Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP7C : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP7C  C 

UIT-R R23-WP7C

Sistemas de Detección a Distancia

Resultados :156 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 106 ]  
 
Studies on possible allocations to the Earth exploration-satellite service (passive) in the bands 4 200-4 400 MHz and 8 400-8 500 MHz     United States   AI1.19   2024-08-26
[ 105 ]  
 
Proposed initial framework of the working document on studies under WRC-27 agenda item 1.17 - Initial framework of the working document on studies under WRC-27 agenda item 1.17     United States   AI1.17   2024-08-26
[ 104 ]  
 
Preliminary draft new Report ITU-R RS series - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections     United States     2024-08-26
[ 103 ]  
 
Working document towards a preliminary draft revised Recommendation ITU-R RS.577-7     United States     2024-08-26
[ 102 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R RS.[2105-2 + RADAR SOUNDER]     United States     2024-08-26
[ 101 ]  
 
Working document towards preliminary draft new Report ITU-R [EESS(PASSIVE) COMPATIBILITY ABOVE 76 GHZ]     United States   AI1.18   2024-08-26
[ 100 ]  
 
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.14     United States   AI1.14   2024-08-26
[ 99 ]  
 
Proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.11     United States   AI1.11   2024-08-26
[ 98 ]  
 
Proposed liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6     United States   AI1.6   2024-08-26
[ 97 ]  
 
Proposed reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.4     United States   AI1.4   2024-08-26
[ 96 ]  
 
Committee on the Peaceful Uses of Outer Space: 2024 - Sixty-seventh session (19-28 June 2024) - Space sustainability issues     Brazil     2024-08-26
[ 95 ]  
 
Liaison statement to ITU-R Working Parties 5B and 7C - WRC-27 agenda item 1.19 - Proposed technical parameters and operating scenarios to consider in studies between Earth exploration-satellite service (passive), and radio altimeters and Wireless Avionics Intra Communications operating in the 4 200-4 400 MHz frequency band     International Civil Aviation Organization   AI1.19   2024-08-22
[ 94 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 93 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-07-08
[ 92 ]  
 
Initial reply liaison statement to Working Parties 7B and 7C - Relevant technical information to support studies under WRC-27 agenda items 1.15, 1.17 and 1.19     WP 5D   AI1.19, AI1.17, AI1.15   2024-07-08
[ 91 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 90 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power     WP 1A     2024-06-21
[ 89 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)     WP 1A     2024-06-21
[ 88 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17     WPs 3L and 3M   AI1.17   2024-06-12
[ 87 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 3M   AI1.1   2024-06-12
[ 86 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 3M   AI1.2   2024-06-12
[ 85 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4     WP 3M   AI1.4   2024-06-12
[ 84 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WPs 3L and 3M   AI1.14, AI1.13, AI1.12, AI1.11   2024-06-12
[ 83 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3     WP 3M   AI1.3   2024-06-12
[ 82 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation for WRC-27 agenda item 1.8     WPs 3J, 3K and 3M   AI1.8   2024-06-12
[ 81 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18     WPs 3J and 3M   AI1.18   2024-06-12
[ 80 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19     WPs 3J and 3M   AI1.19   2024-06-12
[ 79 ]  
 
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74     SG 4     2024-06-12
[ 78 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 3J   AI1.15   2024-06-12
[ 77 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WPs 3J and 3M   AI1.10   2024-06-11
[ 76 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WPs 3K and 3M   AI1.7   2024-06-10
[ 75 ]  
 
Reply liaison statement to Working Party 7C - Working document towards a preliminary draft new Report ITU-R M.[FOD_EESS_SHARE]     WP 5B     2024-05-30
[ 74 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15     WP 5C   AI1.15   2024-05-29
[ 73 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13     WP 5C   AI1.13   2024-05-29
[ 72 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7     WP 5C   AI1.7   2024-05-29
[ 71 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 3M, 4A, 5A, 5B, 5D and 7B for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.19     WP 5C   AI1.19   2024-05-29
[ 70 ]  
 
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WP 5C   AI1.10   2024-05-29
[ 69 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 3J, 3M, 4A, 4C, 5A and 5B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials     WP 5C   AI1.18   2024-05-29
[ 68 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 6B, and 7C for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.4     WP 5C   AI1.4   2024-05-29
[ 67 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.3     WP 5C   AI1.3   2024-05-29
[ 66 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7     WP 5B   AI1.7   2024-05-28
[ 65 ]  
 
Reply liaison statement to Working Party 7C (copy to ICAO for information) - Relevant technical information for sharing studies under WRC-27 agenda item 1.19     WP 5B   AI1.19   2024-05-28
[ 64 ]  
 
Reply liaison statement to Working Party 7C - Relevant technical information for sharing studies under WRC-27 agenda item 1.17     WP 5B   AI1.17   2024-05-27
[ 63 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 5B   AI1.2   2024-05-21
[ 62 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5C, and 7D (copy to Working Party 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8     WP 5B   AI1.8   2024-05-21
[ 61 ]  
 
Reply liaison statement to Working Part 7C- Relevant technical information to support studies under WRC-27 agenda item 1.18     WP 5B   AI1.18   2024-05-20
[ 60 ]  
 
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.3     WP 4A   AI1.3   2024-05-17
[ 59 ]  
 
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.1     WP 4A   AI1.1   2024-05-17
[ 58 ]  
 
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A, 5B, 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18     WP 4A   AI1.18   2024-05-15
[ 57 ]  
 
Reply liaison statement to Working Party 7C regarding WRC-27 agenda item 1.17 - Technical information to support studies under WRC-27 agenda item 1.17     WP 4A   AI1.17   2024-05-15
Resultados :156 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2024-10-08