Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2084 ]
|
Testing Packet Clocks (re. G.8263) - Part 2
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2083 ]
|
Normal operation of telecom-grade network elements for supporting packet-based timing
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2082 ]
|
Packet Timing Monitor - Definition
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2081 ]
|
Annex for G.8273 discussing performance parameters for PTP clocks
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2080 ]
|
Organization of T-BC performance requirements
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2079 ]
|
Time Error of PTP master ports
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2078 ]
|
Time error accumulation in chains of phase/time clocks
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2077 ]
|
Estimating constant time error and related measurement methods for phase/time clocks
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2075 ]
|
G.8260: Definition of Partial On-path Support
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2074 ]
|
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2073 ]
|
G.8272: Phase/Time Holdover Capability for a PRTC
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2069 ]
|
G.8272: Performance conditions for the PRTC
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2068 ]
|
G.8265.1: Value of the PTP "Renewal Invited" flag
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2067 ]
|
G.8265.1: Value of the PTP clockAccuracy Field
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2063 ]
(Rev.1) |
G.8263: PDV Noise Tolerance Testing for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2060 ]
|
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2053 ]
(Rev.1) |
Development of a new PTP Profile for Time/Phase Distribution
|
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
|
Q13/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2043 ]
|
Alternative to legacy interfaces for connecting PRTC to T-GM
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2042 ]
|
G.8272: PRTC Support of SyncE and ESMC
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2040 ]
|
Support of IPv6 for G.8265.1
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2039 ]
|
Two-step clock issue with multicast transmission
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2038 ]
|
Support of IP for G.8275.x
|
Cisco Systems, Inc.
,
Juniper Networks
|
Q13/15
|
2012-08-24 |
|
[ 2014 ]
(Rev.1) |
Considerations on Time Sync holdover and rearrangements
|
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-24 |
|
[ 2004 ]
(Rev.1) |
Considerations on Time sync Limits in G.8271.1
|
Calnex Solutions Limited
,
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-23 |
|
[ 2003 ]
(Rev.1) |
Multicast address in the G.8275.1 profile
|
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-23 |
|
[ 2002 ]
(Rev.1) |
Considerations on the constant asymmetry in the G.8271.1 network reference model
|
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-23 |
|
[ 1994 ]
(Rev.1) |
EEC with enhanced Holdover
|
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-23 |
|
[ 1987 ]
|
G.8272 latest draft editorial comments
|
Integrated Device Technology (IDT)
|
Q13/15
|
2012-08-22 |
|
[ 1986 ]
|
G.8272 Summary
|
Integrated Device Technology (IDT)
|
Q13/15
|
2012-08-22 |
|
[ 1985 ]
|
Time Error Budget to Allocate to Error Inside BC [G.8271 / G.8273.2]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2012-08-22 |
|
[ 1984 ]
|
Thoughts on Options for Syntonization of T-BC without SyncE / T-BC Models
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2012-08-22 |
|
[ 1983 ]
|
Move Metrics from G.8261 to G.8260
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2012-08-22 |
|
[ 1982 ]
|
Holdover Requirement [G.8263]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2012-08-22 |
|
[ 1981 ]
|
Temperature Profile Appendix [G.8263]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2012-08-22 |
|
[ 1976 ]
|
Example of changes to G.8021 to support enhanced holdover
|
Ciena Canada
|
Q13/15
|
2012-08-22 |
|
[ 1975 ]
|
Further considerations on PRTC modelling
|
Ciena Canada
|
Q13/15
|
2012-08-22 |
|
[ 1973 ]
|
Use of G.805 to model PRTC and BC clocks
|
Ciena Canada
|
Q13/15
|
2012-08-22 |
|
[ 1958 ]
(Rev.1) |
G.8273.2: Discussion on text for Sections 6 through 9.
|
Calnex Solutions Limited
|
Q13/15
|
2012-08-15 |
|
[ 1948 ]
(Rev.1) |
G.8273.3: Noise Error Definition for T-TC to control impact of traffic.
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15
|
2012-08-08 |
|
[ 1947 ]
(Rev.1) |
G.8273.2: T-BC Noise Error Definition to control impact of traffic.
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15
|
2012-08-08 |
|
[ 1946 ]
(Rev.1) |
G.8273.2: Phase Transient interface applicability.
|
Calnex Solutions Limited
|
Q13/15
|
2012-08-08 |
|
[ 1928 ]
|
Measurement Methods for Phase/Time Clocks
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1927 ]
|
PTP and SyncE over OTN-ODU0
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1926 ]
|
G.8271: Minor editorial improvements
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1925 ]
|
G.8271 1pps interface performance specification
|
Deutsche Telekom AG
,
France Télécom Orange
|
Q13/15
|
2011-11-23 |
|
[ 1924 ]
|
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL
|
Tellabs Oy
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1916 ]
(Rev.1) |
Parameter proposals for PTP time profile
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1915 ]
(Rev.1) |
Proposal to remove Class A/ Class B metric classification from G.8260
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1911 ]
(Rev.1) |
G.8263 holdover requirement/squelch
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
Results:487 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):