International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Meeting 2008-09-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C (2008-09-01) 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Meeting  from 2008-09-01 to 2008-09-11

held in Switzerland [Geneva]

Other Meetings : 2008-05-12  2008-01-14  2007-09-11  2007-04-16  2007-01-08  2006-10-24  2006-07-17  2006-04-22  2006-01-16 

Results:244 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1253 ]  
 
Input to clause 6.2.4 Authentication and Key Agreement (AKA) of the draft Recommendation Y.NGN IdM Mechanisms     Lucent Technologies   Q15/13   2008-08-27
[ 1252 ]  
 
Proposal for additional text on traffic conditioning     Huawei   Q4/13   2008-08-26
[ 1251 ]  
 
Proposal for additional text in the scope of Y.IPTV-TM     Huawei   Q4/13   2008-08-26
[ 1250 ]  
 
High level requirements of traffic management for the support of IPTV services     Huawei   Q4/13   2008-08-26
[ 1249 ]  
 
Proposal for structural change of Y.IPTV-TM     Huawei   Q4/13   2008-08-26
[ 1248 ]  
 
New sub clause on traffic classification in Y.IPTV-TM     Huawei   Q4/13   2008-08-26
[ 1247 ]  
 
Proposal for new sub clause on management plane mechanisms     Huawei   Q4/13   2008-08-26
[ 1246 ]  
 
Y.NGN-FRA : Proposed text for Annex C (IPTV)     France Telecom   Q3/13   2008-08-26
[ 1245 ]  
 
Y.NGN-FRA : Proposed new clauses in clause 9.3.4 ("Application support functions and service support functions")     France Telecom   Q3/13   2008-08-26
[ 1244 ]  
 
Y.NGN-FRA : Proposed new clause 9.3.3.2 ("Content delivery functional entities")     France Telecom   Q3/13   2008-08-26
[ 1243 ]  
 
Proposed to add the nomadism scenario in Y.RACF (Y.2111)     ZTE Corp.   Q4/13   2008-08-26
[ 1242 ]  
 
Proposed to add the description for resource control scenarios for nomadism     ZTE Corp.   Q4/13   2008-08-26
[ 1241 ]  
 
Proposal for Transport Separation of IP into identifier and locator Execution Function for Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1240 ]  
 
Proposal for the information flow of the Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1239 ]  
 
Proposal for the high level functions of Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1238 ]  
 
Proposal for the architecture model of Y.FAipsplit     ZTE Corp.   Q3/13   2008-08-26
[ 1237 ]  
 
Proposal for new work Item of Y.FAipsplit, " Functional Architecture of ipsplit in NGN "     ZTE Corp.   Q3/13   2008-08-26
[ 1236 ]  
 
Call Centre Service Scenario and Deployment Model over NGN     China Telecom, ZTE Corp.   Q8/13   2008-08-26
[ 1235 ]  
 
Propose Security Considerations in Y.MMCF     ZTE Corp.   Q15/13, Q3/13   2008-08-26
[ 1234 ]  
 
Y.NGN-FRA : Proposed text for clause 7.2.1.2 ("Content delivery functions")     France Telecom   Q3/13   2008-08-26
[ 1233 ]  
 
Changes to Figure 3 of Y.2012     France Telecom   Q3/13   2008-08-26
[ 1232 ]  
 
Functional architecture aspects of IPTV network control - Comments     France Telecom   Q3/13   2008-08-26
[ 1231 ]  
 
Proposal of an IPTV Brokerage Service Scenario     Korea (Rep. of)   Q8/13   2008-08-26
[ 1230 ]  
 
Considerations on Identification Framework for IPTV Services     Korea (Rep. of)   Q2/13   2008-08-26
[ 1229 ]  
 
Proposal for terms and definitions section of Y. IdMFramework [2]     NEC Corp.   Q15/13   2008-08-26
[ 1228 ]  
 
Proposal for terms and definitions section of Y. IdMFramework     NEC Corp.   Q15/13   2008-08-26
[ 1227 ]  
 
Proposed modifications on appendices of Y.mpls-mob     ETRI   Q2/13   2008-08-26
[ 1226 ]  
 
Proposal for adding functional descriptions of communications between RACF and MPM in RACF document     KDDI Corp. (KDDI R&D Labs)   Q4/13   2008-08-26
[ 1225 ]  
 
Modifications on inter-operator communications (clause 10) in Y.RACF rev. 1     KDDI Corp.   Q4/13   2008-08-26
[ 1224 ]  
 
Basic signalling procedures in resource control protocol no.7 (Ri interface) ver. 1     KDDI Corp.   Q5/11   2008-08-26
[ 1223 ]  
 
Revised draft ITU-T Recommendation Q.3307.1 ? Resource control protocol no.7 (rcp7 )- Protocol at the interface between inter-domain Policy Decision Physical Entities (PD-PEs) (Ri interface)     KDDI Corp.   Q5/11   2008-08-26
[ 1222 ]  
 
Consideration of topology hiding at Ri reference point     KDDI Corp.   Q5/11   2008-08-26
[ 1221 ]  
 
Proposal for a new draft recommendation Y.IPTVBrokeringScenario ?3rd Party IPTV Service Brokering Scenarios?     ETRI   Q8/13   2008-08-26
[ 1220 ]  
 
Proposal of changing the texts on draft Recommendation Y.cwbs     ETRI   Q8/13   2008-08-26
[ 1219 ]  
 
Proposal for update texts of requirements in clause 6 on Y.cwbs     ETRI   Q8/13   2008-08-26
[ 1218 ]  
 
Proposal for revised texts of service scenario in clause 8 on Y.cwbs     ETRI   Q8/13   2008-08-26
[ 1217 ]  
 
Request for review of draft Rec.Y.mpls-mob ?MPLS-based mobility capabilities for NGN Services?     ETRI   Q3/13   2008-08-26
[ 1216 ]  
 
Proposal for editorial enhancements of Y.mpls-mob     ETRI   Q2/13   2008-08-26
[ 1215 ]  
 
Comments on terminologies in Y.mpls-mob     ETRI   Q2/13   2008-08-26
[ 1214 ]  
 
Propose to update section of convergence level in Q.FMC-IMS     China Mobile   Q6/13, Q5/19   2008-08-26
[ 1213 ]  
 
Propose to modify the Annex B of Q.FMC-IMS     China Mobile   Q6/13, Q5/19   2008-08-26
[ 1212 ]  
 
Proposal to modify the security procedures of clause 7.1 of draft Y.MMCF     China Mobile, Huawei   Q3/13   2008-08-26
[ 1211 ]  
 
Proposal to modify clause 6.2.4 of draft Rec. Y.MMCF     China Mobile, Huawei   Q3/13   2008-08-26
[ 1210 ]  
 
Proposal for split mode for further study     China Mobile, Huawei   Q3/13   2008-08-26
[ 1209 ]  
 
Proposal for Information Flows for network exit     China Mobile, Huawei   Q3/13   2008-08-26
[ 1208 ]  
 
Proposal for information flow for handover     China Mobile, Huawei   Q3/13   2008-08-26
[ 1207 ]  
 
Proposal for clarification of functionality description of MLMF     China Mobile, Huawei   Q3/13   2008-08-26
[ 1206 ]  
 
Proposal for clarification on functionality of HCF ,HEF and L2HF     China Mobile, Huawei   Q3/13   2008-08-26
[ 1205 ]  
 
Overview of mobility handover procedures     China Mobile, Huawei   Q3/13   2008-08-26
[ 1204 ]  
 
Withdrawn by the author     China Mobile   Q6/13, Q5/19   2008-08-26
Results:244 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-27