International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:1310 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1260 ]  
 
Proposed way forward on the three open issues in the revision of Recommendation ITU-R M.1036-5     United States of America     2019-07-01
[ 1259 ]  
 
Proposed updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]     United States of America     2019-07-01
[ 1258 ]  
 
Input on Report ITU-R M.[IMT.AAS]     Intel Corporation     2019-07-01
[ 1257 ]  
 
Liaison statement to Working Party 5D - Coexistence and compatibility stydy between the terrestrial component and the satellite component of IMT in the frequency bands 1980-2010 MHZ and 2170-2 200 MHz in different countries     WP 4C     2019-07-02
[ 1256 ]  
 
Liaison statement to Working Party 5D - Adjacent band compatiblity studies of IMT systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1525 MHz     WP 4C     2019-07-02
[ 1255 ]  
 
Views on Document IMT-2020/VVV     AT&T, Inc.     2019-07-01
[ 1254 ]  
 
Completion of Document IMT-2020/VVV  
English only
 
AT&T, Inc.     2019-07-01
[ 1253 ]  
 
Support of the IMT-2020 submission from ETSI     DECT Forum     2019-07-01
[ 1252 ]  
 
Proposed update of Question ITU-R 77-7/5 - Consideration of the needs of developing countries in the development and implementation of IMT     AT&T, Inc. , Qualcomm, Inc.     2019-07-01
[ 1251 ]  
 
Proposals related to revision of Recommendation ITU-R M.1036-5     Russian Federation     2019-07-01
[ 1250 ]  
 
Studies on WRC-19 agenda items 9.1/9.2 - Review of RR footnote No 5.441B     Russian Federation     2019-07-01
[ 1249 ]  
 
3GPP final technology submission of 3GPP 5G solution for IMT-2020 (CCSA)     Director, BR     2019-07-01
[ 1248 ]  
 
3GPP final technology submission of 3GPP 5G solution for IMT-2020 (TTA)     Director, BR     2019-07-01
[ 1247 ]  
 
Proposals for preliminary draft revision of Recommendation ITU-R M.1036 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RR)     Iran (Islamic Republic of)     2019-07-01
[ 1246 ]  
 
Consideration on working document towards a preliminary draft new Report ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries     Japan     2019-07-01
[ 1245 ]  
 
Proposals for program of IMT-2020 evaluation workshop     Japan     2019-07-01
[ 1244 ]  
 
Proposals for Addendum 4 to Circular Letter 5/LCCE/59     Japan     2019-07-01
[ 1243 ]  
 
Proposed modification to working document towards preliminary draft new Report on co-channel sharing analysis involving IMT-Advanced systems using haps as base stations in accordance with RR No.5.388A     Japan     2019-07-01
[ 1242 ]  
 
Proposed modifications to preliminary draft revsion of Recommendation ITU-R M.1036-5     Japan     2019-07-01
[ 1241 ]  
 
Proposals on detailed work for completeing new Recommedation M.[IMT-2020.SPECS] with hyperlinks     Japan     2019-07-01
[ 1240 ]  
 
Way forward of document towards IMT-2020/VVV     Japan     2019-07-01
[ 1239 ]  
 
Further proposal on modification of working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES] - National [approaches, best practices and/or] experience of some countries in which certain frequency band(s) are allocated to mobile services and identified for IMT systems related to technical, operational and regulatory/procedural aspects     Japan     2019-07-01
[ 1238 ]  
 
Submission of candidate IMT-2020 - Radio interface technology (EUHT)     Nufront (Beijing) Technology Co., Ltd.     2019-07-01
[ 1237 ]  
 
Update Report on CITEL PCC.II Activities     CITEL Rapporteur   Q229/5   2019-07-04
[ 1236 ]  
 
Proposed way forwards regarding document IMT-2020/VVV and IMT-2020 transposition works     Korea (Republic of)     2019-07-01
[ 1235 ]  
 
Proposal for draft summary of the status of the studies     Korea (Republic of)     2019-07-01
[ 1234 ]  
 
Proposal for a preliminary draf tnew Question/Resolution ITU-R [IMT.SPECIFIC INDUSTRIAL APPLICATIONS]/5     Korea (Republic of)     2019-07-01
[ 1233 ]  
 
Final submission of a candidate technology of IMT-2020     Korea (Republic of)     2019-07-01
[ 1232 ]  
 
Consideration for the protection of AMS from IMT systems in the band 4 400-4 990 MHz     Korea (Republic of)     2019-07-01
[ 1231 ]  
 
Updated submission of the candidate IMT-2020 Technology     TSDS, India (TSDSI)     2019-06-30
[ 1230 ]  
 
Description template of SRIT candidate for inclusion in IMT-2020     European Telecommunications Standards Institute     2019-06-30
[ 1229 ]  
 
Proposed amendments to preliminary draft new Question ITU-R M.[IMT.INDUSTRIAL AND ENTERPRISE.APPLICATIONS]     Canada     2019-06-29
[ 1228 ]  
 
Year 2020 Schedule for ITU-R IMT-2020 process for completion of Step 8 including consideration of transposition intervals     Chairman & Vice-Chairman WP 5D     2019-07-01
[ 1227 ]  
 
Proposed updates on the preliminary draft new Report ITU-R M.[RADAR&IMT SHARING] - In band and adjacent band coexistence and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz     Thales SA     2019-06-28
[ 1226 ]  
 
Proposal to develop a draft new Report on IMT-2020 for remote sparsely populated areas providing high data rate coverage     Telefon AB - LM Ericsson     2019-06-28
[ 1225 ]  
 
Preliminary draft revision of Recommendation ITU-R M.2012-3 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-Advanced (IMT-Advanced)     Director, BR     2019-06-28
[ 1224 ]  
 
Proposed updates to the preliminary draft new Report ITU-R M.[RADAR&IMT SHARING] - In band and adjacent band coexistence and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz     Australia     2019-06-28
[ 1223 ]  
 
Request for updating Recommendation ITU-R M.1457 to Revision 15     European Telecommunications Standards Institute     2019-06-26
[ 1222 ]  
 
Update on activities in Region 2     Region 2 Rapporteur     2019-06-25
[ 1221 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B and 5D on activities on wireless power transmission via radio frequency beam     WP 1A     2019-06-24
[ 1220 ]  
 
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 1A     2019-06-21
[ 1219 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications     WP 1A     2019-06-21
[ 1218 ]  
 
Correspondence received regarding the update of Recommendation ITU-R M.2012 to Revision 3 ("Certification C")     Director, BR     2019-06-20
[ 1217 ]  
 
3GPP 5G candidate for inclusion in IMT-2020: Submission 2 for IMT-2020 (RIT)     Alliance for Telecommunications Industry Solutions     2019-06-17
[ 1216 ]  
 
3GPP 5G candidate for inclusion in IMT-2020: Submission 1 (SRIT)     Alliance for Telecommunications Industry Solutions     2019-06-17
[ 1215 ]  
 
3GPP final technology submission - Overview of 3GPP 5G solutions for IMT-2020     Alliance for Telecommunications Industry Solutions     2019-06-17
[ 1214 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range     WP 1A     2019-06-18
[ 1213 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 1212 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference     WP 1A     2019-06-18
[ 1211 ]  
 
Draft new Report ITU-R M.[IMT.EXPERIENCES]     United States of America , Canada , Mexico     2019-06-18
Results:1310 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2022-06-07