Contribuciones Tardías |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 406 ]
|
Application of MPLS to CO-PS Transport
|
Tellabs Oy
|
Q12/15
|
2005-05-05 |
|
[ 405 ]
|
Neighbor Discovery and the SDH Equipment Model
|
Tellabs Oy
|
Q14/15
|
2005-05-05 |
|
[ 404 ]
|
SCN for Multi-layer Routing/Signalling and G.asm
|
Tellabs Oy
|
Q14/15
|
2005-05-05 |
|
[ 403 ]
|
Discussion of new Recommendation G.ats (Characteristics of future adaptive transport system)
|
NTT
|
Q7/15, Q6/15
|
2005-05-05 |
|
[ 402 ]
|
IEEE1588TM Overview
|
Zarlink Semiconductor
|
Q13/15
|
2005-05-04 |
|
[ 401 ]
|
ADSL: Support of time domain shaping for ADSL2/ADSL2+
|
STMicroelectronics
|
Q4/15
|
2005-05-05 |
|
[ 400 ]
|
Draft ITU-T Recommendation G.984.4 Amendment 1 (Rev. 0.3)(for consent)
|
Editors Rec. G.984.4
|
Q2/15
|
2005-05-05 |
|
[ 399 ]
|
Draft new Amendment 3 to Recommendation G.992.5 (for consent)
|
Editor Rec. G.992.5
|
Q4/15
|
2005-05-04 |
|
[ 398 ]
|
Draft new Amendment 6 to Recommendation G.992.3 (for consent).
|
Editor Rec. G.992.3
|
Q4/15
|
2005-05-04 |
|
[ 397 ]
|
Draft new Amendment 5 to Recommendation G.992.3 (for consent)
|
Editor Rec. G.992.3
|
Q4/15
|
2005-05-04 |
|
[ 396 ]
|
Draft new Amendment 4 to Recommendation G.992.5 (for consent)
|
Editor Rec. G.992.5
|
Q4/15
|
2005-05-04 |
|
[ 395 ]
|
Draft revised Recommendation G.997.1 (rev2) (for consent)
|
Editor Rec. G.997.1
|
Q4/15
|
2005-05-04 |
|
[ 394 ]
|
G.VDSL: VDSL2 Performance loss in dual latency path operation with interleaving on both paths
|
Alcatel Bell
|
Q4/15
|
2005-05-04 |
|
[ 393 ]
|
Draft Corrigendum for Rec. Y.1720 (for consent)
|
Editors Rec. Y.1720
|
Q9/15
|
2005-05-04 |
|
[ 392 ]
|
Draft Text for Amendment 3 G.991.2 - TPS-TC for PTM Transport (64/65 octet based) (for consent)
|
Editor Rec. G.991.2
|
Q4/15
|
2005-05-04 |
|
[ 391 ]
|
G.vdsl2: The way forward
|
Infineon Tehnologies AG
,
Siemens
,
Ciena
|
Q4/15
|
2005-05-04 |
|
[ 390 ]
|
ETH functional architecture considerations
|
KPN
|
Q12/15
|
2005-05-05 |
|
[ 389 ]
|
G.VDSL2: Constructing VDSL2 PSDs
|
Swisscom
,
BT
,
France Telecom
,
TeliaSonera
|
Q4/15
|
2005-05-04 |
|
[ 388 ]
|
G.VDSL2: 998 related Band Plans and PSD Definitions for a European Regional Annex
|
Swisscom
,
France Telecom
|
Q4/15
|
2005-05-04 |
|
[ 387 ]
|
G.VDSL2: Proposal for a Regional Annex (Europe)
|
Swisscom
,
France Telecom
|
Q4/15
|
2005-05-04 |
|
[ 386 ]
|
IEEE 1588 : PAR work and field trial results, with reference to G.pactiming
|
Semtech
|
Q13/15
|
2005-05-04 |
|
[ 385 ]
|
Application codes at 2.5 G in G.dapp
|
Alcatel
|
Q6/15
|
2005-05-04 |
|
[ 384 ]
|
Spectral excursion of 2.5Gb/s DML for G.dapp
|
Alcatel
|
Q6/15
|
2005-05-04 |
|
[ 383 ]
|
WITHDRAWN
|
N/A (no se aplica)
|
Q6/15
|
2005-05-04 |
|
[ 382 ]
|
ADSL: G.vdsl: Clarifying the purpose of the A/VDSL reference impedance model
|
Infineon Technologies AG
|
Q4/15
|
2005-05-04 |
|
[ 381 ]
|
G.pactiming - Clock Recovery with Time Stamps (Common Clock)
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 380 ]
|
G.pactiming - Exploiting PDV Non-Gaussianity
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 379 ]
|
G.pactiming - Transport of SDH over PSNs
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 378 ]
|
G.pactiming - Timing Recovery Scenarios
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 377 ]
|
G.pactiming - Proposed Text for Scope
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 376 ]
|
G.pactiming - Use of G.805/G.809 Functional Diagrams
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 375 ]
|
G.pactiming - The Effect of Packet Loss and Misordering on Timing Recovery
|
Israel MOC
|
Q13/15
|
2005-05-04 |
|
[ 374 ]
|
Draft VDSL2 text improvements for section 7, annex K and annex N
|
Alcatel Bell
|
Q4/15
|
2005-05-04 |
|
[ 373 ]
|
VDSL2: Proposal for support of multiple bearer channels to be optional
|
Alcatel Bell
|
Q4/15
|
2005-05-04 |
|
[ 372 ]
|
Proposal for developing Ethernet Control Plane requirements
|
Marconi
|
Q12/15
|
2005-05-04 |
|
[ 371 ]
|
The relationship between MEP and MIP and corresponding MAC addresses
|
Marconi
|
Q12/15
|
2005-05-04 |
|
[ 370 ]
|
G.VDSL: VDSL2 Virtual Noise Mechanism: Proposed update of working text
|
Alcatel Bell
|
Q4/15
|
2005-05-04 |
|
[ 369 ]
|
G.VDSL: VDSL2 PSD Mask Control: Proposed Update of working text
|
Alcatel Bell
|
Q4/15
|
2005-05-04 |
|
[ 368 ]
|
G.gen: Proposals for addressing loops of intermediate length
|
India
|
Q4/15
|
2005-05-04 |
|
[ 367 ]
|
VDSL: Proposal for an early exchange of test parameters in Loop Diagnostics mode
|
LM Ericsson
|
Q4/15
|
2005-05-04 |
|
[ 366 ]
|
VDSL2: Editorial changes to VDSL2 draft text
|
Siemens
|
Q4/15
|
2005-05-04 |
|
[ 365 ]
|
Proposal for new text in Appendix I of G.695
|
Telenor
|
Q6/15
|
2005-05-04 |
|
[ 364 ]
|
Requirements for transport MPLS
|
BT
|
Q12/15
|
2005-05-04 |
|
[ 363 ]
|
Modification to G.809 and Proposal for New Text as Part of G.mta
|
BT
|
Q12/15
|
2005-05-04 |
|
[ 362 ]
|
ETH AIS processing in p2p and mp connections
|
Alcatel
|
Q9/15
|
2005-05-04 |
|
[ 361 ]
|
Fragments
|
BT
|
Q12/15
|
2005-05-04 |
|
[ 360 ]
|
G.otf objective and way forward
|
Italy
|
Q7/15, Q6/15
|
2005-05-04 |
|
[ 359 ]
|
Proposals for an extension of G.dapp
|
Italy
|
Q6/15
|
2005-05-04 |
|
[ 358 ]
|
Black link approach for long distance DWDM systems
|
Italian Ministry of Communications
|
Q6/15
|
2005-05-04 |
|
[ 357 ]
(Rev.1) |
Fibres for Optical Access Networks
|
Italy
|
Q5/15
|
2005-05-04 |
Resultados :281 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):