Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2009-09-28 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2009-09-28) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2009-09-28 al 2009-10-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Resultados :399 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 697 ]  
 
Extension of APS for Generic Dual Node Interconnection Protection     Huawei Technologies   Q9/15   2009-09-20
[ 696 ]  
 
Supervisory system for optical fibre submarine cable systems     Huawei Technologies   Q8/15   2009-09-20
[ 695 ]  
 
Introduce OTN interface into Optical Submarine Cable Systems     Huawei Technologies , China Unicom   Q8/15   2009-09-20
[ 694 ]  
 
Definition of COTDR parameters     Huawei Technologies   Q8/15   2009-09-20
[ 693 ]  
 
Proposal for 10G bitrate submarine optical signal     Huawei Technologies   Q8/15   2009-09-20
[ 692 ]  
 
Proposal for OSNR parameter values at point RS for 10G/50GHz application codes in G.698.2     Huawei Technologies   Q6/15   2009-09-20
[ 691 ]  
 
Proposal for new sub-clauses into G.696.1 about mixed 10G/40G/100G transmission     Huawei Technologies   Q6/15   2009-09-20
[ 690 ]  
 
Proposal on the state machine and APS PDU in G.8031     Huawei Technologies   Q9/15   2009-09-20
[ 689 ]  
 
Proposal on ACL-SNCG/I protection switching for microwave network in G.8031     Huawei Technologies   Q9/15   2009-09-20
[ 688 ]  
 
Proposal on extending linear protection switching for variable link in G.808.1     Huawei Technologies   9/15   2009-09-20
[ 687 ]  
 
QL to clockClass mapping     Huawei Technologies , France Telecom Orange   Q13/15   2009-09-20
[ 686 ]  
 
Discussion of G.8264.1 Message Forwarding Behaviour     Huawei Technologies   Q13/15   2009-09-20
[ 685 ]  
 
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates     Huawei Technologies , CATR , MII   Q13/15   2009-09-20
[ 684 ]  
(Rev.1) 
Proposal on adding bandwidth notification function in G.808.1 and G.8031     Huawei Technologies   Q9/15   2009-09-20
[ 683 ]  
 
G.800 Transport Entities     Huawei Technologies   Q12/15   2009-09-20
[ 682 ]  
 
Discussion on the use of PTP domains in the PTPv2 telecom profile frequency-oriented     France Telecom Orange   Q13/15   2009-09-20
[ 681 ]  
 
Application of IEEE1588-2008 sections A.9 (recommendation for unicast), 17.5 (unicast discovery) and 17.6 (acceptable master table) to the PTPv2 telecom profile frequency-oriented     France Telecom Orange   Q13/15   2009-09-20
[ 680 ]  
 
Unicast message negotiation notes and corrections     France Telecom Orange   Q13/15   2009-09-20
[ 679 ]  
 
Discussion on Synchronous Ethernet jitter specification     France Telecom Orange   Q13/15   2009-09-20
[ 678 ]  
 
Application of IEEE1588-2008 section 19.3 to the PTPv2 telecom profile frequency-oriented     France Telecom Orange   Q13/15   2009-09-20
[ 677 ]  
 
Use of physical methods to deliver timing in a multi-operator context     France Telecom Orange   Q13/15   2009-09-20
[ 676 ]  
 
OTN island wander budget     France Telecom Orange   Q13/15   2009-09-20
[ 675 ]  
 
Options to be considered for the definition of an Alternate BMCA in the scope of the PTPv2 telecom profile frequency-oriented     France Telecom Orange   Q13/15   2009-09-20
[ 674 ]  
 
Ordinary clock attributes and data sets     France Telecom Orange   Q13/15   2009-09-20
[ 673 ]  
 
Methodology for PDV network limits definition     France Telecom Orange   Q13/15   2009-09-20
[ 672 ]  
 
Editorial comments in the latest draft of G.8264.1 (PTPv2 telecom profile frequency-oriented)     France Telecom Orange   Q13/15   2009-09-20
[ 671 ]  
 
Discussion on the BMCA requirements of the PTPv2 telecom profile frequency-oriented     France Telecom Orange   Q13/15   2009-09-20
[ 670 ]  
 
Discussion about the use of an "acceptable slave table" new feature in the PTPv2 telecom profile frequency-oriented     France Telecom Orange   Q13/15   2009-09-20
[ 669 ]  
 
France Telecom view on the approval of Recommendation G.9960     France Telecom Orange   Q4/15   2009-09-20
[ 668 ]  
 
Performance aspects of a packet slave clock targeting 50ppb and based on a physical clock with a large time constant and PDV accumulation discussions     France Telecom Orange   Q13/15   2009-09-20
[ 667 ]  
 
Improve Main ring flushing due to sub-ring topology change through Port based flushing     Tejas Networks Ltd   Q9/15   2009-09-20
[ 666 ]  
 
FS operation during node failure     Tejas Networks Ltd   Q9/15   2009-09-20
[ 665 ]  
 
BPR Operation     Tejas Networks Ltd   Q9/15   2009-09-20
[ 664 ]  
 
Traffic Black Holing with Multiple Failures     Tejas Networks Ltd   Q9/15   2009-09-20
[ 663 ]  
 
Definitions of unidirectional support for Synchronous Ethernet.     Tellabs   Q13/15   2009-09-20
[ 662 ]  
 
Discussion on providing an accurate time synchronization service using the native capabilities of time capable network technologies.     Tellabs , France Telecom Orange   Q2/15   2009-09-20
[ 661 ]  
 
G.hn: Support of variable AIFG in G.hn     DS2   Q4/15   2009-09-20
[ 660 ]  
 
G.hn: Proposed text modification for section 8.11 (Channel estimation protocol)     DS2   Q4/15   2009-09-20
[ 659 ]  
 
G.hn: Update of the IFG-related text of 8.2, 8.3     Infineon Technologies AEG   Q4/15   2009-09-20
[ 658 ]  
 
G.hn: Proposed text for TS grid synchronization recovery     DS2   Q4/15   2009-09-20
[ 657 ]  
 
G.hn: Text updates for Acknowledgement Protocol operation     DS2   Q4/15   2009-09-20
[ 656 ]  
 
G.hn: Transmission and reception window operation in Multicast traffic with Acks.     DS2   Q4/15   2009-09-20
[ 655 ]  
 
G.hn: Flexible PHY-frame header extension     DS2   Q4/15   2009-09-20
[ 654 ]  
 
G.hn: Updated proposal on topology discovery and routing calculation     DS2   Q4/15   2009-09-20
[ 653 ]  
 
Proposal for RMAP Relaying     DS2   Q4/15   2009-09-20
[ 652 ]  
 
Status of Support for Relays in G.hn     DS2   Q4/15   2009-09-20
[ 651 ]  
 
Proposal for Registration via Relays     DS2   Q4/15   2009-09-20
[ 650 ]  
 
Updated proposal for Neighbor Networks Support     DS2   Q4/15   2009-09-20
[ 649 ]  
 
Adding FLOWID/PRIO field to ACK Frame Type     DS2   Q4/15   2009-09-20
[ 648 ]  
 
Proposal for Authentication via Relays     DS2   Q4/15   2009-09-20
Resultados :399 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-11-19