Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP8F : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP8F  C 

UIT-R WP8F

Sistemas posteriores a las IMT-2000

Resultados :104 documentos
Resultados :  Anterior -  1 - 2 - 3  - Siguiente Next
Contribuciones  [ Origen: Japan ]  [ AI/Cuestión: 229/8 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 587 ]  
 
Requirements and proposals of new name     Japan   229/8   2005-09-30
[ 586 ]  
 
Consideration on naming issue and future activities     Japan   229/8   2005-09-30
[ 585 ]  
 
Working document towards a PDN Report ITU-R M.[IMT.CANDI]     Japan   229/8   2005-09-30
[ 584 ]  
 
Proposed working method and modification to the working document towards PDNR IMT.SRVC and its micro workplan     Japan   229/8   2005-09-30
[ 583 ]  
 
Proposed text of the main body of the preliminary draft new Recommendation ITU-R M.[IMT.METH]     Japan   229/8   2005-09-30
[ 582 ]  
 
Comments on output document of market report correspondence group activity     Japan   229/8   2005-09-30
[ 567 ]  
 
Verification results of the spectrum calculation tool and proposed improvement on its root-finding algorithm by using Cardano's method for more stable implementation     Japan   229/8   2005-09-07
[ 566 ]  
 
Propose update of test case # 2 for validation of spectrum calculation methodology     Japan   229/8   2005-09-07
[ 561 ]  
 
Proposed modification to working document towards a preliminary draft new Recommendation ITU-R M.[IMT.METH]     Finland and Japan   229/8   2005-09-15
[ 558 ]  
 
Proposed editorial update on Section 5.5.2.7 of the Working Document toward preliminary Draft New Recommendation ITU-R M.[IMT.METH]     Japan   229/8   2005-08-03
[ 556 ]  
 
Update of the preliminary traffic forecast shown in the final response to "Questionnaire on services and market for the future development of IMT-2000 and systems beyond IMT-2000" for section 8, "Market related parameters for spectrum calculation" of the working document towards market report     Japan   229/8   2005-07-26
[ 480 ]  
 
Final response of text cases for validation of spectrum calculation methodology     Japan   229/8   2005-05-27
[ 479 ]  
 
Proposed working document towards draft new Report [IMT.ESTIMATE]     Japan   229/8   2005-05-27
[ 478 ]  
 
Final response to "Questionnaire on Services and Market for the future development of IMT-2000 and systems beyond IMT-2000"     Japan   229/8   2005-05-27
[ 477 ]  
 
Proposal on refined method of distributing traffic for spectrum calculation methodology     Japan   229/8   2005-05-27
[ 474 ]  
 
Proposed modification on modified working document towards a preliminary draft new Report [IMT.MARKET]     Japan   229/8   2005-05-27
[ 473 ]  
 
Proposal for the naming and "what for" issue     Japan   229/8   2005-05-27
[ 470 ]  
 
Comments on output document of MARKET Report Correspondence Group activity     Japan   229/8   2005-05-27
[ 469 ]  
 
Proposed modifications to working document toward a preliminary draft new Recommendation [IMT.METH]     Japan   229/8   2005-05-27
[ 438 ]  
 
First draft of test cases for validation of spectrum calculation methodology     Japan   229/8   2005-04-25
[ 388 ]  
 
Proposed modifications to working document towards preliminary draft new Report [IMT.RAD ASPECTS]     Japan   229/8   2005-01-21
[ 387 ]  
 
Proposed modifications to the radio parameter set for preliminary draft new Report [IMT.RAD ASPECTS] and usage of radio parameters in spectrum calculation methodology     Japan   229/8   2005-01-21
[ 386 ]  
 
Working document towards a draft new Report [IMT.SURVEY]     Japan   229/8   2005-01-21
[ 385 ]  
 
Proposed modification to text of working document towards preliminary draft new Report [IMT.MARKET]     Japan   229/8   2005-01-21
[ 384 ]  
 
Proposed method to reflect the Questionnaire responses in the Market report     Japan   229/8   2005-01-21
[ 383 ]  
 
Initial response to "Questionnaire on Services and Market for the future development of IMT-2000 and systems beyond IMT-2000"     Japan   229/8   2005-01-21
[ 382 ]  
 
Proposed modifications to working document towards preliminary draft new Recommendation [IMT.METH]     Japan   229/8   2005-01-21
[ 381 ]  
 
Proposed method of market data analysys to obtain input parameter values for the spectrum calculation methodology     Japan   229/8   2005-01-21
[ 380 ]  
 
Proposed service grouping for the application of circuit or packet switched traffic calculation and new required capacity calculation for mixed circuit switched traffic     Japan   229/8   2005-01-21
[ 353 ]  
(Rev.1) 
Sensitivity analysis for calculation of system capacity required to fulfil mean delay and delay percantile requirements for further development of working document of preliminary draft new Recommendation [IMT.METH]     Japan   229/8   2004-12-17
[ 351 ]  
 
Alternative queueing model and its analysis for required channel capacity calculation for further development of the working document of preliminary draft new Recommendation [IMT.METH]     Japan   229/8   2004-12-01
[ 350 ]  
(Rev.1) 
Comments for further development of the working document of preliminary draft new Recommendation [IMT.METH]     Japan   229/8   2004-12-01
[ 311 ]  
 
Comments on the candidate frequency bands Questionnaire and proposal for structure of new survey Report [IMT.SURVEY]     Japan   229/8   2004-10-01
[ 309 ]  
 
Proposed modification to Working documents towards preliminary draft new Report [IMT.RAD ASPECTS]     Japan   229/8   2004-10-01
[ 303 ]  
 
Proposed scope, structure and work items of preliminary draft new Report [IMT.ESTIMATE]     Japan   229/8   2004-10-01
[ 300 ]  
 
Proposed modifications and comments for further development of the Working document of preliminary draft new Recommendation [IMT.METH]     Japan   229/8   2004-10-01
[ 298 ]  
 
Proposed modifications for working document - Response to internal liaison statement to SWG SPECALC     Japan   229/8   2004-10-01
[ 297 ]  
 
Proposed revision of Working document toward Market Report     Japan   229/8   2004-10-01
[ 247 ]  
 
Proposed spectrum calculation methodology algorithm for future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-06-07
[ 237 ]  
 
Proposed key service related parameters for spectrum calculation methodology of future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-06-07
[ 236 ]  
 
Proposed revision of working document toward service view document     Japan   229/8   2004-06-04
[ 152 ]  
 
Proposed work items for spectrum calculation methodology for the future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-02-09
[ 150 ]  
 
Proposed structure and text for report on radio aspects for future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-02-06
[ 149 ]  
 
Proposed spectrum calculation methodology for future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-02-09
[ 148 ]  
 
Proposed modifications to guidelines for developing the working document on spectrum calculation methodology of future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-02-09
[ 142 ]  
 
Proposed micro workplan for report on radio aspects for future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2004-02-06
[ 135 ]  
 
Proposed modifications to general principles and the micro workplan on the phrase "The future development of IMT-2000 and systems beyond IMT-2000"     Japan   229/8   2004-02-06
[ 15 ]  
 
Proposed text for Service view document     Japan   229/8   2003-09-22
[ 14 ]  
 
Proposed modifications to workplan and structure of preliminary draft new Report IMT.MARKET/SERV     Japan   229/8   2003-09-22
[ 13 ]  
 
Proposed guidelines for developing the working document on spectrum calculation methodology of future development of IMT-2000 and systems beyond IMT-2000     Japan   229/8   2003-09-22
Resultados :104 documentos
Resultados :  Anterior -  1 - 2 - 3  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2024-7-31