Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP9A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP9A  C 

UIT-R WP9A

Calidad de funcionamiento y disponibilidad, objetivos y análisis de la interferencia, efectos de la propagación y terminología

Resultados :76 documentos
Resultados :  Anterior -  1 - 2
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 26 ]  
 
List of documents issued     BR Study Group Department     2004-09-20
[ 25 ]  
 
Response to liaison statement from Task Group 1/8 to Working Parties 9A and 9D - Technical characteristics of Fixed Wireless Access (FWA) systems deploying indoor terminal stations (TS) operating around 3.5 GHz     United Kingdom of Great Britain and Northern Ireland     2004-09-17
[ 24 ]  
 
Preliminary draft revision of Recommendation ITU-R F.1093-1 - Effects of multipath propagation on the design and operation of line-of-sight digital fixed wireless systems     Brazil (Federative Republic of)     2004-09-24
[ 23 ]  
 
Additional allocation of Working Party 9B documents     Chairman WP 9B     2004-09-15
[ 22 ]  
 
Preliminary draft revision of Recommendation ITU-R F.1330-1 - Performance limits for bringing into service of the parts of international plesiochronous digital hierarchy and synchronous digital hierarchy paths and sections implemented by digital radio-relay systems     Russian Federation   161/9   2004-09-15
[ 21 ]  
 
Proposed revision of PDNR on availability objectives for real digital fixed wireless links used in 27 500 km hypothetical reference paths     Canada   102-4/9   2004-09-14
[ 20 ]  
 
Recommendation ITU-R F.1093 - Effects of multipath propagation on the design and operation of line-of-sight digital radio-relay systems     Australia   122/9   2004-09-03
[ 19 ]  
 
Possible consideration of DNR ITU-R F.[9B/TREND]     Chairman, WP 9B     2004-07-09
[ 18 ]  
 
Liaison statement to Working Parties 9A and 9D - Fixed wireless access (FWA) systems - Deployment characteristics and protection requirements for indoor deployed terminal stations (TS)     TG 1/8     2004-06-24
[ 17 ]  
 
Liaison statement to ITU-R Working Party 9A - Status of Recommendation ITU-R M.2301     ITU-T SG4     2004-05-25
[ 16 ]  
+Ann.1-5 
Report of the meeting of Working Party 9A - Geneva, 19-26 February 2004     Chairman, WP 9A     2004-03-01
[ 15 ]  
 
Final List of Participants - Working Party 9A     Director, BR     2004-02-25
[ 14 ]  
 
List of documents issued     BR Study Group Department     2004-02-18
[ 13 ]  
 
Additional allocation of a WP 9B document     Chairman, WP 9B     2004-02-12
[ 12 ]  
(Rev.1) 
Contribution to the long-term interference objective for coexistence between ultra-wide band (UWB) short range radars (SRR) for automotive applications and the fixed service in the bands around 24 GHz     Robert Bosch GMBH , Siemens AG     2004-02-10
[ 11 ]  
 
Preliminary draft new Recommendation - Availability objectives for real digital fixed wireless links used in 27 500 km hypothetical reference paths     Russian Federation   102/9   2004-02-09
[ 10 ]  
 
Performance objectives for fixed wireless systems carrying Internet protocol communications services     Canada     2004-01-29
[ 9 ]  
 
Liaison statement from Working Parties 3J and 3M - Impact of Recommendation ITU-R P.837-4 on FS link design using rain attenuation calculations in Recommendation ITU-R P.530-10     WPs 3J and 3M     2003-12-22
[ 8 ]  
 
Liaison statement to Working Party 4-9S and Working Party 9A for information - Request for additional information concerning rain fade events and statistics in the bands 37.5-40.0 GHz and 42.0-42.5 GHz     WPs 3J and 3M     2003-12-19
[ 7 ]  
 
Liaison statement to WP 9A - ITU-T Recommendations M.2110, M.2120 and M.2301     ITU-T SG 4     2003-11-18
[ 6 ]  
 
Liaison statement to WPs 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9A and 9D - Working material towards draft new Recommendation ITU-R SM.[ ] - Interference criteria for the evaluation of harmful effect of interference between radiocommunication networks operating in a shared frequency band     WP 1B     2003-11-13
[ 5 ]  
 
Summary of results of RA-03, WRC-03 and CPM06-1     Chairman, SG 9     2003-11-05
[ 4 ]  
 
Liaison statement to WP 9D (for action) and to WP 9A (for information) - Use of interference scenario occurrence probability (ISOP) on long-term interference objective and aggregate interference limits for coexistence between ultra-wideband short range radars for automotive applications and the fixed service in the bands around 24 GHz     TG 1/8     2003-11-04
[ 3 ]  
 
Liaison statement on the NGN 2004 ITU-T project     ITU-T SG 13     2003-08-25
[ 2 ]  
 
Liaison statement - Consent of draft revised Recommendation G.827     ITU-T SG 13     2003-08-25
[ 1 ]  
 
Documents to be carried over from the 2000-2003 study period     N/A (no se aplica)     2003-07-21
Resultados :76 documentos
Resultados :  Anterior -  1 - 2  
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2003-08-25