Contribuciones
[ AI/Cuestión: AI7 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 579 ]
|
Proposal for updates to working document towards draft CPM text for WRC-19 agenda item 7, Issue A
|
China (People's Republic of)
|
AI7
|
2018-02-13 |
|
[ 576 ]
|
Proposal for revision of the working document towards preliminary draft CPM text for WRC-19 agenda item 7, Issue G
|
Bulgaria (Republic of)
|
AI7
|
2018-02-12 |
|
[ 575 ]
|
Proposals for text of Resolution YYY to the draft CPM text on method C to WRC-19 agenda item 7 - Issue G
|
Bulgaria (Republic of)
|
AI7
|
2018-02-12 |
|
[ 574 ]
|
Measures to facilitate entering new assignments into the RR Appendix 30B List
|
Norway
|
AI7
|
2018-02-12 |
|
[ 566 ]
|
Proposals to working document towards draft CPM text for WRC-19 agenda item 7 - Issue F -
|
Russian Federation
|
AI7
|
2018-02-12 |
|
[ 560 ]
|
Input on preliminary draft CPM text for WRC-19 agenda item 7 - Issue K
|
Papua New Guinea
|
AI7
|
2018-02-12 |
|
[ 558 ]
|
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 7 - Issue J
|
Korea (Republic of)
|
AI7
|
2018-02-08 |
|
[ 554 ]
|
Modifications to the draft CPM text of agenda item 7, Issue B
|
Spain
,
HISPASAT, S.A.
|
AI7
|
2018-02-07 |
|
[ 548 ]
|
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit
|
Japan
|
AI7
|
2018-02-06 |
|
[ 547 ]
|
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
|
Japan
|
AI7
|
2018-02-06 |
|
[ 546 ]
|
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
|
Japan
|
AI7
|
2018-02-06 |
|
[ 510 ]
|
Liaison statement to Working Party 4A - RR Appendix 4 data elements to be provided for non-geostationary satellite systems
|
WP 4C
|
AI7
|
2017-10-16 |
|
[ 498 ]
|
WRC-19 agenda item 7 issue A
|
Luxembourg
|
AI7
|
2017-10-10 |
|
[ 488 ]
|
WRC-19 agenda item 7, issue A - Proposal for a milestone-based system to verify compliance of use of frequency assignments to non-Geostationary FSS systems with their associated notified characteristics
|
France
|
AI7
|
2017-10-10 |
|
[ 480 ]
|
Proposed changes to working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue G: Updating the reference situation for networks under RR Appendices 30 and 30A when provisional recording is used
|
Norway
|
AI7
|
2017-10-10 |
|
[ 478 ]
|
Justification statistics of RR Appendix 30B - On WRC-19, Issue E and New Issues X and Y
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-10 |
|
[ 473 ]
|
Agenda item 7, issue C - Issues for which consensus was readily achieved in ITU-R - Studies concerning the return of frequency notices under Radio Regulation (RR) no. 11.38 (C5)
|
United States of America
|
AI7
|
2017-10-10 |
|
[ 461 ]
|
Input on working document - Issue F: Concerns with the lack of implementation of certain provisions of the Radio Regulations that can lead to difficulties during the process of entering an assignment into the RR Appendix 30B list
|
United States of America
|
AI7
|
2017-10-10 |
|
[ 459 ]
|
Revisions to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
|
United States of America
|
AI7
|
2017-10-10 |
|
[ 453 ]
|
Preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Issues for which consensus was readily achieved in ITU-R
|
China (People's Republic of)
|
AI7
|
2017-10-10 |
|
[ 439 ]
|
Annex 37 to Working Party 4A Chairman's Report - Preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13
|
United Kingdom of Great Britain and Northern Ireland
|
AI7
|
2017-10-09 |
|
[ 438 ]
|
Regulatory provisions for the modification of notices relative to non-geostationary systems operating in the FSS, MSS and BSS above 10 GHz subject to Section II of Article 9 of the Radio Regulations
|
United Kingdom of Great Britain and Northern Ireland
|
AI7
|
2017-10-09 |
|
[ 436 ]
|
Principles and a proposed methodology for issue a of WRC-19 - Agenda item 7
|
United Kingdom of Great Britain and Northern Ireland
|
AI7
|
2017-10-09 |
|
[ 431 ]
|
Proposal for revision of the working document towards preliminary draft CPM text for WRC-19 agenda item 7, issue G
|
Bulgaria (Republic of)
|
AI7
|
2017-10-09 |
|
[ 430 ]
|
Working document towards draft CPM text on WRC-19 agenda item 7, new issue Y
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-09 |
|
[ 429 ]
|
Working document towards draft CPM text on WRC-19 agenda item 7, new issue X
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-09 |
|
[ 428 ]
|
Preliminary draft CPM text for WRC-19 agenda item 7 - Issue E
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-09 |
|
[ 427 ]
|
Working document towards draft CPM text on agenda item 7, issue C3
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-09 |
|
[ 426 ]
|
Working document towards draft CPM text on WRC-19 agenda item 7, issue C2
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-09 |
|
[ 425 ]
|
Working document towards draft CPM text on WRC-19 agenda item 7, issue C1
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-09 |
|
[ 421 ]
|
Proposed new issue X under WRC-19 agenda item 7 - Difficulties for Part B examinations under & 6.21 C) of RR Appendix 30B
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-10-09 |
|
[ 420 ]
|
Proposed modification to preliminary draft CPM text for WRC-19 agenda item 7 issue C6
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-10-09 |
|
[ 418 ]
|
Observations on procedural issues related to the application of a possible revision to Recommendation ITU-R S.1503-2
|
Canada
|
AI7
|
2017-10-06 |
|
[ 417 ]
|
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S. [NGSO_FSS_BIU]
|
Canada
|
AI7
|
2017-10-06 |
|
[ 416 ]
|
Comments and proposals relating to Issue C3 under agenda item 7
|
Canada
|
AI7
|
2017-10-06 |
|
[ 415 ]
|
Proposed modifications to the preliminary draft CPM Report on agenda item 7 Issue D
|
Canada
|
AI7
|
2017-10-06 |
|
[ 414 ]
|
Proposed preliminary CPM Report for Issue H under agenda item 7
|
Canada
|
AI7
|
2017-10-06 |
|
[ 407 ]
|
Consideration of the difficulties for examination under § 6.21 of RR Appendix 30B - Agenda item 7
|
Director, BR
|
AI7
|
2017-10-04 |
|
[ 406 ]
|
Consideration of definitive service areas of affected networks during the process of entering an assignment into the RR Appendix 30B list - Agenda item 7
|
Director, BR
|
AI7
|
2017-10-04 |
|
[ 405 ]
|
WRC-19 agenda item 7 - Issue F - Concerns with the lack of implementation of certain provisions of the Radio Regulations that can lead to difficulties during the process of entering an assignment into the RR Appendix 30B List
|
Director, BR
|
AI7
|
2017-10-03 |
|
[ 399 ]
|
Consideration on the reference EPM - In relation to issue G under agenda item 7
|
Japan
|
AI7
|
2017-10-03 |
|
[ 398 ]
|
Proposal for inclusion of an issue under WRC-19 agenda item 7 - Modification of Section 1, Annex 1 of RR Appendix 30
|
Japan
|
AI7
|
2017-10-03 |
|
[ 397 ]
|
Proposal for the modification to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
|
Japan
|
AI7
|
2017-10-03 |
|
[ 392 ]
|
WRC-19 agenda item 7 Issue B, clarifications and regulatory text
|
Spain
|
AI7
|
2017-09-20 |
|
[ 348 ]
|
Variations of non-geostationary satellite parameters between coordination and notification
|
France
|
AI7
|
2017-04-26 |
|
[ 335 ]
|
Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Modification of the Luxembourg option (option 4), related to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems
|
Luxembourg
|
AI7
|
2017-04-26 |
|
[ 334 ]
|
Proposed new issue X under WRC-19 agenda item 7 - Submission of one set of Appendix 4 data under Appendix 30B for treatment both in respect of entering into the List and in respect of Notification
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-04-26 |
|
[ 333 ]
|
Proposed new issue Y under WRC-19 agenda item 7 - Submission of one notice under Appendices 30 and 30A for treatment both in respect of entering into the List and in respect of Notification
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-04-26 |
|
[ 323 ]
|
Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F
|
Egypt (Arab Republic of)
,
Djibouti (Republic of)
,
Kuwait (State of)
,
Oman (Sultanate of)
,
Qatar (State of)
,
United Arab Emirates
|
AI7
|
2017-04-26 |
|
[ 322 ]
|
Consideration to the difficulties for PARTB examinations in accordance with RR No. 6.17 of Appendix 30B - WRC-19 agenda item 7 - Issue XXX
|
Saudi Arabia (Kingdom of)
,
Bahrain (Kingdom of)
,
Djibouti (Republic of)
,
Egypt (Arab Republic of)
,
Oman (Sultanate of)
,
Saudi Arabia (Kingdom of)
|
AI7
|
2017-04-26 |
Resultados :132 documentos Resultados :
Anterior -
1 -
2 -
3
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):