International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP6A  C 

ITU-R WP6A

Terrestrial Broadcasting Delivery

Results:589 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 539 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 538 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reported cases of interference     WP 1A     2019-06-18
[ 537 ]  
 
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer     WP 1B     2019-06-17
[ 536 ]  
 
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5     ITU-T SG 5     2019-06-14
[ 535 ]  
 
Reply to a liaison statement to Working Party 5B and ICAO (with a copy to Working Party 6A for information) - Status of compatibility studies between the AM(R)S systems below 137 MHz and SOS non-GSO short duration satellite systems proposed in the 137-138 MHz (s-E) frequency band     WP 7B     2019-06-11
[ 534 ]  
 
Liaison statement to request inputs on the vehicular multimedia accessibility requirements     ITU-T FG-VM     2019-05-30
[ 533 ]  
 
Liaison statement to Working Party 6A - Time variation in Monte Carlo simulations for coverage and interference assessment in the broadcasting service     WP 3K     2019-05-28
[ 532 ]  
 
Reply liaison statement to Working Party 6A - Guidance for implementing beyond 1st generation DTTB systems and methods for evaluation of their quality of service performance requirements     WP 3K     2019-05-27
[ 531 ]  
(Rev.2) 
Reply liaison statement to Working Parties 1B, 5A and 6A - Building entry losses in the range 9 kHz to 10 MHz (far-field and near field)     WPs 3J, 3K, 3L and 3M     2019-05-27
[ 530 ]  
 
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 5A     2019-05-13
[ 529 ]  
 
Reply liaison statement to Working Party 6A - WRC-19 agenda item 1.11     WP 5A     2019-05-10
[ 528 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 4C, 5A, 5C and 6A for information) - Consideration of non-GSO short duration satellite systems in 137-138 MHz operating under the space operation service     WP 5A   AI1.7   2019-05-09
[ 527 ]  
 
(Contribution to Working Party 3K with copy to Woking Party 6A) - Time variation in Monte Carlo simulations for coverage and interference assessment in the broadcasting service     European Broadcasting Union     2019-05-06
[ 526 ]  
 
Liaison statement to request inputs on the vehicular multimedia - Technical Report and to invite participation from relevant stakeholders     ITU-T FG-VM     2019-04-12
[ 525 ]  
 
Liaison statement on strategies and policies concerning human exposure to EMF     ITU-D SG 2     2019-04-11
[ 524 ]  
 
Liaison statement to Working Party 6A (also to Working Party 6C for information) - Development of a preliminary draft new Report ITU-R BT.[ADVBROADCAST] and revision of Question ITU-R 133-1/6     WP 6B     2019-04-08
[ 523 ]  
+Ann.1-10 
Report of the meeting of Working Party 6A (Geneva, 26 March - 3 April)     Chairman, WP 6A     2019-04-04
[ 522 ]  
 
Final List of Participants - Working Party 6A (Geneva, 26 March - 3 April 2019)     Director, BR     2019-04-03
[ 521 ]  
 
Liaison statement to Working Party 6A (also to Working Party 6B for information) - Development of a preliminary draft new Report ITU-R BT.[ADVBROADCAST] and revision of Question ITU-R 133-1/6     WP 6C     2019-04-01
[ 520 ]  
 
Liaison statement to Working Party 6A - Information concerning the audio work of Working Party 6C     WP 6C     2019-04-01
[ 519 ]  
 
Establishment of a Rapporteur Group to review ITU-R Resolutions of specific concern to Study Group 6     WP 6C     2019-03-29
[ 518 ]  
 
Liaison statement - Proposal for a Study Group 6 future technology Expo and workshop     WP 6C     2019-03-29
[ 517 ]  
 
An element of liaison statement from ITU-R SG 6 to Telecommunication Standardization Advisory Group (TSAG) on ITU inter-Sector Coordination     WP 6C     2019-03-28
[ 516 ]  
 
Recommendation ITU-R F.1336-5 - Reference radiation patterns of omnidirectional, sectoral and other antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     SG 5     2019-03-27
[ 515 ]  
 
List of documents issued (Documents 6A/470 - 6A/515)     BR Study Groups Department     2019-03-25
[ 514 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 6A and 6B on collaboration and query concerning joint survey - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services     ITU-D SG 1     2019-03-25
[ 513 ]  
 
Liaisons statement on ITU inter-Sector coordination     ITU-T SG 11     2019-03-21
[ 512 ]  
 
Progress Report - WRC-19 agenda items 1.1, 1.3, 1.6, 1.7, 1.10, 1.11, 1.12, 1.13, 1.15 and 9.1, issues 9.1.2 and 9.1.6     RG for WRC-19 related studies   AI9.1, AI1.7, AI1.6, AI1.3, AI1.15, AI1.13, AI1.12, AI1.11, AI1.10, AI1.1   2019-03-20
[ 511 ]  
 
Report to Working Party 6A - Guidance for implementing beyond 1st generation DTTB systems and methods for their quality of service performance requirements and evaluation     CG [BEYOND1stGEN]   Q132/6   2019-03-20
[ 510 ]  
 
Brief update on developments in ICNIRP and ITU-T Study Group 5 - March 2018     Chairman, WP 6A , RG on RF Hazard     2019-03-19
[ 509 ]  
 
Preliminary draft new Report ITU-R BT.[B3BCPARAM]     Chair CG-B3BCPARAM     2019-03-19
[ 508 ]  
 
B3BCPARAM Rapporteur Report     CG-B3BCPARAM     2019-03-19
[ 507 ]  
 
Alignment of common band III parameters between sound and television     Chair CG - B3BCPARAMS     2019-03-19
[ 506 ]  
 
Preliminary draft revision of Recommendation ITU-R BS.1660 - Technical basis for planning of terrestrial digital sound broadcasting in the VHF band     European Broadcasting Union , Broadcast Networks Europe     2019-03-19
[ 505 ]  
 
Further input on objective reception quality assessment of DVB-T2 signals     European Broadcasting Union , Broadcast Networks Europe     2019-03-19
[ 504 ]  
 
Preliminary draft revision of Report ITU-R BS.2214 - Planning parameters for terrestrial digital sound broadcasting systems in VHF bands     European Broadcasting Union , Broadcast Networks Europe     2019-03-19
[ 503 ]  
 
Preliminary draft revision of Report ITU-R BT.2382 - Description of interference into a digital terrestrial television receiver     European Broadcasting Union     2019-03-19
[ 502 ]  
 
Report on recent developments concerning PLT systems and general EMC-related interference issues (Question ITU-R 221/1)     Rapp. on PLT and general EMC-related     2019-03-19
[ 501 ]  
(Rev.1) 
Report on recent developments on WPT under issue 9.1.6 of WRC-19     Rapp. on WPT Issues     2019-03-19
[ 500 ]  
 
Proposed revision of Recommendation ITU-R BT.2036 and Report ITU-R BT.2209 - Reference receiver characteristics for frequency planning study of ISDB-T systems     Japan , Philippines (Republic of the)     2019-03-19
[ 499 ]  
 
Proposed treatment of ITU-R Questions assigned to Study Group 6 within the purview of Working Party 6A     Japan     2019-03-19
[ 498 ]  
 
Proposed revision of Report ITU-R BT.2343-3 - Collection of field trials of UHDTV over DTT networks     Japan   Q133/6   2019-03-19
[ 497 ]  
(Rev.2) 
Progress Report     CG-MC-DTT     2019-03-19
[ 496 ]  
 
This document has been withdrawn     BR Study Group Department     2019-03-18
[ 495 ]  
 
Review of ITU-R Resolutions of specific concern to Study Group 6     Chairman, SG 6     2019-03-19
[ 494 ]  
 
The allocation of the sound radio programs from the multiplex DVB-T2 for admission to various radios     Russian Federation     2019-03-18
[ 493 ]  
 
Proposals to update the Report ITU-R BT.2387-0 - According to the current implementation status of terrestrial TV broadcasting in the RCC countries in Region 1     Russian Federation     2019-03-18
[ 492 ]  
 
Preliminary draft revision to Report ITU-R BT.2343-3 - Collection of field trials of UHDTV over DTT networks     China (People's Republic of)   Q136/6   2019-03-18
[ 491 ]  
 
CDR SFN system structure and lab test     China (People's Republic of)     2019-03-18
[ 490 ]  
 
Proposed new Question for Study Group 6 in 2019/23 study period     British Broadcasting Corporation (BBC)     2019-03-18
Results:589 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-19