Contributions
[ Source: Bourns Limited ] [ AI/Question: Q2/5 ] ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 291 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background
|
Bourns Limited
|
Q2/5
|
2018-06-29 |
|
[ 272 ]
(Rev.1) |
IEC 60617 compliance and PoE testing
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 271 ]
(Rev.1-2) |
Insulation co-ordination and IEEE 802.3 insulation tests
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 270 ]
(Rev.1) |
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences
|
Bourns Limited
|
Q2/5, Q1/5
|
2018-05-08 |
|
[ 269 ]
|
Clarification needed on PoE testing - topics for discussion
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 267 ]
|
Referencing Figure 6.7-3 given in the ITU-T K.44
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 264 ]
(Rev.1-3) |
Some reworked material for K.rcd document
|
Bourns Limited
,
China Telecommunications Corporation
|
Q2/5
|
2018-05-08 |
|
[ 228 ]
(Rev.1) |
Bridging Ethernet functional insulation
|
Bourns Limited
|
Q2/5
|
2018-04-19 |
|
[ 220 ]
(Rev.1) |
High current-carrying components in Recommendations K.20, K.21, K.44 and K.45
|
Bourns Limited
|
Q2/5
|
2018-03-30 |
|
[ 219 ]
(Rev.1-2) |
K.44 1.2/50 generator enhancements
|
Bourns Limited
|
Q2/5
|
2018-03-30 |
|
[ 218 ]
|
Corrections and changes in test rows 5.2.2a and 5.2.2b in K.20, K.21 and K.45
|
Bourns Limited
|
Q2/5
|
2018-03-29 |
|
[ 217 ]
|
K.44, Correction of Figure A.3-6, Figure A.6.1-3 and Note 1 of Table A.5-1
|
Bourns Limited
|
Q2/5
|
2018-03-28 |
|
[ 151 ]
|
Isolation transformers and rated insulation withstand
|
Bourns Limited
|
Q8/5, Q2/5
|
2017-10-31 |
|
[ 135 ]
(Rev.1) |
Partially edited COM 595 "The draft of Recommendation ITU-T K.appl2"
|
Bourns Limited
|
Q2/5
|
2017-10-30 |
|
[ 105 ]
|
Replies to Suggestions for K.99 Surge protective component application guide - Gas discharge tubes
|
Bourns Limited
|
Q2/5
|
2017-10-27 |
|
[ 95 ]
|
Screened, shielded and coaxial cable definitions for K.44
|
Bourns Limited
|
Q2/5
|
2017-10-17 |
|
[ 94 ]
|
TD 123 K.44 8/20 generator artwork check
|
Bourns Limited
|
Q2/5
|
2017-10-17 |
|
[ 92 ]
|
Ethernet port differential surge test with reduced i²t
|
Bourns Limited
|
Q2/5
|
2017-10-15 |
|
[ 91 ]
|
Ethernet port current surge parameters
|
Bourns Limited
|
Q2/5
|
2017-10-14 |
|
[ 71 ]
|
3-Electrode GDT operation in Ethernet circuits
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 64 ]
|
Appendix proposal for K.99 on GDT Component Form Factors
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 55 ]
|
Review of K.20, K.21, K.44 and K.45 - Part 3 K.44 generators and test circuits
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 54 ]
|
Review of K.20, K.21, K.44 and K.45 - Part 2 K.20, K.21 and K.45 Test tables columns 4 and 5
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 40 ]
(Rev.1) |
Review of K.20, K.21, K.44 and K.45 - Part 1 K.20, K.21 and K.45 Test tables columns 1 through 3
|
Bourns Limited
|
Q2/5
|
2017-04-29 |
|
[ 13 ]
|
Definitions for AC supply configurations
|
Bourns Limited
|
Q2/5
|
2017-04-15 |
|
[ 12 ]
|
Updating K.20/K.21/K.45 2.1.5 and 2.1.6 test comments for C.002 six output 8/20 generator
|
Bourns Limited
|
Q2/5
|
2017-04-14 |
|
[ 10 ]
|
Draft K.appl4 - High frequency signal isolation transformers version
|
Bourns Limited
|
Q2/5
|
2017-03-31 |
|
[ 2 ]
(Rev.1-2) |
Replacement K.44 Figure A.3-4 - 8/20 current generator
|
Bourns Limited
|
Q2/5
|
2017-02-27 |
Results:78 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):