base station antenna     NTT DoCoMo Inc. , NICT   Q3/5   2009-09-17
[ 41 ]  
 
Equipment testing and evaluating methods for the QOE of broadband customer premises equipments within Multi-interference factors     China Telecoms Corp.   Q8/5, Q12/5   2009-09-10
[ 40 ]  
 
Test methods for Resistibility of xDSL modem related to lightning protection     China Telecoms Corp.   Q4/5   2009-09-10
[ 39 ]  
 
Comments and suggestions for an automatic long term EMF measurement system     Swisscom Ltd.   Q3/5   2009-05-19
[ 38 ]  
 
Draft Revision of Rec. K.30rev/K.ocp     Bourns Inc.   Q13/5   2009-05-19
[ 37 ]  
 
Proposed new question and their related Study Groups on 'Energy Saving Requirements for ICTs over the lifecycle'     BT , FT , Telecom Italia   QALL/5   2009-05-15
[ 36 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG abatement in buildings'     BT   QALL/5   2009-05-15
[ 35 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG reduction by travel substitution'     BT   QALL/5   2009-05-15
[ 34 ]  
 
Proposed new question and related Study Groups on 'Technologies for Carbon Labelling over the Lifecycle"     BT , NSN Germany   QALL/5   2009-05-15
[ 33 ]  
 
Determination of Relevant Measurement Points     ANATEL, Brazil   Q3/5   2009-05-15
[ 32 ]  
 
Inputs from Brazil to K.Guide     ANATEL, Brazil   Q3/5   2009-05-15
[ 31 ]  
 
Working document toward draft new Recommendation K.guide     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 30 ]  
 
Editorial errors in ITU-T Recommendation K.52     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 29 ]  
 
Comparison between measurement and calculations of the EMF     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 28 ]  
 
A proposal on the structure of a new WP for climate change issues     Republic of Korea   QALL/5   2009-05-14
[ 27 ]  
 
Field experiments to confirm the error rate by deviated potential probe positioning in the fall-of-potential earth resistance measurement method     Republic of Korea   Q6/5   2009-05-14
[ 26 ]  
 
Test results on conductive coupling effects when measure induced voltage on telecommunication line near a.c. traction line with AT feeding system in Korea     KT, Korea   Q9/5   2009-05-14
[ 25 ]  
 
Proposal of measurement time reduction for exposure assessment     Republic of Korea   Q3/5   2009-05-14
[ 24 ]  
 
Proposed new questions and their related Study Groups on ICT and Climate Change     NTT , BT , FT , Fujitsu   QALL/5   2009-05-14
[ 23 ]  
 
Proposed test condition for PTN immunity test     ZTE Corporation   Q12/5   2009-05-14
[ 22 ]  
 
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas     China Mobile Communications Corp.   Q3/5   2009-05-14
[ 21 ]  
 
Conducted electromagnetic environment research in home networking     MIIT, China   Q8/5   2009-05-14
Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-02-04