Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5C : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5C  C 

UIT-R WP5C

Sistemas fijos inalámbricos; sistemas por ondas decamétricas y otros sistemas por debajo de 30 MHz en los servicios fijo y móvil terrestre

Resultados :665 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 215 ]  
 
Liaison statement to Working Parties 1A and 1B, and to their Rapporteur Group on WPT issues, to Working Party 5B, and to the Study Group 1 Rapporteur Group on liaison with CISPR and Rapporteur to CISPR on WPT issues (copy for information to Working Parties 5A, 5C, 7A & 7D) - Liaison between ITU-R and CISPR     WP 6A     2017-04-03
[ 214 ]  
 
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19     WP 6A   Q210/1   2017-04-03
[ 213 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4     WP 3M     2017-03-31
[ 212 ]  
 
Liaison statement to Working Party 5C (Copy for information to Working Party 1A) - Revision of Recommendation ITU-R P.620     WP 3M     2017-03-31
[ 211 ]  
 
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13     WPs 3K, 3J & 3M   AI1.13   2017-04-03
[ 210 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Request for input related to WRC-19 agenda item 1.15     WPs 3J, 3K and 3M   AI1.15   2017-03-31
[ 209 ]  
 
Preliminary position on WRC-19 agenda     World Meteorological Organization     2017-03-20
[ 208 ]  
 
Reply liaison statement to ITU-T Study Group 5 on seeking collaboration on draft Recommendation "Energy efficiency metrics and measurement methodology for 5G solutions" (copy to Working Parties 4A, 4C, 5A and 5C)     WP 5D     2017-02-28
[ 207 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B and 5C - Technical and operational parameters and deployment characteristics for IMT-2020 for use in sharing studies under WRC-19 agenda items     WP 5D     2017-02-28
[ 206 ]  
 
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5A and 5C) - Regulatory tools to support enhanced shared use of the spectrum     WP 5D     2017-02-27
[ 205 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 5A, 5C) - Technical characteristics for WRC-19 agenda item 1.3     WP 5D   AI1.3   2017-02-27
[ 204 ]  
 
Liaison statement to ITU-R Coordination Committee for Vocabulary (CCV) and ITU-T Standardization Committee for Vocabulary (SCV) on broadband definition (copy to ITU-D Study Group 1 Question 2/1, ITU-R Working Parties 4A, 4B, 4C, 5A, 5C and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?     WP 5D     2017-02-24
[ 203 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...     WP 5D     2017-02-24
[ 202 ]  
 
Liaison on new project on Transport for 5G Mobile Networks     Director, BR     2017-01-31
[ 201 ]  
 
Liaison statement to ITU-D Study Group 1 Question 2/1 on broadband definition (copy to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D and 6A for information) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?     CCV and SCV     2017-01-30
[ 200 ]  
 
Liaison statement to Working Party 5C - Information concerning WRC-19 agenda item 1.14     WP 5B   AI1.14   2016-12-16
[ 199 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 5A and 5C) - Update on the preliminary draft new Recommendation ITU-R M.[AMS-CHAR 24]     WP 5B     2016-12-16
[ 198 ]  
 
Liaison statement to Working Party 5A (copied to Working Party 5C) - Proposed revision to Recommendation ITU-R M.2057-0 - Systems characteristics of automotive radars operating in the frequency band 76-81 GHz for intelligent transport systems applications     WP 5B     2016-12-16
[ 197 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 196 ]  
 
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information)     WP 1B     2016-12-14
[ 195 ]  
 
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)"     WP 1B   Q210/1   2016-12-14
[ 194 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT)     WP 1A   Q210/1   2016-12-13
[ 193 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT)     WP 1A   Q210/1   2016-12-13
[ 192 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than Radio Frequency Beam     WP 1A   Q210/1   2016-12-13
[ 191 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-12-13
[ 190 ]  
 
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1)     WP 1A   Q236/1, Q221/1   2016-12-13
[ 189 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)     WP 1A     2016-12-13
[ 188 ]  
 
This document has been withdrawn     BR Study Groups Department     2016-12-13
[ 187 ]  
 
Reply liaison statement to Working Parties 3M and 3J (copied for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4     WP 1A     2016-12-13
[ 186 ]  
 
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5B     2016-11-28
[ 185 ]  
 
Recommendation ITU-R P.681-9 - Propagation data required for the design of Earth-space land mobile telecommunication systems     SG 3     2016-11-24
[ 184 ]  
 
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13     WP 5A   AI1.13   2016-11-23
[ 183 ]  
 
Liaison statement to Working Party 5C - WRC-19 agenda item 1.14     WP 5A   AI1.14   2016-11-23
[ 182 ]  
 
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range     WP 5A     2016-11-23
[ 181 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5A     2016-11-23
[ 180 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5C, 5D and 7D for information) - Operational requirements and technical characteristics of systems in the frequency band 51.4-52.4 GHz     WP 5A     2016-11-23
[ 179 ]  
 
Liaison statement to Working Party 5C - ITU-R Resolution 155 (WRC-15) implementation     WP 5B     2016-11-18
[ 178 ]  
 
Reply liaison statement to Working Party 1A copied to Working Parties 1A, 3J, 3M, 4A, 4C 5A, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 5B     2016-11-18
[ 177 ]  
 
Reply liaison statement to ITU-D Study Group 2 (copy to Working Parties 1B, 1C, 3L, 4A, 5A, 5C, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields     WP 5B     2016-11-18
[ 176 ]  
 
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15     WP 5A   AI1.15   2016-11-18
[ 175 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information to Working Parties 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use     WP 5A     2016-11-18
[ 174 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15     WP 5A   AI1.15   2016-11-18
[ 173 ]  
+Ann.1-22 
Report on the meeting of Working Party 5C (Geneva, 7-16 November 2016)     Chairman, WP 5C     2016-11-16
[ 172 ]  
 
Final list of participants - Working Party 5C (Geneva, 7-16 November 2016)     Director, BR     2016-11-16
[ 171 ]  
 
Reply liaison statement to Working Party 5C copied to WP 1A AND WP 1B for information     WP 5B     2016-11-11
[ 170 ]  
 
List of documents issued (Documents 5C/57 - 5C/170)     BR Study Groups Department     2016-11-04
[ 169 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) WRC-19 agenda item 1.1     WP 6A   AI1.1   2016-11-04
[ 168 ]  
 
Liaison statement to Working Parties 5A and 5C - Information on tuning ranges, technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting     WP 6A     2016-11-04
[ 167 ]  
 
This document has been withdrawn     WP 6A     2016-11-04
[ 166 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 4A     2016-11-02
Resultados :665 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-10-18