Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 263 ]
(Rev.1) |
G.8272 Holdover further discussions
|
Orange (France)
|
Q13/15
|
2022-09-06 |
|
[ 262 ]
(Rev.1) |
G. 8275.1 clarification on clockclass Values
|
Orange (France)
|
Q13/15
|
2022-09-06 |
|
[ 261 ]
|
Mapping analysis and consideration of OSU over OPU
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 260 ]
|
B400G discussion of the frame of a possible cross-digital and optical layer hitless rate adjustable OTN interface
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 259 ]
|
Proposed text modifications for Draft G.8321 - Characteristics of MTN equipment functional blocks
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2022-09-06 |
|
[ 258 ]
|
B400G discussion of the optics of a possible cross-digital and optical layer hitless rate adjustable OTN interface
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 257 ]
|
Knowledge graph (KG) enhanced management and control
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2022-09-06 |
|
[ 256 ]
|
Proposal of PM fragment for G.8350 Amendment1
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 255 ]
|
Analysis of GMP scheme applied into resizing
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 254 ]
|
Latency and implementation complexity analysis of OSU with different TS interleaving widths
|
ZTE Corporation (China)
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2022-09-06 |
|
[ 253 ]
|
Consideration of OSU multiplexing structure identifier
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2022-09-06 |
|
[ 252 ]
|
Consideration of real-time indication for OSU mapping and multiplexing
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2022-09-06 |
|
[ 251 ]
|
G.fin: Some considerations on G.fin architecture for Wi-Fi backhauling
|
Maxlinear Inc (United States)
|
Q3/15
|
2022-09-06 |
|
[ 250 ]
|
Proposal of contents to consent in G.9962 Amd2
|
Maxlinear Inc (United States)
|
Q3/15
|
2022-09-06 |
|
[ 249 ]
|
G.hn in the access/fibre extension context. Proposal of updating the Technical Paper
|
Maxlinear Inc (United States)
|
Q3/15
|
2022-09-06 |
|
[ 248 ]
|
G.hn: Further updates on the working text of the data model and protocol for the support of C-NDIM
|
Maxlinear Inc (United States)
|
Q3/15
|
2022-09-06 |
|
[ 247 ]
|
Updates MI signals to IM of G.8350 Amendment1
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 246 ]
|
Proposal on MTN and FlexE layers of G.781.1
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 245 ]
|
Discussion of OAM function requirement of semi-active WDM system
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
|
Q2/15
|
2022-09-06 |
|
[ 244 ]
|
Port dataset of SyncPhy
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 243 ]
|
Amendment to G.959.1 for short-distance OTU4 interfaces of OTN
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 242 ]
(Rev.1) |
Automatic maintenance of optical media network
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q7/15, Q6/15, Q14/15, Q12/15
|
2022-09-06 |
|
[ 241 ]
|
Propose to study the requirements and technologies for beyond 50Gb/s per wavelength
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2022-09-06 |
|
[ 240 ]
|
Proposal for new Recommendation "Plate type optical fibre cables for indoor, short distance and ordered application"
|
China Information Communication Technologies Group
,
China Unicom
,
Hengtong Optic-electric Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2022-09-06 |
|
[ 239 ]
(Rev.1) |
Proposal to re-open G.807 to study maintenance of Optical Media Network
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q7/15, Q6/15, Q14/15, Q12/15
|
2022-09-06 |
|
[ 238 ]
|
Changes of G.7711 from 2018 to 2022 version
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 237 ]
|
OTS and OMS protection model in G.876
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 236 ]
|
Transparent mode for GCC0
|
ZTE Corporation (China)
,
China Mobile Communications Co. Ltd.
|
Q14/15, Q11/15
|
2022-09-06 |
|
[ 235 ]
|
Current, Parent, and timeProperties datasets of SyncPhy
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 234 ]
|
UML model for optical media channel and media subnetwork
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 233 ]
|
Default dataset of SyncPhy
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 232 ]
|
B400G OTN short reach interface solution
|
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 231 ]
|
Proposal on MTN layer of G.781
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 230 ]
|
Analysis on B400G OTN error marking mechanism
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 229 ]
|
Some comments on the out of range method in G.7710
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 228 ]
|
A proposal to solve the undesirable dMSIM and service interruption
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 227 ]
|
Consideration on MTN fine granularity frame size
|
China Mobile Communications Co. Ltd.
|
Q11/15
|
2022-09-06 |
|
[ 226 ]
(Rev.1-2) |
Proposal to consider the spectrum schedule of optical fibre for ultra-high capacity optical transmission system
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 225 ]
|
Proposal on BMCA with accuracy TLV
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 224 ]
(Rev.1-2) |
Proposal to consider the transmission distance beyond 450 km
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 223 ]
|
G.9804.3 : 50G Upstream ONU Tx TDEC test
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2022-09-06 |
|
[ 222 ]
|
Proposal on definition of accuracy TLV for path selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 221 ]
|
Proposal for G.8152.2 Amd.1 linear protection
|
China Information Communication Technologies Group
|
Q14/15
|
2022-09-06 |
|
[ 220 ]
|
G.9804.3: 50G Upstream Eye Mask
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2022-09-06 |
|
[ 219 ]
(Rev.1-2) |
Discussion of the adoption of maximum spectral excursion into G.owdm2
|
China Mobile Communications Co. Ltd.
|
Q6/15
|
2022-09-06 |
|
[ 218 ]
|
Proposal on use cases of accuracy path selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 217 ]
|
G.9804.3 50G upstream PMD Parameters
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2022-09-06 |
|
[ 216 ]
|
Proposal on working document for accuracy path selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 215 ]
|
Proposal to study digital twin (DT) in transport network
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2022-09-06 |
|
[ 214 ]
|
Proposals to solve open issues in G.8321
|
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
Results:312 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):