Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 49 ]
(Rev.1) |
LS to WP 3M - The percentage of time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service, and permitting operation of FSS earth stations
|
WP 4-9S
|
|
2001-05-31 |
|
[ 48 ]
(Rev.1) |
Liaison statement to Working Party 3M concerning propagation aspects of the determination of coordination distance
|
WP 1A
|
|
2001-05-31 |
|
[ 47 ]
(Rev.1) |
Liaison statement to Working Party 3J concerning The organization in Study Group 3 Recommendations of information on the effect of building materials and structures on radio propagation
|
WP 3K
|
|
2001-05-31 |
|
[ 46 ]
(Rev.1) |
Liaison statement from WP 9D - Resolution 79 (WRC-2000) on the coordination distance between radio astronomy and earth stations in bands above 30 GHz and P-MP high density applications in the fixed servce
|
WP 9D
|
|
2001-05-31 |
|
[ 45 ]
(Rev.1) |
Liaison statement to Working Parties 3M, 8A and 4-9S - Proposal for deletion of Recommendations ITU-R F.1092-1 and ITU-R F.1189-1
|
WP 9A
|
|
2001-05-31 |
|
[ 44 ]
(Rev.1) |
Liaison statement to Working Party 3M concerning rain attenuation calculations in Recommendation ITU-R P.530
|
WP 9A
|
|
2001-05-31 |
|
[ 43 ]
(Rev.1) |
Liaison statement to WP 3M concerning Rec. ITU-R P.530 and path planning and system design in a multi-path fading environment
|
WP 9A
|
|
2001-05-31 |
|
[ 42 ]
(Rev.1) |
Liaison statement to Working Parties 3K and 3M - Methods for point-to-area predictions to terrestrial services in the frequency range 30-3 000 MHz - DNR [BLM]
|
WP 8A
|
|
2001-05-31 |
|
[ 41 ]
(Rev.1) |
Liaison Statement to Working Parties 8B and 8F on frequency sharing in the band 2 700-2 900 MHz
|
Ch WP 3M
|
|
2001-05-31 |
|
[ 40 ]
(Rev.1) |
Liaison statement to ITU-R WP 8B and WP 3M - Analysis of co-frequency sharing of the band 2 700-2 900 MHz between the mobile service (IMT-2000) and meteorological and aeronautical radionavigation radars
|
WP 8F
|
|
2001-05-31 |
|
[ 39 ]
(Rev.1) |
Liaison statement to Working Parties 3K and 3M concerning the organisation in Study Group 3 Recommendations of information on the effect of building materials and structures on radio propagation
|
WP 3J
|
|
2001-05-31 |
|
[ 38 ]
(Rev.1) |
Chairman's Report to the next meeting of Working Party 3M
|
Ch WP 3M
|
|
2001-05-31 |
|
[ 37 ]
(Rev.1) |
List of documents
|
BRSGD
|
|
2001-05-31 |
|
[ 36 ]
(Rev.1) |
Proposed contribution for the Handbook on propagation on terrestrial links
|
Canada
|
|
2001-05-31 |
|
[ 35 ]
(Rev.1) |
Prosed modification of Recommendation ITU-R P. 530-9 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
|
Canada
|
|
2001-05-31 |
|
[ 34 ]
(Rev.1) |
Further developments on mode (2) rain scatter interference calculations for Recommendation ITU-R P.620-4, and comparisons with Recommendation ITU-R P.452-9 and experimental measurements
|
United Kingdom of Great Britain and Northern Ireland
|
|
2001-05-31 |
|
[ 33 ]
(Rev.1) |
Proposed revision to Recommendation ITU-R P.681
|
Spain
|
|
2001-05-31 |
|
[ 32 ]
(Rev.1) |
Single frequency fading and simultaneous fading in multihop links
|
Brazil (Federative Rep. of)
|
|
2001-05-31 |
|
[ 31 ]
(Rev.1) |
Rain attenuation at 15 and 18 GHz in converging links
|
Brazil (Federative Rep. of)
|
|
2001-05-31 |
|
[ 30 ]
(Rev.1) |
Working Document toward a preliminary draft new Recommendation on propagation data and prediction methods required for the design of space-to-Earth and Earth-to-space Oticalcommunication systems
|
United States of America
|
|
2001-05-31 |
|
[ 29 ]
(Rev.1) |
Discussion document - Provision of validation data for Study Group 3 prediction methods
|
Australia
|
|
2001-05-31 |
|
[ 28 ]
(Rev.1) |
Liaison statement to WPs 3J and 3M - Terrestrial scatter models in the 36-37 GHz band applicable to passive sensors
|
WP 7C
|
|
2001-05-31 |
|
[ 27 ]
(Rev.1) |
Proposed amendment to Recommendation ITU-R P.530-9 - Rain attenuation effective path length
|
Australia
|
|
2001-05-31 |
|
[ 26 ]
(Rev.1) |
Propagation models for evaluating the interference level between MSS feeder links and RLAN in a 5-GHz band
|
Japan
|
|
2001-05-31 |
|
[ 25 ]
(Rev.1) |
Testing of rain attenuation and total impairment prediction models at high frequency bands for Earth-space paths
|
France, Italy, ESA
|
|
2001-05-31 |
|
[ 24 ]
(Rev.1) |
Liaison statement to ITU-R Working Parties 3J and 3M - Duration of fades and mean time between fades on satellite paths
|
WP 4B
|
|
2001-05-31 |
|
[ 23 ]
(Rev.1) |
Liaison statement to WP 3M on Satellite downlink fading
|
Ch WP 4A
|
|
2001-05-31 |
|
[ 22 ]
(Rev.1) |
Liaison Statement to WP 3M - On frequency sharing between GSO FSS networks and non-GSO FSS systems in the frequency bands 47.2-50.2 GHz and 37.5-42.5 GHz
|
WP 4A
|
|
2001-05-31 |
|
[ 21 ]
(Rev.1) |
Longest Trial Radio HOP in Iran
|
Iran (Islamic Rep. of)
|
|
2001-05-31 |
|
[ 20 ]
(Rev.1) |
Proposed revision to Recommendation ITU-R P.838
|
United Kingdom of Great Britain and Northern Ireland
|
|
2001-05-31 |
|
[ 19 ]
(Rev.1) |
Proposals for the draft revision of Recommendation ITU-R P.530-8
|
Russian Federation
|
|
2001-05-31 |
|
[ 18 ]
(Rev.1) |
LS to WP3M - The percentage pf time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service, and permitting operation of FSS earth stations
|
WP 4-9S
|
|
2001-05-31 |
|
[ 17 ]
(Rev.1) |
Liaison Statement to WP 3M concerning - path planning and system design for fixed service systems in a multipath fading environment
|
WP 9A
|
|
2001-05-31 |
|
[ 16 ]
(Rev.1) |
Proposed revision to Recommendation ITU-R P.681-4 - Propagation data required for the disign of earth-space land mobile telecommunication systems
|
TELENOR AS
|
|
2001-05-31 |
|
[ 15 ]
(Rev.1) |
Liaison statement to Working Party 4-9S and Working Party 4A concerning satellite downlink fading
|
Ch WP 3M
|
|
2001-05-31 |
|
[ 14 ]
(Rev.1) |
Liaison statement from Working Party 1A to Working Party 3M - Propagation aspects of the determination of coordination distance
|
WP 1A
|
|
2001-05-31 |
|
[ 13 ]
(Rev.1) |
Liaison statement to WP 3M concerning Satellite downlink fading
|
WP 4-9S
|
|
2001-05-31 |
|
[ 12 ]
(Rev.1) |
Liaison statement to WP 3M - Sharing between high-density links in the fixed service and other services in the frequency range from 30 GHz to about 50 GHz
|
WP 9D
|
|
2001-05-31 |
|
[ 11 ]
(Rev.1) |
Liaison statement to WP 3M - Multipath fading prediction for link hop lengths less than 7 km
|
WP 9A
|
|
2001-05-31 |
|
[ 10 ]
(Rev.1) |
Liaison statement to Working Party 3M - Information on number of fade events and bringing-into-service time
|
WP 9A
|
|
2001-05-31 |
|
[ 9 ]
(Rev.1) |
Liaison statement to WP 3M concerning the design of digital radio-relay systems
|
WP 9A
|
|
2001-05-31 |
|
[ 8 ]
(Rev.1) |
Liaison statement to WP 3M and JRG 8A-9B concerning Average building attenuation relating to the protection of non-GSO MSS feeder links operating in the band 5 150-5 250 MHz from RLAN interference
|
WP 4A
|
|
2001-05-31 |
|
[ 7 ]
(Rev.1) |
Chairman's Report to next meeting of WP 3M
|
Ch WP 3M
|
|
2001-05-31 |
|
[ 6 ]
(Rev.1) |
Liaison statement to Working Parties 3K and 3M concerning Propagation models for interference assessment for the terrestrial land mobile service in the bands 30 to 3 000 MHz
|
WP 8A
|
|
2001-05-31 |
|
[ 5 ]
(Rev.1) |
Liaison statement to Working Parties 3M and 4A concerning building attenuation at around 5 GHz
|
JRG 8A-9B
|
|
2001-05-31 |
|
[ 4 ]
(Rev.1) |
Liaison statement from Working Party 9A to ITU-R Working Party 3M
|
WP 9A
|
|
2001-05-31 |
|
[ 3 ]
(Rev.1) |
Liaison statement to Working Party 8F concerning propagation considerations in assessing the potential for interference between IMT-2000 and other services
|
Ch WPs 3K & 3M
|
|
2001-05-31 |
|
[ 2 ]
(Rev.1) |
Liaison statement to WPs 8A, 8B and 8D and the relevant groups of SGs 1, 3, 4, 7 and 9
|
WP 8F
|
|
2001-05-31 |
|
[ 1 ]
(Rev.1) |
Liaison statement to Working Parties 3M and 9D - Sharing between high-density links in the fixed service an other services in the frequency range from 30 to about 50 GHz
|
WP 7E
|
|
2001-05-31 |
Resultados :99 documentos Resultados :
Anterior -
1 -
2
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):