Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1A  C 

UIT-R WP1A

Técnicas de Ingeniería

Resultados :466 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 16 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 7D   Q210/1   2016-04-13
[ 15 ]  
 
Working document on the work plan and milestones for the ITU-R studies on WRC-19 agenda item 1.15     Chairman, WP 1A   AI1.15   2016-04-13
[ 14 ]  
 
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)     WP 7D     2016-04-11
[ 13 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7     WP 7B   AI1.7   2016-04-07
[ 12 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 11 ]  
 
Liaison statement to Working Party 1A on new Report ITU-R SM.2352-0 - Copy for information to Working Parties 5A, 5C, 7C and 7D - Technology trends of active services in the band above 275 GHz     Institute of Electrical and Electronics Engineers, Inc.     2016-03-21
[ 10 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 9 ]  
 
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans     ITU-T SG 15     2016-03-08
[ 8 ]  
 
Liaison statement on the latest versions of the Home Network Transport (HNT) - Standards overview and workplan     ITU-T SG 15     2016-03-08
[ 7 ]  
 
Liaison statement on the latest versions of the Access Network Transport (ANT) - Standards overview and workplan     ITU-T SG 15     2016-03-08
[ 6 ]  
 
Liaison statement - Information on current status of Study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group     Asia-Pacific Telecommunity     2016-02-19
[ 5 ]  
 
Liaison statement on request to consider the hearing aids issue on Wireless Power Transmission (WPT) work     ITU-T JCA-AHF     2016-02-12
[ 4 ]  
 
Spectra of wireless power transfer base stations     Germany (Federal Republic of)     2016-01-19
[ 3 ]  
 
Liaison statement evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     ITU-T SG 5     2015-12-08
[ 2 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T SG 5     2015-12-08
[ 1 ]  
 
Documents to be carried over from the 2012-2015 study period     WP 1A     2015-12-08
Resultados :466 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2020-12-15