International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP5D  C 

ITU-R R23-WP5D

IMT Systems

Results:253 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 203 ]  
 
Proposal to finalize the work on draft revision of Recommendation ITU-R M.1036-7     Japan     2024-06-13
[ 202 ]  
 
Proposals to working document of document IMT-2030/2 "Process: submission, evaluation process and consensus building for IMT-2030"     Japan     2024-06-13
[ 201 ]  
 
Proposals to working document towards a preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and M.[IMT-2020.UNWANT.MS]     Japan     2024-06-13
[ 200 ]  
 
Proposals to working document toward preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] on "4.10 Positioning"     Japan     2024-06-13
[ 199 ]  
 
Proposals to working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Japan     2024-06-13
[ 198 ]  
 
IMT characteristics for use in WRC-27 studies     GSM Association (United Kingdom)     2024-06-13
[ 197 ]  
 
Considerations for the active antenna array radiation pattern model for IMT base stations     Telefon AB - LM Ericsson (Sweden)     2024-06-13
[ 196 ]  
 
Considerations on possible methodology to be used for sharing studies to assess protection of receiving space stations in the 7125-8400 MHz range (WRC-27 agenda item 1.7)     France   AI1.7   2024-06-13
[ 195 ]  
 
Proposals on Recommendation ITU-R S.[MITIGATION MEASURES]     France     2024-06-13
[ 194 ]  
 
Position and proposals regarding on the work on Recommendation ITU-R S.[MITIGATION MEASURES]     Mozambique , Nigeria , Papua New Guinea     2024-06-13
[ 193 ]  
 
Proposed draft reply liaison statement to Working Party 4C - Work related to WRC-27 agenda item 1.13     Germany   AI1.13   2024-06-13
[ 192 ]  
 
Reply-liaison statement to ITU-R Working Party 5D, on their recent publication - ITU-R Framework and overall objectives of the future development of IMT for 2030 and beyond     Director, BR     2024-06-13
[ 191 ]  
 
Further modifications to the working document of Document IMT-2030/1 "IMT-2030 background"     IAFI     2024-06-13
[ 190 ]  
 
Technical aspects of TDD technology for connectivity between space station and IMT user equipment for use in the proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.13     IAFI   AI1.13   2024-06-13
[ 189 ]  
 
Propose updates to working Document ITU-R M.[IMT-2020.UNWANT.MS]     IAFI     2024-06-13
[ 188 ]  
 
Further updates to the working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS]     IAFI     2024-06-13
[ 187 ]  
 
Proposal for IMT characteristics study     Korea (Rep. of)     2024-06-13
[ 186 ]  
 
Proposal for the test environments in IMT-2030 evaluation     Korea (Rep. of)     2024-06-13
[ 185 ]  
 
Proposal for a working document of Document IMT-2030/2 "Process"     Korea (Rep. of)     2024-06-13
[ 184 ]  
 
Proposal for improving working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)     Korea (Rep. of)     2024-06-13
[ 183 ]  
 
Proposal for update to a working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Korea (Rep. of)     2024-06-13
[ 182 ]  
 
Consideration on an approach to develop technical and operational characteristics of IMT in the existing IMT bands for other IMT-related WRC-27 agenda items     Samsung Electronics Co., Ltd. (Korea (Rep. of))     2024-06-13
[ 181 ]  
 
Consideration on parameters, assumptions and scenarios for IMT-2030 networks in 4 400-4 800 MHz, 7 125-8 400 MHz and 14.8-15.35 GHz band in sharing studies under WRC-27 agenda item 1.7     Samsung Electronics Co., Ltd. (Korea (Rep. of))   AI1.7   2024-06-13
[ 180 ]  
 
Proposal for a new ITU-R Report on coordination of stations in the FS with IMT stations in the frequency band 6 425-7 125 MHz     Kenya , South Africa , Zimbabwe     2024-06-13
[ 179 ]  
 
Reply liaison statement to Working Party 7D (copied to Working Party 5D for information) - Boundary conditions for the coordination and protection of the radio astronomy service in the 42.5-43.5 GHz band - Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]     WP 3M     2024-06-13
[ 178 ]  
 
Proposals to the preliminary draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations     Mexico     2024-06-13
[ 177 ]  
 
Proposals regarding the working document towards a preliminary draft new Recommendation / Report ITU-R S.[MITIGATION MEASURES]     Mexico     2024-06-13
[ 176 ]  
 
Proposals to the working document towards a preliminary draft new Report ITU-R M.[IMT.A2G] - Non-safety communications between base stations on ground and airborne user equipment devices supported by the terrestrial component of IMT     Mexico     2024-06-13
[ 175 ]  
 
Update on recent activities within CEPT     ITU Region 1 (CEPT) Rapporteur     2024-06-13
[ 174 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Finland , Germany , United Kingdom     2024-06-12
[ 173 ]  
 
Proposals on the technical performance requirements for draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     Apple Inc. (United States)     2024-06-12
[ 172 ]  
 
IMT base station density estimations for sharing and compatibility studies in preparation for WRC-27     United Kingdom     2024-06-12
[ 171 ]  
 
Considerations on IMT-2030 technology related work     Nokia Corporation (Finland) , Apple Inc. (United States) , Huawei Technologies Sweden AB , Intel Corporation (United States) , InterDigital Communications, Inc. (United States) , Qualcomm, Inc. (United States) , Samsung Electronics Co., Ltd. (Korea (Rep. of)) , Telefon AB - LM Ericsson (Sweden) , ZTE Corporation (China)     2024-06-12
[ 170 ]  
 
Proposed reply liaison statement to Working Party 4C on work related to WRC-27 agenda item 1.13     China   AI1.13   2024-06-12
[ 169 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17     WPs 3L & 3M   AI1.17   2024-06-12
[ 168 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 3M   AI1.1   2024-06-12
[ 167 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WPs 3L & 3M   AI1.14, AI1.13, AI1.12, AI1.11   2024-06-12
[ 166 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19     WPs 3J & 3M   AI1.19   2024-06-12
[ 165 ]  
 
Proposed material for reply liaison statements to relevant Working Parties     Canada     2024-06-11
[ 164 ]  
 
IMT-2030: Some considerations on usage scenarios, geographical environments and test environments     Canada     2024-06-11
[ 163 ]  
 
Proposal on text of working document towards the preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]     ATIS NextG Alliance     2024-06-12
[ 162 ]  
 
Proposal on test environments for IMT-2030     ATIS NextG Alliance     2024-06-11
[ 161 ]  
 
Reply liaison statement to Working Party 7B (copied to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 3J   AI1.15   2024-06-12
[ 160 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WPs 3K & 3M   AI1.7   2024-06-10
[ 159 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16     WPs 3J & 3M   AI1.16   2024-06-10
[ 158 ]  
 
Assessment of the effect of zero-forcing on gain distribution for active antenna of IMT BS     France , New Zealand     2024-06-07
[ 157 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[1.7 X BAND] - Sharing and compatibility studies and development of technical conditions for the use of International Mobile Telecommunications (IMT) in the frequency band 7 125-8 400 MHz (or parts thereof) for the terrestrial component of IMT     France   AI1.7   2024-06-07
[ 156 ]  
 
Liaison statement on the establishment of the working group on "Requirements for merging automatically into congested lanes"     CITS EG-ComAD     2024-06-10
[ 155 ]  
 
Information on 5G NR MBS standards and practices     China     2024-06-07
[ 154 ]  
 
Proposals on working documents towards preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] and ITU-R M.[IMT-2020.UNWANT.MS]     China     2024-06-07
Results:253 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-08-14