Contributions
[ AI/Question: Q13/15 ] ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 599 ]
|
G.8273.2: T-TSC Specification
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 598 ]
|
G.8273.2: 1pps Performance Requirements
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 597 ]
|
G.8273.2: Noise Generation
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 596 ]
|
G.8273 Annex A Equations
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 595 ]
|
G.8271.1: MTIE Limit for Dynamic Time Error
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 594 ]
|
G.8262: Jitter for Multilane, 40G and 100G Interfaces
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 593 ]
|
G.8260: Definitions of Dynamic Time Error and Maximum Time Error
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 592 ]
|
T-BC Time/phase noise generation [G.8273.2, G.8271.1]
|
Vitesse Semiconductor Corporation
|
Q13/15
|
2014-03-10 |
|
[ 586 ]
|
Proposal for time synchronization requirements
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q2/15, Q13/15
|
2014-03-10 |
|
[ 556 ]
|
Thermal Profiles for Telecom Equipment
|
Sprint Corporation
,
Rakon, UK
|
Q13/15
|
2014-03-10 |
|
[ 554 ]
|
G.8271.2: SOAM Assisted Partial Timing Support
|
Sprint Corporation
,
ADVA, Israel
|
Q13/15
|
2014-03-10 |
|
[ 552 ]
|
G.8271.2: Budget proposal for Assisted Partial Timing Support
|
Sprint Corporation
,
Calnex, UK
|
Q13/15
|
2014-03-10 |
|
[ 549 ]
|
Assisted Partial Timing Support Clock
|
Sprint Corporation
|
Q13/15
|
2014-03-10 |
|
[ 525 ]
|
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE
|
Deutsche Telekom AG
|
Q13/15
|
2014-03-08 |
|
[ 524 ]
|
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE
|
Deutsche Telekom AG
|
Q13/15
|
2014-03-08 |
|
[ 519 ]
|
Updates in the G.8271.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-03-08 |
|
[ 516 ]
|
Timing Distribution with PTP-over-OTN Overhead Proposal
|
PMC-Sierra, Inc.
|
Q13/15, Q11/15
|
2014-03-08 |
|
[ 498 ]
|
Clarification of clockClass table [G.8275.1]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 496 ]
|
T-TSC-P/T-BC-P/APTSC Model for partial timing support [G.8273.4]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 495 ]
|
T-BC SyncE transient testing method [G.8273]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 494 ]
|
T-BC SyncE Transient Requirement [G.8273.2]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 493 ]
|
T-BC Model [G.8273.2]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 492 ]
|
T-BC Applicable Interfaces [G.8273.2]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 491 ]
|
Bench Results of SyncE (for use as IEEE1588/GNSS holdover) [G.827x]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 489 ]
|
Definition of Clock Behaviour with Regards to clockClass Usage [G.8275.1]
|
Ciena Canada
|
Q13/15
|
2014-03-07 |
|
[ 488 ]
|
T-BC Clock Models [G.8273.2]
|
Ciena Canada
|
Q13/15
|
2014-03-07 |
|
[ 483 ]
|
MEF Mobile Backhaul
|
Ericsson Canada, Inc.
|
Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15
|
2014-03-07 |
|
[ 462 ]
|
Filtering for the Network Limits measurements in G.8271.1
|
Calnex Solutions Limited
,
Huawei Technologies Co. Ltd.
,
Telefon AB - LM Ericsson
|
Q13/15
|
2014-03-06 |
|
[ 452 ]
|
G.8273.2 T-BC Maximum Time Error Spezification
|
Deutsche Telekom AG
,
Iometrix, Inc.
|
Q13/15
|
2014-02-27 |
|
[ 451 ]
|
Galileo as PRTC Source: IOV Measurement results
|
Deutsche Telekom AG
|
Q13/15
|
2014-02-27 |
Results:80 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):