Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 452 ]
|
EMF in the vicinity of the metallic fences.
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-26 |
|
[ 451 ]
|
Overestimation of the exposure level in vicinity of Radio Base Stations.
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-26 |
|
[ 450 ]
(Rev.1) |
L.1000 rev, Proposal for revision of recommendation L.1000
|
Huawei Technologies Co., Ltd. (China)
|
Q7/5
|
2019-04-26 |
|
[ 449 ]
|
Proposed new work item on draft Recommendation ITU-T K.PLC.EMC "Electromagnetic compatibility requirements and measurement methods for outdoor equipment using power line communication technology"
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2019-04-26 |
|
[ 448 ]
(Rev.1) |
Region efforts towards sustainable e-waste management in the East African Region
|
Agence de Régulation et de Contrôle des Télécommunications (ARCT) (Burundi)
,
Communications Authority of Kenya (CA)
,
Kenya
,
Rwanda Utilities Regulatory Authority (RURA)
,
Tanzania Communications Regulatory Authority (TCRA)
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2019-04-26 |
|
[ 447 ]
(Rev.1) |
K.Sup.access_trunk_networks to-ITU-T-K.45 on "Rationale for setting resistibility requirements of telecommunication equipment installed in the access and trunk networks against lightning": 1st draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 446 ]
(Rev.1) |
K.Sup.telecom_centre to-ITU-T-K.20 on "Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning": 1st draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 445 ]
(Rev.1) |
K.Sup.customer to-ITU-T-K.21 on "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning": 1st draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 444 ]
|
K.spdsafe: fifth draft of "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 443 ]
|
Manhole-type base station (update of Appendix IX in K.91)
|
National Institute of Information and Communications Technology (NICT) (Japan)
,
NTT DOCOMO, INC. (Japan)
|
Q3/5
|
2019-04-26 |
|
[ 442 ]
|
Notes for applying IEC 61000-4-5 Ed.3
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q4/5
|
2019-04-26 |
|
[ 441 ]
|
L.CE_Concepts on "Circular Economy; Definitions and concepts for material efficiency for ICT": Proposed new baseline text
|
Egypt
,
Huawei Technologies Co., Ltd. (China)
|
Q7/5
|
2019-04-25 |
|
[ 440 ]
|
The 5th draft of K.vss "Lightning protection and Earthing of Video Surveillance System"
|
China Telecommunications Corporation
|
Q1/5
|
2019-04-25 |
|
[ 439 ]
|
Withdrawn due to duplication
|
N/A
|
|
2019-04-25 |
|
[ 438 ]
|
Smart Monitoring and Communication Units of low-voltage surge protective devices(SPDs) used in telecommunication systems
|
China Telecommunications Corporation
|
Q2/5
|
2019-04-25 |
|
[ 437 ]
|
New contents of intelligent heat pipe system proposed to add to draft recommendation L.SE_BS
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 436 ]
|
New contents of intelligent heat exchange system proposed to add to draft recommendation L.SE_BS
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 435 ]
(Rev.1) |
New contents of intelligent fresh ventilation system proposed to add to draft recommendation L.SE_BS
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 434 ]
(Rev.1) |
Information of semiconductor devices required for design of telecommunication equipment applying soft error mitigation measures
|
Fujitsu Limited (Japan)
,
Hitachi, Ltd. (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI) (Japan)
|
Q5/5
|
2019-04-25 |
|
[ 433 ]
|
New work item proposal on methodologies for evaluating the functionality and performance of power supply unit configured for servers
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 432 ]
|
Proposed new work item on draft Recommendation ITU-T L.5G_sav-Energy saving technologies and best practices for 5G RAN equipment
|
China Telecommunications Corporation
|
Q6/5
|
2019-04-25 |
|
[ 431 ]
|
5th draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment"
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q4/5
|
2019-04-25 |
|
[ 430 ]
(Rev.1) |
Proposal for the 3rd revised draft of K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q4/5
|
2019-04-24 |
|
[ 429 ]
(Rev.1) |
Proposed a new method for assessing environmental and economic impacts of ICT at sector level by using a CGE model
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q9/5
|
2019-04-23 |
|
[ 428 ]
(Rev.1) |
Reducing the size of ITU-T Recommendation K.44
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-22 |
|
[ 427 ]
(Rev.1) |
Celebrating the life and works of Phillip Havens
|
Bourns Limited (United Kingdom)
|
QALL/5
|
2019-04-22 |
|
[ 426 ]
|
Proposed an updated text of the proposed method for assessing environmental and economic impacts of ICT at sector level by using a CGE model
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q9/5
|
2019-04-17 |
|
[ 425 ]
|
L.CE_Concepts definitions
|
Nokia Corporation (Finland)
|
Q7/5
|
2019-04-16 |
|
[ 424 ]
|
Proposed Terms of Reference for new Focus Group on "Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE)
|
Argentina
,
Brazil
,
China Unicom
,
China
,
Cisco Systems, Inc. (United States)
,
Colombia
,
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)
,
Dominican Rep.
,
Egypt
,
Greece
,
Huawei Technologies Co., Ltd. (China)
,
Italy
,
Kenya
,
Korea (Rep. of)
,
Nokia Corporation (Finland)
,
Orange (France)
,
Rwanda
,
Spain
,
Telecommunication and Postal Regulatory Authority (Sudan)
,
Telefon AB - LM Ericsson (Sweden)
,
Uganda Communications Commission (UCC)
|
QALL/5
|
2019-04-15 |
|
[ 423 ]
|
Increasing Concerns with ever Increasing Deployment of EMF Emission Equipment
|
Public Utilities Regulatory Authority (PURA) (Gambia)
|
Q3/5
|
2019-04-15 |
|
[ 422 ]
(Rev.1) |
Nokia proposals to L.CE_Concepts for Q7/5 e-meeting held on 27 March 2019
|
Nokia Corporation (Finland)
|
Q7/5
|
2019-04-15 |
|
[ 421 ]
(Rev.1) |
Nokia proposals to L.CE_Concepts for Q7/5 e-meeting held on 14 February 2019
|
Nokia Corporation (Finland)
|
Q7/5
|
2019-04-15 |
|
[ 420 ]
(Rev.1) |
Nokia comments on L.CE_Concepts for Q7/5 e-meeting held on 5 December 2018
|
Nokia Corporation (Finland)
|
Q7/5
|
2019-04-15 |
|
[ 419 ]
|
Information and communication technologies for the attainment of the Sustainable Development Goals
|
Ministère des Postes, des Télécommunications et de l'Economie Numérique (Guinea)
|
Q9/5
|
2019-04-08 |
|
[ 418 ]
(Rev.1) |
Waste Electrical and Electronic Equipment Management (WEEE or E-waste) in Benin
|
Benin
|
QALL/5, Q7/5
|
2019-04-08 |
|
[ 417 ]
(Rev.1) |
Completion of the missing information on the capacitor used in tests
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-05 |
|
[ 416 ]
|
ICT for Smart Agriculture
|
Telecommunication and Postal Regulatory Authority (Sudan)
|
Q9/5
|
2019-03-25 |
|
[ 415 ]
|
E-Waste Management
|
Telecommunication and Postal Regulatory Authority (Sudan)
|
Q7/5
|
2019-03-25 |
|
[ 414 ]
|
The impact of ICTs in combating climate change in Comoros
|
Autorité Nationale de Régulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros)
|
Q6/5
|
2019-03-20 |
|
[ 413 ]
|
Findings and recommendations from the study on End of life Management (EoL) management of communications equipment (phase 1)
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2019-03-19 |
|
[ 412 ]
|
Baseline document: Adequate Assessment and Sensitisation on Counterfeit ICT Products and their Environmental Impact (L.Counterfeit)
|
Kenya
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2019-03-19 |
|
[ 411 ]
(Rev.1) |
Madagascar case study for health electromagnetic radiation effects - Integration of ITU and ICNIRP recommendations into the regulatory framework to address legitimate public concerns.
|
Autorité de Régulation des Technologies de Communication (ARTEC) (Madagascar)
|
Q3/5
|
2019-03-12 |
|
[ 410 ]
(Rev.1-2) |
Climate change and assessment of information and communucation technology (ICT) in the framework of the Substainable Development Goals (SDGs)
|
Ministère des Postes, Télécommunications et Nouvelles Technologies de l'Information et de la Communication (Dem. Rep. of the Congo)
|
Q3/5
|
2019-03-05 |
|
[ 409 ]
|
New versions v 8.32 and 8.64 of the software "EMF-estimator"
|
National Institute of Telecommunications (Poland)
,
Orange Polska S.A. (Poland)
|
Q3/5
|
2018-08-30 |
|
[ 408 ]
|
Baseline document L.EW 2020 Guideline on Implementing the E-waste Reduction Target of the Connect2020 Agenda
|
Argentina
,
Egypt
,
Huawei Technologies Co., Ltd. (China)
|
Q7/5
|
2018-08-30 |
|
[ 407 ]
|
Proposed table of content for a proposed new work item on "A methodology for improving, assessing and scoring the sustainability performance of office buildings"
|
MJRD Assessment Inc. (Canada)
|
Q6/5
|
2018-08-30 |
|
[ 406 ]
|
Proposed new work item on draft Recommendation ITU-T L.xxx on A Methodology for improving, assessing and scoring the sustainability performance of office buildings
|
MJRD Assessment Inc. (Canada)
|
Q6/5
|
2018-08-30 |
|
[ 405 ]
|
Proposed baseline text for proposed new draft Recommendation ITU-T K.Workers_safety
|
Wavecontrol, S.L. (Spain)
|
Q3/5
|
2018-08-30 |
|
[ 404 ]
|
Proposed input to draft recommendation L.CEM Criteria for evaluation of the environmental impact of mobile phones by Apple, Huawei and BRS during the interim period May- September 2018
|
Egypt
|
Q7/5
|
2018-08-30 |
|
[ 403 ]
|
BRS's additions to the draft L.EW Connect 2020 during the Interim period May- September 2018
|
Egypt
|
Q7/5
|
2018-08-30 |
Resultados :902 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):