International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7A  C 

ITU-R WP7A

Time Signals and Frequency Standard Emissions

Results:101 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 51 ]  
 
Proposals to working document towards the preliminary draft new Report ITU-R TF.[UTC]     Russian Federation     2018-05-03
[ 50 ]  
 
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz     SG 5     2018-03-06
[ 49 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS     WP 4B     2018-02-23
[ 48 ]  
 
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS     WP 4A     2018-02-20
[ 47 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems     WP 4C     2018-02-20
[ 46 ]  
 
Liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"     WP 5D     2018-02-12
[ 45 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Party 1A for information) - Work on WRC-19 agenda item 9.1, issue 9.1.6     WP 1B   AI9.1   2017-12-08
[ 44 ]  
 
Liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"     WP 5B     2017-11-20
[ 43 ]  
+Ann.1-2 
Report of the meeting of Working Party 7A (Geneva, 25-31 October 2017)     Chairman, WP 7A     2017-11-01
[ 42 ]  
 
Final List of participants Working Party 7A (Geneva, 25-31 October 2017)     Director, BR     2017-10-31
[ 41 ]  
 
List of documents issued (Documents 7A/21 - 7A/41)     BR Study Groups Department     2017-10-24
[ 40 ]  
 
CGPM draft Resolution "On the definition of Time-Scales"     International Bureau of Weights and Measures     2017-10-18
[ 39 ]  
 
Draft new Report ITU-R TF.[UTC] - The International Time Scale, Coordinated Universal Time (UTC)     United States of America     2017-10-14
[ 38 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 7A, 7B and 7D) - WRC-23 agenda item 2.2 regarding EESS (active) around the 45 MHz frequency region     WP 3L     2017-09-06
[ 37 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)     WP 1A     2017-07-10
[ 36 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 3L, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services     WP 1C     2017-07-07
[ 35 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7A for information) - Studies on "Wireles power transmission (WPT)"     WP 7D   AI9.1   2017-04-07
[ 34 ]  
 
Liaison statement to Working Parties 1A and 1B, and to their Rapporteur Group on WPT issues, to Working Party 5B, and to the Study Group 1 Rapporteur Group on liaison with CISPR and Rapporteur to CISPR on WPT issues (copy for information to Working Parties 5A, 5C, 7A & 7D) - Liaison between ITU-R and CISPR     WP 6A     2017-04-03
[ 33 ]  
 
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19     WP 6A   Q210/1   2017-04-03
[ 32 ]  
 
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)"     WP 1B   Q210/1   2016-12-14
[ 31 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT)     WP 1A   Q210/1   2016-12-13
[ 30 ]  
 
Reply liaison statement to Working Party 7A - Radio frequency ranges or wireless power transmission (WPT)     WP 1A   Q210/1   2016-12-13
[ 29 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT)     WP 1A   Q210/1   2016-12-13
[ 28 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than Radio Frequency Beam     WP 1A   Q210/1   2016-12-13
[ 27 ]  
 
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5B   Q210/1   2016-11-28
[ 26 ]  
 
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services     WP 1A     2016-12-13
[ 25 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 5A, 5B, 6A, 7A and 7D for information) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5C     2016-11-17
[ 24 ]  
 
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 7D   Q210/1   2016-11-01
[ 23 ]  
+Ann.1 
Report of the meeting of Working Party 7A (Geneva, 24-26 October 2016)     Chairman, WP 7A     2016-10-28
[ 22 ]  
 
Final List of Participantsn - Working Party 7A (Geneva, 24-26 October 2016)     Director, BR     2016-10-26
[ 21 ]  
 
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration     ITU-D SG 2     2016-10-24
[ 20 ]  
 
List of documents issued (Documents 7A/5 - 7A/20)     BR Study Groups Department     2016-10-21
[ 19 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT)     WP 6A   Q210/1   2016-10-21
[ 18 ]  
 
Proposed revision of Opinion ITU-R 99-1     United States of America     2016-10-13
[ 17 ]  
 
Proposed revision of Question ITU-R 236-1/7 - The future of the UTC time scale     United States of America   Q236/7   2016-10-14
[ 16 ]  
 
Proposed revision of Recommendation ITU-R TF.538-3 - Measures for random instabilities in frequency and time (phase)     United States of America     2016-10-14
[ 15 ]  
 
Proposals to working document on a proposed revision of Question ITU-R 236-1/7 - The future of the UTC time scale     Russian Federation     2016-10-12
[ 14 ]  
 
Draft revision of Recommendation ITU-R TF.538-3 - Measures for random instabilities in frequency and time (phase)     Italy , United States of America     2016-10-06
[ 13 ]  
 
Reply liaison statement to Working Party 1A (copied to Working Parties 1C, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of other emissions to radiocommunication services     WP 3L     2016-07-01
[ 12 ]  
 
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services     WP 1A   Q210/1   2016-06-16
[ 11 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B     WP 1A   Q210/1   2016-06-16
[ 10 ]  
 
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   Q210/1   2016-06-16
[ 9 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   Q210/1   2016-06-16
[ 8 ]  
 
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)     WP 1A     2016-06-15
[ 7 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5A     2016-05-25
[ 6 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 7D   Q210/1   2016-04-13
[ 5 ]  
+Ann.1-4 
Report of the meeting of Working Party 7A (Geneva, 5-7 April 2016)     Acting Chairman, WP 7A     2016-04-08
[ 4 ]  
 
Final List of Participants - Working Party 7A (Geneva, 4-7 April 2016)     Director, BR     2016-04-08
[ 3 ]  
 
List of documents issued (Documents 7A/1 - 7A/3)     BR Study Groups Department     2016-04-04
[ 2 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
Results:101 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-08-01